Abstract

Simulation programs are increasingly being used to solve material flow problems. These programs are primarily used for the simulation of production or transport processes. Testing of a new type of control in-process would mean stopping production and testing experiments with uncertain results. To avoid this lengthy and above all expensive way of any change, simulation programs have been used. Simulations of production processes in these programs enable better production planning and examination of bottlenecks in the production process by proposing changes, such as robots, conveyors, or also various logistics controls. The advantage is not only the fact that the production does not have to be interrupted, but also that it is possible to try many different experiments in a simulation process. The article is focused on the analysis of the production process in a selected production enterprise. After the analysis, the Tecnomatix Plant Simulation program was used for the creation of production process simulation. Results and improvements to the production process were proposed from the initial simulation with a focus on practical use.

1 Introduction

In today’s world, manufacturing companies are under increasing pressure from customers. Customers have great options in choosing the product they want to buy. They also have increasingly demanding requirements for their selected products. For companies to remain competitive with other companies, they must fully meet the wishes and needs of their customers, which means responding flexibly to modern trends. Rising competition, market globalization, lows costs, available new technology, or changes in living standards, etc., present several variables which have a great impact on manufacturing enterprises today [1]. As mentioned in ref. [2], the prediction of market behavior is very helpful for a manufacturing enterprise to build efficient production systems. Authors in this publication emphasized the development of more flexible production systems which are important for the adaptation of market changes. One of the key elements or tools for the solution of the above said problems are presented by simulation. It is possible to say that simulation presents an area of production and logistics which is a well-accepted tool, for example for planning and evaluation of processes [3]. As presented in ref. [4], simulation is a well-established model-based analysis method for a lot of applications in this domain and very actual trend in production and logistics.

A simulation is a helpful tool for the understanding of production systems and also it can be able to present different types of solutions with high application in practice. Simulation helps to develop more flexible production systems and also can improve the quality of the systems and of course at lower production costs [5]. The simulation presents a very important tool of technological tools and also methods that help the successful implementation of digital production and manufacturing, for example as mentioned in ref. [6]. This is very important in todays’ turbulent manufacturing environment [6]. Simulation can be used for planning solutions in production environments [7], optimization of enterprise processes [8,9], and also for planning and control of production [10,11]. The use and application of simulation programs are deeply wedded to the simulation approach. Simulation programs are increasingly being used to solve material flow problems in companies. These programs are mainly used to simulate the production or transport process without production process disruption [12]. Testing a new type of operation during the in-process control would mean stopping production and testing experiments with uncertain results. To avoid this lengthy and, above all, expensive (due to the impossibility of production) method of any change, simulation programs have been used [13]. The simulation of production processes enables better production planning and examination of bottlenecks and problematic parts in the production by the proposal of changes, or various logistics processes [14]. The advantage is not only that the production does not have to be interrupted but also that in a simulated process it is possible to try many different experiments. These experiments simulate months or years, and with this, can be created plans for production for the next period and evaluate the benefits of a change in the course of the process [15]. But a very important part of the simulation is presentation and explanation of the simulation results. Because wrong simulation results, which are translated into wrong decision proposals with the next implementation, can imply cost with a higher magnitude than the total cost of the simulation study [16]. The aim of the case study is to model the production process in a selected production enterprise, model of weak (bottlenecks), and activities that may affect the continuity of the production activities. The case study tries to provide proposals for improvement which will bring possible solutions in the production process. The partial aims of the study were: analysis of the current state of the evaluated production enterprise, formation of the simulation for the production process, analysis of the simulation results, and proposals for improvements in the production process.

2 Analyzed data

The evaluated production enterprise has three buildings (halls), one office building, and a free-standing building, in which one of the production processes is situated (dryer of wood). There is a hack saw in the first hall (Figure 1, red line), this saw is used for round log processing. The saw is not automated, it is controlled by a worker. The round log is stored in the first hall. After the log processing, the semi-finished products are stored in a warehouse located in the first hall behind the frame saw. In-house transport among these production steps is realized by a high-lift truck. The second hall is for the processing of semi-finished products. This involves grinding and cutting to specific lengths, according to the order form. In-house transport is provided manually. This type of transport was chosen due to the fact that there is not enough space for handling a high-lift truck or pallet equipment. The third hall involves other production steps, namely drilling, milling, and gluing to the final shape (form). There is also a surface treatment of these products. Among these steps, in-house transport is also manual. The last station in this production hall is the packaging workplace.

Figure 1 
               Layout of buildings of the production enterprise (red line – production hall, blue line – production hall, yellow line – production hall, pink building – drying chamber, green building – administrative building). Source: authors.
Figure 1

Layout of buildings of the production enterprise (red line – production hall, blue line – production hall, yellow line – production hall, pink building – drying chamber, green building – administrative building). Source: authors.

2.1 Production process

The evaluated enterprise has a production process divided into three halls (buildings) and a dryer located next to these halls. Figure 2 presents the production process of this enterprise and Table 1 presents the times of production steps for the evaluated production process.

Figure 2 
                  Production process (scheme of the production process). Source: authors.
Figure 2

Production process (scheme of the production process). Source: authors.

Table 1

Times of production steps

Time of round log processing 20 min
Drying 30 min
Trimmed and trimming of semi-finished products 20 min
Cutting 20 min
Grinding 10 min
Drilling 15 min
Milling operation 18 min
Gluing 20 min
Surface treatment 10 min
Packaging 5 min

Source: authors.

Stages of production in the enterprise: pre-making phase – processing of round log and drying; making phase – trimmed and trimming of semi-finished products, cutting, drilling, milling, and gluing; finishing phase – surface treatment, packaging, and delivery.

During the analysis, some shortcomings were identified. Shortcomings were defined as – dryer because this production step is very busy with small reserve, production step gluing, surface treatment, packaging – these production steps do not work efficiently, this means that these production steps have very large downtimes.

3 Simulation model

The program Tecnomatix Plant Simulation is designed for solving problems and subsequent optimization of these problems. It is an effective tool for dynamic simulation and allows the creation of digital models of production and logistic systems and also to examine characteristics of systems and optimize their effectiveness. Using this program in the process of planning, it is possible to obtain probable results before installing the real production systems. A simulation model of the production process was created in the program Tecnomatix Plant Simulation. This program is a tool for creating discrete simulations. With the help of this program, it is possible to create virtual digital logistics or also the production process from individual parts. The program allows by its analytical tools, such as analysis of obstacles, statistics, and graphs, to very quickly simulate and evaluate the system without intervention to the real process. This allows trying more variants of the problem solution. The simulation model was created to represent a single shift operation (from 6 am to 2 pm, 8 h). Within the model, one fork-lift truck was modeled, which was set according to the actual time of work in the enterprise (every hour and a half it brings a round log for processing). Additional data that were entered into the simulation are presented in Table 1. Figure 3 presents the whole production process of the enterprise simulated in the program Tecnomatix Plant Simulation

Figure 3 
               Production process of the enterprise presented in the program Tecnomatix Plant Simulation. Source: authors.
Figure 3

Production process of the enterprise presented in the program Tecnomatix Plant Simulation. Source: authors.

3.1 Procedure of model creation

The next part of the study presents the process of simulation model creation in the selected program.

Production hall 1 – At the beginning of the simulation, it was needed to draw a line for the fork-lift truck. The next step was the insertion of the block “Source.” It was also necessary to create components that were inserted into the model, i.e., round log, box, etc. The procedure of model creation was as follows. The first part was to set “container or transporter” in the folder “Mus” and they could be duplicated. In the folder “User objects” was displayed the duplicated item, which was named and set. Figure 4 presents the production hall 1 in the simulation program.

Figure 4 
                  Production hall 1 in the simulation program. Source: authors.
Figure 4

Production hall 1 in the simulation program. Source: authors.

The next block Source was set so that only one high-lift truck came to the track (high-lift truck was “add” to the column MU) (Figure 5).

Figure 5 
                  Set up “Source.” Source: authors.
Figure 5

Set up “Source.” Source: authors.

In the next step, an input was created. The “Source” was inserted from the work bar in the part Material Flow. To the block Source, it was necessary to add the block Buffer, between which was created a connection. This block was named a round log warehouse.

4 Simulation experiments

The simulation experiment confirms or refutes the assumptions about the behavior of the production process. Thanks to the continuous results of experiments, it is possible to constantly modify the simulation model so that the best possible solution variants are achieved. Each experiment is done under predefined conditions. After processing the simulation process in the program, shortcomings in the production process were identified. These shortcomings were the production step of the dryer and also the production processes of gluing, surface treatment, and packaging.

The last part of the study will focus on a proposal for improving the production process in the production enterprise by eliminating these bottlenecks and also minimizing employee downtime. The proposed solutions which will present the improvements of the production process for these bottlenecks must be better defined, which result from the simulation. With the help of simulation, it was determined that the stage of production “drying” is sufficient in the case if the enterprise will want to stay at its current capacity and will not increase its production.

If the enterprise receives more orders, the production step “drying” becomes a bottleneck. Figure 6 presents the utilization of production steps in the enterprise. The least used steps in the production enterprise are gluing, surface treatment, and packaging. Another important finding by the simulation is the fact that some stages in the production process are blocked. The most blocked step is “grinding.”

Figure 6 
               Utilization of devices (device 1 – processing, 2 – dryer, 3 – planning, 4 – cutting, 5 – grinding, 6 – drilling, 7 – milling operation, 8 – gluing, 9 – surface treatment, and 10 – packaging). Source: authors.
Figure 6

Utilization of devices (device 1 – processing, 2 – dryer, 3 – planning, 4 – cutting, 5 – grinding, 6 – drilling, 7 – milling operation, 8 – gluing, 9 – surface treatment, and 10 – packaging). Source: authors.

4.1 Proposal No. 1: production process “dryer”

The enterprise wants to expand its capacity shortly and for this reason, this production stage in the production enterprise is identified as a bottleneck. This is because it is used sufficiently with minimal reserve. This means that if the production enterprise receives more orders, this production step will lag. The solution is to build another dryer. This solution was integrated into the simulation. Figure 7 presents the changes that occurred in the simulation. Figure 8 presents the utilization of the stage “dryer” if the enterprise will have two dryers. This figure also shows that no production step in the process is not blocked (in comparison with the initial simulation, with the blocked step).

Figure 7 
                  Addition of the second dryer to the production process. Source: authors.
Figure 7

Addition of the second dryer to the production process. Source: authors.

Figure 8 
                  Utilization of devices in the stage “dryer” (1 – processing, 2 – dryer, 3 – planning, 4 – cutting, 5 – grinding, 6 – drilling, 7 – milling operation, 8 – gluing, 9 – surface treatment, and 10 – package). Source: authors.
Figure 8

Utilization of devices in the stage “dryer” (1 – processing, 2 – dryer, 3 – planning, 4 – cutting, 5 – grinding, 6 – drilling, 7 – milling operation, 8 – gluing, 9 – surface treatment, and 10 – package). Source: authors.

4.2 Proposal No. 2: production steps “gluing, surface treatment, and packaging”

The production steps “gluing, surface treatment, and packaging” are not sufficiently utilized. The solution for these non-effective workplaces can be their connection to the one with one employer. Figure 9 presents the application of the changes in the simulation model.

Figure 9 
                  Application of the change in the simulation model. Source: authors.
Figure 9

Application of the change in the simulation model. Source: authors.

This change in the simulation model achieved that the production in the process are more work out. Staff costs have been reduced because of the previous three employees, the enterprise needs only one who ensures the operation of all three workplaces. Table 2 presents the financial costs for the staff from the initial simulation and after the improvement proposal (Figure 10).

Table 2

Financial costs related to staff

Production step in the process Staff Costs
Financial costs related to the production process (the initial simulation)
 Time for round log processing 1 850
 Drying x 1,000
 Planning 1 830
 Cutting 1 850
 Grinding 1 860
 Drilling 1 850
 Milling operation 1 850
 Gluing 1 850
 Surface treatment 1 900
 Packaging 1 850
 Sum 9 8,690
Financial costs related to the production process (proposal of improvement)
 Time for round log processing 1 850
 Drying x 1,000
 Planning 1 830
 Cutting 1 850
 Grinding 1 860
 Drilling 1 850
 Milling operation 1 850
 Gluing, surface treatment, and packaging 1 950
 Sum 7 7,040

Source: authors.

The symbol x presents that for this part of production process was not use a staff.

Figure 10 
                  Utilization of devices after connection of three steps in the production enterprise (1 – processing, 2 – dryer, 3 – planning, 4 – cutting, 5 – grinding, 6 – drilling, 7 – milling operation, 8 – gluing and surface treatment, 9 – packaging). Source: authors.
Figure 10

Utilization of devices after connection of three steps in the production enterprise (1 – processing, 2 – dryer, 3 – planning, 4 – cutting, 5 – grinding, 6 – drilling, 7 – milling operation, 8 – gluing and surface treatment, 9 – packaging). Source: authors.

From Table 2 it can be seen that the staff costs have been reduced by this proposal by 1,650 € per month. Yearly, the enterprise saves by this solution 19,800 €.

5 Conclusion

The case study aimed to point out the possibilities of using computer simulation and the simulation program Tecnomatix Plant Simulation to solve problems in a selected production enterprise. A simulation was created in this program, and this reflects the current state of the evaluated production enterprise. The simulation experiment consisted of two parts. The first part was focused on the description of the current state and the second part was aimed at improving the current situation in the enterprise. Two variants of improvement and simulation were created. The results from these simulations were analyzed, and one proposal of improvement calculated the costs associated with the solution design and in the other case, the table with the financial savings after application of the proposal.

The program Tecnomatix Plant Simulation is one of the most widely used software for modeling, simulation, and optimization of production and logistics processes of today’s companies and enterprises. This program is mostly used by companies that deal with the automotive industry, but over time it also reaches smaller companies that deal with the industry. It is also being used in companies with smaller serial production. This program can be used in every company where it is necessary to reduce production costs, improve material flow in the production process, or increase labor productivity. In addition to the function that it is possible to optimize the existing production process without disrupting the operation of the company, this program is also suitable for designing new products. For the design of new products, the possibility of 3D visualization is built into this program. This allows the user a virtual tour of the new production. This option helps to fulfill the contractor’s ideas.

After processing the simulation and subsequent analysis, it was found that the production process has two shortcomings. The first determination was the stage dryer. This operation is assessed as a bottleneck because if the enterprise wants to receive more orders shortly, then this operation would not be sufficient. Therefore, the proposed improvement was oriented to building up a second dryer. The costs that the enterprise would incur are 30,000 €. Other shortcomings in the enterprise were the operation of gluing, surface treatment, and packaging. These operations are inefficient because they are insufficiently working out.

The proposal was processed in such a way that these operations were merged and were handled by only one employee. As a result, the enterprise would save the salaries of two employees, which amounted to 1,650 € per month. The optimization of production and also logistic processes can be defined as a very important element (factor) to the success of the enterprise. The simulation that was created gives very important and accurate information that leads to planning and decision-making in the near and also in the distant future. By optimization, the enterprise can reduce costs and also increase labor productivity.

If a company intends to increase production, using the Tecnomatix Plant Simulation program, it can avoid unnecessary purchases, such as a production line or the construction of an area that is not needed at all. The simulation avoids unnecessary purchases. Nowadays, more and more companies are starting to look at the possibilities offered by the digital business. There are more and more companies in the market that deal with digital business. These companies offer their services such as optimization of production processes, logistic processes, and also proposals for improving these processes. In addition to these services, companies have different types of software where customers can choose according to the needs and focus of the business. It can be said that digitization will continue to move forward.

Acknowledgments

This work was supported by the projects of the Scientific Grant Agency of the Ministry of Education, Science, Research and Sport of the Slovak Republic and the Slovak Academy of Sciences Project No. VEGA 1/0638/19, and was supported by the projects of the Cultural and Educational Grant Agency of the Ministry of Education, Science, Research and Sport of the Slovak Republic and the Slovak Academy of Sciences project No. KEGA 049TUKE-4/2020.

  1. Conflict of interest: Authors state no conflict of interest.

References

[1] Košturiak J, Gregor M. Simulation in production system life cycle. J Comp Ind. 1999;38(2):159–72.10.1016/S0166-3615(98)00116-XSearch in Google Scholar

[2] Nakano M, Noritake S, Ohashi T. Lifecycle simulation framework for production systems. In: Lean business systems and beyond. The International Federation for Information Processing (IFIP). Boston, MA: Springer; 2008. p. 327–35.10.1007/978-0-387-77249-3_34Search in Google Scholar

[3] Bergmann S, Straßburger S. Challenges for the automatic generation of simulation models for production systems. In: International Simulation Multiconference/Summer Computer Simulation Conference; 2010. p. 545–9.Search in Google Scholar

[4] Wenzel S, Boyaci P, Jessen U. Simulation in production and logistics: trends, solutions and applications. In: International Heinz Nixdorf Symposioum; 2010. p. 73–84.10.1007/978-3-642-12494-5_7Search in Google Scholar

[5] Solding P, Petku D, Mardan N. Using simulation for more sustainable production systems – methodologies and case studies. Int J Sustain Eng. 2009;2(2):111–22.10.1080/19397030902960994Search in Google Scholar

[6] Mourtizis D, Doukas M, Bernidaki D. Simulation in manufacturing: review and challenges. Proceedia CIRP; 2014. p. 213–29.10.1016/j.procir.2014.10.032Search in Google Scholar

[7] Michaloski JL, Shao G, Arinez J, Lyons K, Leong S, Riddick F. Analysis of sustainable manufacturing using simulation for integration of production and building service. Soc Computer Simul Int. 2011;4:125–31.Search in Google Scholar

[8] Kuhn W. Digital factory - simulation enhancing the product and production engineering process. In: Proceedings of the 2006 Conference on Winter Simulation; 2006. p. 1899–906.10.1109/WSC.2006.322972Search in Google Scholar

[9] Stahl B, Taisch M, Cannata A, Müller F, Thiede S, Herrmann C, et al. Combined energy material and building simulation for green factory planning. In: Re-engineering manufacturing for sustainability. Singapore: Springer; 2013. p. 493–8.10.1007/978-981-4451-48-2_80Search in Google Scholar

[10] Kádár B, Pfeiffer A, Monostori L. Discrete event simulation for supporting production planning and scheduling decisions in digital factories. In: Proceedings of the 37th CIRP international Seminar on Manufacturing Systems; 2004. p. 444–8.Search in Google Scholar

[11] Mula J, Poler R, Garcia-Sabater JP, Lario FC. Models for production planning under uncertainty: a review. Int J Prod Econ. 2006;103:271–85.10.1016/j.ijpe.2005.09.001Search in Google Scholar

[12] Mircetic D, Ralevic N, Nikolicic S, Maslaric M, Stojanovic D. Expert system models for forecasting forklifts engagement in a warehouse loading operation: a case study. Promet-Traffic Transp. 2016;28:393–401.10.7307/ptt.v28i4.1900Search in Google Scholar

[13] Maslaric M, Groznik A, Brnjac N. Distribution channel reengineering: a case study. Promet-Traffic Transp. 2012;24:35–43.10.7307/ptt.v24i1.266Search in Google Scholar

[14] Fabianova J, Kacmary P, Janekova J. Operative production planning utilising quantitative forecasting and Monte Carlo simulations. Open Eng. 2019;9:613–22.10.1515/eng-2019-0071Search in Google Scholar

[15] Janekova J, Fabianova J, Izarikova G, Onofrejova D, Kovac J. Product mix optimization based on Monte Carlo simulation: a case study. Int J Simul Model. 2018;17:295–307.10.2507/IJSIMM17(2)436Search in Google Scholar

[16] Rabe M, Spieckermann S, Wenzel S. A new procedure model for verification and validation in production and logistics simulation. In: 2008 Winter Simulation Conference; 2008. p. 1717–26.10.1109/WSC.2008.4736258Search in Google Scholar

Received: 2021-08-13
Revised: 2021-09-24
Accepted: 2021-09-27
Published Online: 2021-10-29

© 2021 Nikoleta Mikušová et al., published by De Gruyter

This work is licensed under the Creative Commons Attribution 4.0 International License.

Articles in the same Issue

  1. Regular Articles
  2. Electrochemical studies of the synergistic combination effect of thymus mastichina and illicium verum essential oil extracts on the corrosion inhibition of low carbon steel in dilute acid solution
  3. Adoption of Business Intelligence to Support Cost Accounting Based Financial Systems — Case Study of XYZ Company
  4. Techno-Economic Feasibility Analysis of a Hybrid Renewable Energy Supply Options for University Buildings in Saudi Arabia
  5. Optimized design of a semimetal gasket operating in flange-bolted joints
  6. Behavior of non-reinforced and reinforced green mortar with fibers
  7. Field measurement of contact forces on rollers for a large diameter pipe conveyor
  8. Development of Smartphone-Controlled Hand and Arm Exoskeleton for Persons with Disability
  9. Investigation of saturation flow rate using video camera at signalized intersections in Jordan
  10. The features of Ni2MnIn polycrystalline Heusler alloy thin films formation by pulsed laser deposition
  11. Selection of a workpiece clamping system for computer-aided subtractive manufacturing of geometrically complex medical models
  12. Development of Solar-Powered Water Pump with 3D Printed Impeller
  13. Identifying Innovative Reliable Criteria Governing the Selection of Infrastructures Construction Project Delivery Systems
  14. Kinetics of Carbothermal Reduction Process of Different Size Phosphate Rocks
  15. Plastic forming processes of transverse non-homogeneous composite metallic sheets
  16. Accelerated aging of WPCs Based on Polypropylene and Birch plywood Sanding Dust
  17. Effect of water flow and depth on fatigue crack growth rate of underwater wet welded low carbon steel SS400
  18. Non-invasive attempts to extinguish flames with the use of high-power acoustic extinguisher
  19. Filament wound composite fatigue mechanisms investigated with full field DIC strain monitoring
  20. Structural Timber In Compartment Fires – The Timber Charring and Heat Storage Model
  21. Technical and economic aspects of starting a selected power unit at low ambient temperatures
  22. Car braking effectiveness after adaptation for drivers with motor dysfunctions
  23. Adaptation to driver-assistance systems depending on experience
  24. A SIMULINK implementation of a vector shift relay with distributed synchronous generator for engineering classes
  25. Evaluation of measurement uncertainty in a static tensile test
  26. Errors in documenting the subsoil and their impact on the investment implementation: Case study
  27. Comparison between two calculation methods for designing a stand-alone PV system according to Mosul city basemap
  28. Reduction of transport-related air pollution. A case study based on the impact of the COVID-19 pandemic on the level of NOx emissions in the city of Krakow
  29. Driver intervention performance assessment as a key aspect of L3–L4 automated vehicles deployment
  30. A new method for solving quadratic fractional programming problem in neutrosophic environment
  31. Effect of fish scales on fabrication of polyester composite material reinforcements
  32. Impact of the operation of LNG trucks on the environment
  33. The effectiveness of the AEB system in the context of the safety of vulnerable road users
  34. Errors in controlling cars cause tragic accidents involving motorcyclists
  35. Deformation of designed steel plates: An optimisation of the side hull structure using the finite element approach
  36. Thermal-strength analysis of a cross-flow heat exchanger and its design improvement
  37. Effect of thermal collector configuration on the photovoltaic heat transfer performance with 3D CFD modeling
  38. Experimental identification of the subjective reception of external stimuli during wheelchair driving
  39. Failure analysis of motorcycle shock breakers
  40. Experimental analysis of nonlinear characteristics of absorbers with wire rope isolators
  41. Experimental tests of the antiresonance vibratory mill of a sectional movement trajectory
  42. Experimental and theoretical investigation of CVT rubber belt vibrations
  43. Is the cubic parabola really the best railway transition curve?
  44. Transport properties of the new vibratory conveyor at operations in the resonance zone
  45. Assessment of resistance to permanent deformations of asphalt mixes of low air void content
  46. COVID-19 lockdown impact on CERN seismic station ambient noise levels
  47. Review Articles
  48. FMEA method in operational reliability of forest harvesters
  49. Examination of preferences in the field of mobility of the city of Pila in terms of services provided by the Municipal Transport Company in Pila
  50. Enhancement stability and color fastness of natural dye: A review
  51. Special Issue: ICE-SEAM 2019 - Part II
  52. Lane Departure Warning Estimation Using Yaw Acceleration
  53. Analysis of EMG Signals during Stance and Swing Phases for Controlling Magnetorheological Brake applications
  54. Sensor Number Optimization Using Neural Network for Ankle Foot Orthosis Equipped with Magnetorheological Brake
  55. Special Issue: Recent Advances in Civil Engineering - Part II
  56. Comparison of STM’s reliability system on the example of selected element
  57. Technical analysis of the renovation works of the wooden palace floors
  58. Special Issue: TRANSPORT 2020
  59. Simulation assessment of the half-power bandwidth method in testing shock absorbers
  60. Predictive analysis of the impact of the time of day on road accidents in Poland
  61. User’s determination of a proper method for quantifying fuel consumption of a passenger car with compression ignition engine in specific operation conditions
  62. Analysis and assessment of defectiveness of regulations for the yellow signal at the intersection
  63. Streamlining possibility of transport-supply logistics when using chosen Operations Research techniques
  64. Permissible distance – safety system of vehicles in use
  65. Study of the population in terms of knowledge about the distance between vehicles in motion
  66. UAVs in rail damage image diagnostics supported by deep-learning networks
  67. Exhaust emissions of buses LNG and Diesel in RDE tests
  68. Measurements of urban traffic parameters before and after road reconstruction
  69. The use of deep recurrent neural networks to predict performance of photovoltaic system for charging electric vehicles
  70. Analysis of dangers in the operation of city buses at the intersections
  71. Psychological factors of the transfer of control in an automated vehicle
  72. Testing and evaluation of cold-start emissions from a gasoline engine in RDE test at two different ambient temperatures
  73. Age and experience in driving a vehicle and psychomotor skills in the context of automation
  74. Consumption of gasoline in vehicles equipped with an LPG retrofit system in real driving conditions
  75. Laboratory studies of the influence of the working position of the passenger vehicle air suspension on the vibration comfort of children transported in the child restraint system
  76. Route optimization for city cleaning vehicle
  77. Efficiency of electric vehicle interior heating systems at low ambient temperatures
  78. Model-based imputation of sound level data at thoroughfare using computational intelligence
  79. Research on the combustion process in the Fiat 1.3 Multijet engine fueled with rapeseed methyl esters
  80. Overview of the method and state of hydrogenization of road transport in the world and the resulting development prospects in Poland
  81. Tribological characteristics of polymer materials used for slide bearings
  82. Car reliability analysis based on periodic technical tests
  83. Special Issue: Terotechnology 2019 - Part II
  84. DOE Application for Analysis of Tribological Properties of the Al2O3/IF-WS2 Surface Layers
  85. The effect of the impurities spaces on the quality of structural steel working at variable loads
  86. Prediction of the parameters and the hot open die elongation forging process on an 80 MN hydraulic press
  87. Special Issue: AEVEC 2020
  88. Vocational Student's Attitude and Response Towards Experiential Learning in Mechanical Engineering
  89. Virtual Laboratory to Support a Practical Learning of Micro Power Generation in Indonesian Vocational High Schools
  90. The impacts of mediating the work environment on the mode choice in work trips
  91. Utilization of K-nearest neighbor algorithm for classification of white blood cells in AML M4, M5, and M7
  92. Car braking effectiveness after adaptation for drivers with motor dysfunctions
  93. Case study: Vocational student’s knowledge and awareness level toward renewable energy in Indonesia
  94. Contribution of collaborative skill toward construction drawing skill for developing vocational course
  95. Special Issue: Annual Engineering and Vocational Education Conference - Part II
  96. Vocational teachers’ perspective toward Technological Pedagogical Vocational Knowledge
  97. Special Issue: ICIMECE 2020 - Part I
  98. Profile of system and product certification as quality infrastructure in Indonesia
  99. Prediction Model of Magnetorheological (MR) Fluid Damper Hysteresis Loop using Extreme Learning Machine Algorithm
  100. A review on the fused deposition modeling (FDM) 3D printing: Filament processing, materials, and printing parameters
  101. Facile rheological route method for LiFePO4/C cathode material production
  102. Mosque design strategy for energy and water saving
  103. Epoxy resins thermosetting for mechanical engineering
  104. Estimating the potential of wind energy resources using Weibull parameters: A case study of the coastline region of Dar es Salaam, Tanzania
  105. Special Issue: CIRMARE 2020
  106. New trends in visual inspection of buildings and structures: Study for the use of drones
  107. Special Issue: ISERT 2021
  108. Alleviate the contending issues in network operating system courses: Psychomotor and troubleshooting skill development with Raspberry Pi
  109. Special Issue: Actual Trends in Logistics and Industrial Engineering - Part II
  110. The Physical Internet: A means towards achieving global logistics sustainability
  111. Special Issue: Modern Scientific Problems in Civil Engineering - Part I
  112. Construction work cost and duration analysis with the use of agent-based modelling and simulation
  113. Corrosion rate measurement for steel sheets of a fuel tank shell being in service
  114. The influence of external environment on workers on scaffolding illustrated by UTCI
  115. Allocation of risk factors for geodetic tasks in construction schedules
  116. Pedestrian fatality risk as a function of tram impact speed
  117. Technological and organizational problems in the construction of the radiation shielding concrete and suggestions to solve: A case study
  118. Finite element analysis of train speed effect on dynamic response of steel bridge
  119. New approach to analysis of railway track dynamics – Rail head vibrations
  120. Special Issue: Trends in Logistics and Production for the 21st Century - Part I
  121. Design of production lines and logistic flows in production
  122. The planning process of transport tasks for autonomous vans
  123. Modeling of the two shuttle box system within the internal logistics system using simulation software
  124. Implementation of the logistics train in the intralogistics system: A case study
  125. Assessment of investment in electric buses: A case study of a public transport company
  126. Assessment of a robot base production using CAM programming for the FANUC control system
  127. Proposal for the flow of material and adjustments to the storage system of an external service provider
  128. The use of numerical analysis of the injection process to select the material for the injection molding
  129. Economic aspect of combined transport
  130. Solution of a production process with the application of simulation: A case study
  131. Speedometer reliability in regard to road traffic sustainability
  132. Design and construction of a scanning stand for the PU mini-acoustic sensor
  133. Utilization of intelligent vehicle units for train set dispatching
  134. Special Issue: ICRTEEC - 2021 - Part I
  135. LVRT enhancement of DFIG-driven wind system using feed-forward neuro-sliding mode control
  136. Special Issue: Automation in Finland 2021 - Part I
  137. Prediction of future paths of mobile objects using path library
  138. Model predictive control for a multiple injection combustion model
  139. Model-based on-board post-injection control development for marine diesel engine
  140. Intelligent temporal analysis of coronavirus statistical data
Downloaded on 6.1.2026 from https://www.degruyterbrill.com/document/doi/10.1515/eng-2021-0102/html
Scroll to top button