Home Proposal for the flow of material and adjustments to the storage system of an external service provider
Article Open Access

Proposal for the flow of material and adjustments to the storage system of an external service provider

  • Jan Strohmandl EMAIL logo , Blanka Kalupová , Kateřina Rejzková and Miroslav Tomek
Published/Copyright: October 6, 2021
Become an author with De Gruyter Brill

Abstract

This article deals with issues related to the flow of material to the assembly line and examines the possibilities of reducing the costs of this process. It is based on the current state of the transport of individual parts to the producing company and the storage system using Kanban and Just in Sequence (JIS) logistics technologies, and the subsequent collection of material for transport to the assembly line. The change in the system of transport technology has led to a reduction of the total storage space and costs, and at the same time, the processes related to storage and collection of parts have been simplified. The whole process of material flow to the assembly line is solved using the real supply system via the JIS technology, together with the system of receipt and storage of components in connection with individual operations during the handling and storage of these components, and their picking and transport to the assembly line. Evidently, the change in the system and the associated savings can also be employed to warehouses and manufacturing companies of the automotive industry, which use automated assembly lines with the timing of the assembly process of the final product.

1 Introduction

Nowadays, it is no longer valid that the price of products is given by the seller of the goods, but it is rather determined by the competitive struggle that takes place among individual producers and sellers. Should a company be able to compete, it must try to minimize the total logistics costs, not just part of them, or the costs of the specific activity, because reducing the costs of one activity can lead to increased costs of another [1].

Logistics costs can be divided into six areas, which are interconnected and include the main logistics activities. Not all logistics activities of the company fall within the competence and responsibility of the logistics department, but still, they significantly affect the overall logistics process, including the costs [2].

Six areas of costs of logistics are as follows:

  • level of customer service,

  • transport costs,

  • costs of stock-keeping,

  • storage costs,

  • quantity costs,

  • information system costs [2].

The reduction of costs of logistics must be done by improving processes in individual segments of the supply chain [3]; this includes, in particular, the use of logistics technologies [4,5] associated with transport [6,7,8], choice of material and handling, including modeling [9,10], and simulation of individual activities [11,12].

Transport of individual components for assembly is a process during which the optimization of individual steps was investigated in order to save costs, especially those of picking from the warehouse and supplying the material to the assembly line in order to avoid disruption of the continuity of production. In addition, cost savings are looked for in the field of human resources, or storage and production, which is reflected in the overall cost of the finished product.

The material flow from the supplier to the assembly line can be divided into two parts. The first part deals with methods of delivery of material from suppliers to the warehouse of manufacturing company, while the second deals with methods of delivery from the warehouse to an area near the assembly line. The business logistics can be divided into the following three areas: Inbound, In-house, and Outbound. The Inbound system deals with supply logistics, i.e., all activities that need to be performed within the framework of logistics in order to provide the necessary material for production. The In-house system is focused on all flows and activities that take place in the manufacturing company. It, therefore, includes activities such as the receipt of material into the warehouse, methods of storage and handling of material, methods of picking and delivery of material to the assembly line, and further steps of the in-house logistics. The Outbound system deals with all activities related to the dispatch of finished products to the customers (Figure 1).

Figure 1 
               Inbound in-house outbound. Own source.
Figure 1

Inbound in-house outbound. Own source.

1.1 Direct transport

Direct transport means that the supply is carried out by means of one vehicle from the supplier to the customer. It is used for supplies of parts or material, which can fully load the vehicle in the range of 80–100%. The direct transport is shown in Figure 2.

Figure 2 
                  Direct transport diagram. Own source.
Figure 2

Direct transport diagram. Own source.

Direct transport should not be used for parts that are not in regular use or parts small in size, which means that many pieces can be loaded for transport, or for other reasons that prevent the vehicle to be fully loaded.

1.2 Transport to the collecting point

Transport to the collecting point works on the principle of supply of several types of materials from several suppliers. Usually, the individual supplies are carried out by a selected transport company. The costs for the transport of the material are determined according to the capacity taken up on the vehicle, i.e., for a m3. The schematic representation of the transport to the collecting point is shown in Figure 3.

Figure 3 
                  Transport to the collecting point. Own source.
Figure 3

Transport to the collecting point. Own source.

2 Methods

For collection and supplies of parts to the manufacturing company, which serve for production and assembly, the technologies Just in Sequence (JIS) and external Kanban are used to solve the related issues.

2.1 Just in sequence technology

The supply of material is carried out in a precisely predetermined order, i.e., in sequence. Material is delivered on special JIS pallets lined up according to the order of its usage.

The supplier is responsible for the entire logistics process, i.e., from the time the material exits the ramp of the supplier’s manufacturing plant to the place where it is to be removed from the pallet and used by the customer.

However, the supply of material within the JIS technology is not always the same. There are three types of JIS supplies, which differ from each other in certain steps. They are as follows:

  • JIS A,

  • JIS B,

  • JIS C.

2.1.1 JIS A

The supplier of material produces the components in their manufacturing plant. This production is done based on the call-off orders received from the customer. The material produced is then placed on a JIS pallet according to the specified order known to the supplier in advance. JIS pallets with the chosen material are transported, according to the set time, to the customer at the place of usage, to the so-called JIS zone, where the material is unloaded from the vehicle. From this zone, the material is then moved to the assigned logistics zone inside the production hall, from where the pallets with the chosen material are supplied to the place of usage. As can be seen in Figure 4, the boundary between A-price and b-price is on the ramp of the material supplier; it means that the costs caused by the high complexity of the supplied materials fall within the A-price [13,14].

Figure 4 
                     JIS A diagram. Internal source: LK 001-18-01 LAH SK270.
Figure 4

JIS A diagram. Internal source: LK 001-18-01 LAH SK270.

2.1.2 JIS B

The supplier produces material in its production plant based on long-term call-off orders, which are later specified by detailed call-off orders. The supplier of material uses transport pallets to move the material as required from their plant to an external service provider, which provides the supplier with storage and sequential collection of the material. The transport of parts between the production plant and the external service provider falls within the full competence of the supplier. The necessary stock is kept in order to provide a continuous supply to the customer [13,14].

The supplier uses detailed call-off orders to manage the stock. Based on the sequence call-off order, the external logistics service provider transfers the parts from the transport pallets to the JIS pallets in the correct order according to the specified sequence. Furthermore, the external logistics service provider transports the parts from their premises to the designated place of unloading inside the plant, unloads the truck, and transfers the parts into the assigned logistics zone. In addition, they provide for the handling of parts or the JIS pallets from the logistics zone to the place of their usage. As can be seen in Figure 5, JIS B differs from JIS A by another added element, which is an external logistics service provider. As a result, the partial costs of stock-keeping are borne by the logistics service provider [13,14].

Figure 5 
                     JIS B diagram. Source: ref. [14].
Figure 5

JIS B diagram. Source: ref. [14].

2.1.3 JIS C

The final assembly of the material and parts that are supplied to the customer by means of the JIS C system is performed by the supplier, while all services provision for the supplier are done by the external logistics service provider.

As can be seen in Figure 6, the purchasing department is responsible for the transport of components, provision of pallets, and security of the process. All of this is included in the A-price [13,14].

Figure 6 
                     JIS C diagram. Source: ref. [14].
Figure 6

JIS C diagram. Source: ref. [14].

2.2 A-price and b-price boundary

A-price is the price that falls within the purchasing department of the customer. The process that is carried out at the material supplier, all costs associated with activities performed before the material is loaded on the vehicle and in some cases the transport to an external service provider are included in the A-price, depending on the chosen type of the JIS supply.

The price that is calculated and paid by the customer’s logistics department is called the b-price. As apparent from Figures 46, the b-price is calculated from the point at which the A-price, for which the purchasing department is responsible, ends.

Therefore, the boundary of A-price and b-price differs depending on the type of the JIS supply. For instance, the costs related to the high complexity of parts and materials are borne by the purchasing department in the JIS A system and by the logistics department in the JIS B system [13,14].

2.3 External Kanban

One of the options for supplying material to the company is by means an external Kanban. In the case of the supply of material by the external Kanban, the stock of material in warehouses is kept for about 1.5 days. This method of supplying material to the manufacturing plant has its advantages and disadvantages. There are also conditions that must be met so that this method of supply can be applied. If the external Kanban is used for supplies of specific material from the given supplier, only small stocks are kept, and therefore, the supplies of material to the company must be more frequent than with standard delivery methods. The material must be supplied at least once a day, while the vehicle must be loaded at least at 80%.

The use of external Kanban reduces the need for packaging. As the supplies of material are carried out more often than standard supplies, the need for the number of packages for the given material in circulation also decreases.

2.4 Flow of material from warehouses to the assembly line

Stored material can be transported from the warehouse to the assembly line as follows:

  • directly from the warehouse to the assembly line,

  • through the station,

  • through the AGV station,

  • through the sequential workplace.

Pick-by-systems are used for the correct picking of material in sequential workplaces. These are supported assistance systems that significantly reduce or almost eliminate the risk of confusion when picking the material.

3 Results

The results achieved after the implementation of the external Kanban are as follows:

3.1 Material warehouse

The stored material is listed in Table 1, including information on the average occupancy of standard storage positions and the percentage utilization of the warehouse, which is equal to 100%, which means that the average number of occupied 1,155 storage positions is considered as 100% in the table.

Table 1

Multiple criteria analysis of the selection of suitable material for optimization

Material Supplier’s country Daily volumes (number of packages) Utilization (%) Suitable for optimization
Part A Hungary 25 32 No
Part B Poland 42 54 No
Part C Czech Republic 54 69 No
Part D Czech Republic 68 87 Yes
Part E Poland 31 40 No
Part F Poland 31 40 No

3.2 Implementation of the external Kanban

Table 1 contains individual criteria that must be met in order for an external Kanban to be used for the given supplier and material. The daily volume must be sufficient, and at least 80% of the capacity of a standard truck must be utilized. Another condition for using the external Kanban is the place of origin of the supplier – the Czech Republic; in certain cases, the supplier may be from Slovak Republic. This condition is met by Part D.

3.3 Evaluation of the external Kanban implementation

The first optimization, which leads to a reduction in stocks, is the implementation of an external Kanban. Based on the average utilization of individual warehouses for the reference period, part D was chosen for the purposes of optimization. Upon the analysis of the stored material, a back spoiler was chosen, which occupies many storage positions in the warehouse and has a large share in the capacity utilization of the warehouse. At the same time, it is the only material in the F3 warehouse that meets both basic conditions for the implementation of the external Kanban, i.e., dispatching is carried out in the Czech Republic and the standard vehicle used is utilized at least at 80% during the daily supplies of the material.

The implementation of the external Kanban for material D leads to:

  • reduction of the warehouse capacity utilization,

  • financial savings when storing material in internal areas.

Prior to the optimization, this material occupied an average of 244 standard storage positions. This number corresponded to stock for 3.5 days, which is more than the average stock of all materials delivered from the Czech Republic.

After the implementation of the external Kanban, it is necessary to keep stocks in the customer’s warehouse for 1.5 days; this means that the stock of material D will occupy only 102 standard storage positions on average. These calculations are based on the information, which states that due to the average usage and the number of pieces of material D in a package, it is necessary to keep on stock 68 packages per day.

After the implementation of the optimization proposal, the average capacity utilization of the warehouse decreased from the original 97 to 85%, and thus the optimal utilization of this warehouse was achieved.

3.4 Storage of material in internal areas – financial savings

If the warehouse is occupied above the set optimum, some solution must be found in order for the stocks to be reduced. In this case, the solution was to implement the external Kanban for the most suitable part located in this warehouse. Provided that no material meets the conditions for the implementation of the external Kanban method, or the stocks cannot be reduced in another way, an alternative solution would have to be found to improve the situation in the warehouse and to enable its standard operation.

Another possible solution to keep the capacity utilization of the warehouse at an optimal level is to lease storage space from an external service provider and move most of the stocks there. The external service provider must be located in close proximity to the customer’s production plant. Instead of the delivery to the customer’s production plant, the material is supplied to the external service provider, where the majority of the ordered material, i.e., most of the stock, is kept. The external service provider, abbreviated EDL from German “Externe Dienstleister,” gradually supplies a small amount of material to their customer as required. Therefore, the customer keeps in the warehouses only a part of the stocks of specific material, for example, just for half a day. In the event of unexpected problems, the rest of the material is only a few kilometers away and the situation can therefore be solved reasonably quickly. The customer must pay the agreed amount to the provider for the lease of the storage space.

Simply speaking, the implementation of the external Kanban for material D reduced the need to store this or other material with the external service provider, and thus the costs associated with leasing space and services, especially for handling the material, never incurred.

Because of this optimization measure, the average stock in the warehouse was reduced. Originally, material D occupied 244 standard storage positions; after optimization, it occupied only 102 positions and the capacity utilization was reduced from 97% to the optimal 85%. It can therefore be said that the transfer of material occupying 142 storage positions in the warehouse was prevented.

For 142 standard storage positions, 128 m2 would be needed in the warehouse at the external supplier’s. This value is obtained using Formula 1 to calculate the storage needed, in which the length of the package and the width of the package and the “aisle coefficient” are multiplied and consequently divided by the stackability of the given package. In this example, the length of the package is 1.2 m, the width is 1.0 m, and the aisle coefficient is 3, which means that the aisle distance between individual shelves or rows will be 3 m; the aisle is used for passing through and movement of handling equipment. The stackability is 4. This value states how many packages can be stacked on top of each other.

Calculation of the storage space needed:

1.2 × 1.0 × 3 4 × 142 = 128 m 2 .

When storing material at the external service provider’s, the customer pays for the following services:

  • storage space,

  • material handling.

If the price of the lease of the storage space is CZK 2,141/m2/year, the price of the lease of 128 m2 is to be CZK 274,048 per year.

When storing material at the external supplier’s, the customer pays not only for the lease of the space but also for the services related to the storage. These include material receipt, storage, handling, dispensation, and transport to the customer. The price for these services is much higher than that for leasing the space and it is not possible to set a fixed rate per unit, as this is affected by the types of packages that are being handled. The resulting price is mainly affected by the dimensions of the packages and the number of pieces of material in them. In this case, the amount is CZK 719,325/year.

In order to get the final price for the storage on 128 m2 at the external service provider’s, it is necessary to add up the previously mentioned prices. The price obtained is then CZK 993,373/year.

The implementation of the optimization proposal by means of the external Kanban for material D reduced the capacity utilization of the external supplier’s warehouse from 97 to 85%, and thus it prevented the use of 142 standard storage positions for this material, corresponding to 128 m2 at the external provider’s, which led to reducing the total costs by CZK 993,373/year for storage and handling.

4 Conclusion

The process of optimizing the storage space, the use of logistics technologies, improvement of the transport system, material picking, and new trends and methods of implementation enable the company to reduce logistics costs, and therefore, improve business processes. Simultaneously, it becomes possible to accelerate the production, save human resources, and reduce demands on the use of handling equipment and means of transport, which results in a reduction of the environmental burden in accordance with the current trends in the Czech Republic and other countries worldwide.

Acknowledgments

This work is a part of the projects VI04000080 and RVO/FLKŘ/2020/03.

  1. Conflict of interest: Authors state no conflict of interest.

References

[1] Sixta J, Žižka M. Logistics: methods used to solve logistics projects. Praha: Computer Press; 2009. p. 238. ISBN 978-80-251-2563-2.Search in Google Scholar

[2] Sixta J, Mačát V. Logistics: theory and practice. CP Books; 2005. p. 315. ISBN 80-251-0573-3.Search in Google Scholar

[3] Hitka M, Lorincova S, Potkany M, Balazova Z, Caha Z. Differentiated approach to employee motivation in terms of finance. J Bus Econ Manag. 2021;22(1):118–34.10.3846/jbem.2020.13702Search in Google Scholar

[4] Sabadka D, Molnar V, Fedorko G, Jachowicz T. Optimization of production processes using the Yamazumi method. Adv Sci Technol Res J. 2017;11(4):75–182.10.12913/22998624/80921Search in Google Scholar

[5] Dockalikova I, Cempirek V, Indruchova I. Multimodal transport as a substitution for standard wagons. Logi 2019 – horizons of autonomous mobility in Europe. České Budějovice: Elsevier; 2020. p. 30–4.10.1016/j.trpro.2020.02.005Search in Google Scholar

[6] Mikusova N, Badiarova S, Jerabek K. Optimization of welding pliers production for the automotive industry-case study. Adv Sci Technol Res J. 2020;14(4):240–9.10.12913/22998624/128105Search in Google Scholar

[7] Fedorko G, Molnar V, Honus S, Neradilova H, Kampf R. The application of simulation model of a milk run to identify the occurrence of failures. Int J Simul Model. 2018;17(3):444–57.10.2507/IJSIMM17(3)440Search in Google Scholar

[8] Mikusova N, Stopka O, Stopkova M. Application of multi-criteria decision-making methods for the area of recycling. Technol Edu Manag Inform. 2019;8(3):827–35.Search in Google Scholar

[9] Kodym O, Sedlacek M, Kavka L. Information support for logistic modelling. 17th International Carpathian Control Conference; 2016. p. 335–40.10.1109/CarpathianCC.2016.7501119Search in Google Scholar

[10] Dockalikova I, Cempirek V, Indruchova I. Multimodal transport as a substitution for standard wagons. 20th Horizons of autonomous mobility in Europe. České Budějovice: Elsevier; 2019. p. 30–4.10.1016/j.trpro.2020.02.005Search in Google Scholar

[11] Kodym O, Kubac L, Kavka L. Risks associated with Logistics 4.0 and their minimization using Blockchain. Open Eng. 2020;10(1):74–85.10.1515/eng-2020-0017Search in Google Scholar

[12] Kodym O, Benes F, Svub J. EPC application framework in the context of Internet of Things. 16th International Carpathian Control Conference; 2015. p. 214–9.10.1109/CarpathianCC.2015.7145076Search in Google Scholar

[13] Kavka J. JIS supplies for model Yeti. Pardubice. Bachelor thesis. Pardubice: University of Pardubice, Faculty of Transport Engineering; 2017.Search in Google Scholar

[14] Vystavěl F. LK 001-18-01 LAH SK270. Internal sources. Mladá Boleslav: 2021.Search in Google Scholar

Received: 2021-08-06
Revised: 2021-09-01
Accepted: 2021-09-05
Published Online: 2021-10-06

© 2021 Jan Strohmandl et al., published by De Gruyter

This work is licensed under the Creative Commons Attribution 4.0 International License.

Articles in the same Issue

  1. Regular Articles
  2. Electrochemical studies of the synergistic combination effect of thymus mastichina and illicium verum essential oil extracts on the corrosion inhibition of low carbon steel in dilute acid solution
  3. Adoption of Business Intelligence to Support Cost Accounting Based Financial Systems — Case Study of XYZ Company
  4. Techno-Economic Feasibility Analysis of a Hybrid Renewable Energy Supply Options for University Buildings in Saudi Arabia
  5. Optimized design of a semimetal gasket operating in flange-bolted joints
  6. Behavior of non-reinforced and reinforced green mortar with fibers
  7. Field measurement of contact forces on rollers for a large diameter pipe conveyor
  8. Development of Smartphone-Controlled Hand and Arm Exoskeleton for Persons with Disability
  9. Investigation of saturation flow rate using video camera at signalized intersections in Jordan
  10. The features of Ni2MnIn polycrystalline Heusler alloy thin films formation by pulsed laser deposition
  11. Selection of a workpiece clamping system for computer-aided subtractive manufacturing of geometrically complex medical models
  12. Development of Solar-Powered Water Pump with 3D Printed Impeller
  13. Identifying Innovative Reliable Criteria Governing the Selection of Infrastructures Construction Project Delivery Systems
  14. Kinetics of Carbothermal Reduction Process of Different Size Phosphate Rocks
  15. Plastic forming processes of transverse non-homogeneous composite metallic sheets
  16. Accelerated aging of WPCs Based on Polypropylene and Birch plywood Sanding Dust
  17. Effect of water flow and depth on fatigue crack growth rate of underwater wet welded low carbon steel SS400
  18. Non-invasive attempts to extinguish flames with the use of high-power acoustic extinguisher
  19. Filament wound composite fatigue mechanisms investigated with full field DIC strain monitoring
  20. Structural Timber In Compartment Fires – The Timber Charring and Heat Storage Model
  21. Technical and economic aspects of starting a selected power unit at low ambient temperatures
  22. Car braking effectiveness after adaptation for drivers with motor dysfunctions
  23. Adaptation to driver-assistance systems depending on experience
  24. A SIMULINK implementation of a vector shift relay with distributed synchronous generator for engineering classes
  25. Evaluation of measurement uncertainty in a static tensile test
  26. Errors in documenting the subsoil and their impact on the investment implementation: Case study
  27. Comparison between two calculation methods for designing a stand-alone PV system according to Mosul city basemap
  28. Reduction of transport-related air pollution. A case study based on the impact of the COVID-19 pandemic on the level of NOx emissions in the city of Krakow
  29. Driver intervention performance assessment as a key aspect of L3–L4 automated vehicles deployment
  30. A new method for solving quadratic fractional programming problem in neutrosophic environment
  31. Effect of fish scales on fabrication of polyester composite material reinforcements
  32. Impact of the operation of LNG trucks on the environment
  33. The effectiveness of the AEB system in the context of the safety of vulnerable road users
  34. Errors in controlling cars cause tragic accidents involving motorcyclists
  35. Deformation of designed steel plates: An optimisation of the side hull structure using the finite element approach
  36. Thermal-strength analysis of a cross-flow heat exchanger and its design improvement
  37. Effect of thermal collector configuration on the photovoltaic heat transfer performance with 3D CFD modeling
  38. Experimental identification of the subjective reception of external stimuli during wheelchair driving
  39. Failure analysis of motorcycle shock breakers
  40. Experimental analysis of nonlinear characteristics of absorbers with wire rope isolators
  41. Experimental tests of the antiresonance vibratory mill of a sectional movement trajectory
  42. Experimental and theoretical investigation of CVT rubber belt vibrations
  43. Is the cubic parabola really the best railway transition curve?
  44. Transport properties of the new vibratory conveyor at operations in the resonance zone
  45. Assessment of resistance to permanent deformations of asphalt mixes of low air void content
  46. COVID-19 lockdown impact on CERN seismic station ambient noise levels
  47. Review Articles
  48. FMEA method in operational reliability of forest harvesters
  49. Examination of preferences in the field of mobility of the city of Pila in terms of services provided by the Municipal Transport Company in Pila
  50. Enhancement stability and color fastness of natural dye: A review
  51. Special Issue: ICE-SEAM 2019 - Part II
  52. Lane Departure Warning Estimation Using Yaw Acceleration
  53. Analysis of EMG Signals during Stance and Swing Phases for Controlling Magnetorheological Brake applications
  54. Sensor Number Optimization Using Neural Network for Ankle Foot Orthosis Equipped with Magnetorheological Brake
  55. Special Issue: Recent Advances in Civil Engineering - Part II
  56. Comparison of STM’s reliability system on the example of selected element
  57. Technical analysis of the renovation works of the wooden palace floors
  58. Special Issue: TRANSPORT 2020
  59. Simulation assessment of the half-power bandwidth method in testing shock absorbers
  60. Predictive analysis of the impact of the time of day on road accidents in Poland
  61. User’s determination of a proper method for quantifying fuel consumption of a passenger car with compression ignition engine in specific operation conditions
  62. Analysis and assessment of defectiveness of regulations for the yellow signal at the intersection
  63. Streamlining possibility of transport-supply logistics when using chosen Operations Research techniques
  64. Permissible distance – safety system of vehicles in use
  65. Study of the population in terms of knowledge about the distance between vehicles in motion
  66. UAVs in rail damage image diagnostics supported by deep-learning networks
  67. Exhaust emissions of buses LNG and Diesel in RDE tests
  68. Measurements of urban traffic parameters before and after road reconstruction
  69. The use of deep recurrent neural networks to predict performance of photovoltaic system for charging electric vehicles
  70. Analysis of dangers in the operation of city buses at the intersections
  71. Psychological factors of the transfer of control in an automated vehicle
  72. Testing and evaluation of cold-start emissions from a gasoline engine in RDE test at two different ambient temperatures
  73. Age and experience in driving a vehicle and psychomotor skills in the context of automation
  74. Consumption of gasoline in vehicles equipped with an LPG retrofit system in real driving conditions
  75. Laboratory studies of the influence of the working position of the passenger vehicle air suspension on the vibration comfort of children transported in the child restraint system
  76. Route optimization for city cleaning vehicle
  77. Efficiency of electric vehicle interior heating systems at low ambient temperatures
  78. Model-based imputation of sound level data at thoroughfare using computational intelligence
  79. Research on the combustion process in the Fiat 1.3 Multijet engine fueled with rapeseed methyl esters
  80. Overview of the method and state of hydrogenization of road transport in the world and the resulting development prospects in Poland
  81. Tribological characteristics of polymer materials used for slide bearings
  82. Car reliability analysis based on periodic technical tests
  83. Special Issue: Terotechnology 2019 - Part II
  84. DOE Application for Analysis of Tribological Properties of the Al2O3/IF-WS2 Surface Layers
  85. The effect of the impurities spaces on the quality of structural steel working at variable loads
  86. Prediction of the parameters and the hot open die elongation forging process on an 80 MN hydraulic press
  87. Special Issue: AEVEC 2020
  88. Vocational Student's Attitude and Response Towards Experiential Learning in Mechanical Engineering
  89. Virtual Laboratory to Support a Practical Learning of Micro Power Generation in Indonesian Vocational High Schools
  90. The impacts of mediating the work environment on the mode choice in work trips
  91. Utilization of K-nearest neighbor algorithm for classification of white blood cells in AML M4, M5, and M7
  92. Car braking effectiveness after adaptation for drivers with motor dysfunctions
  93. Case study: Vocational student’s knowledge and awareness level toward renewable energy in Indonesia
  94. Contribution of collaborative skill toward construction drawing skill for developing vocational course
  95. Special Issue: Annual Engineering and Vocational Education Conference - Part II
  96. Vocational teachers’ perspective toward Technological Pedagogical Vocational Knowledge
  97. Special Issue: ICIMECE 2020 - Part I
  98. Profile of system and product certification as quality infrastructure in Indonesia
  99. Prediction Model of Magnetorheological (MR) Fluid Damper Hysteresis Loop using Extreme Learning Machine Algorithm
  100. A review on the fused deposition modeling (FDM) 3D printing: Filament processing, materials, and printing parameters
  101. Facile rheological route method for LiFePO4/C cathode material production
  102. Mosque design strategy for energy and water saving
  103. Epoxy resins thermosetting for mechanical engineering
  104. Estimating the potential of wind energy resources using Weibull parameters: A case study of the coastline region of Dar es Salaam, Tanzania
  105. Special Issue: CIRMARE 2020
  106. New trends in visual inspection of buildings and structures: Study for the use of drones
  107. Special Issue: ISERT 2021
  108. Alleviate the contending issues in network operating system courses: Psychomotor and troubleshooting skill development with Raspberry Pi
  109. Special Issue: Actual Trends in Logistics and Industrial Engineering - Part II
  110. The Physical Internet: A means towards achieving global logistics sustainability
  111. Special Issue: Modern Scientific Problems in Civil Engineering - Part I
  112. Construction work cost and duration analysis with the use of agent-based modelling and simulation
  113. Corrosion rate measurement for steel sheets of a fuel tank shell being in service
  114. The influence of external environment on workers on scaffolding illustrated by UTCI
  115. Allocation of risk factors for geodetic tasks in construction schedules
  116. Pedestrian fatality risk as a function of tram impact speed
  117. Technological and organizational problems in the construction of the radiation shielding concrete and suggestions to solve: A case study
  118. Finite element analysis of train speed effect on dynamic response of steel bridge
  119. New approach to analysis of railway track dynamics – Rail head vibrations
  120. Special Issue: Trends in Logistics and Production for the 21st Century - Part I
  121. Design of production lines and logistic flows in production
  122. The planning process of transport tasks for autonomous vans
  123. Modeling of the two shuttle box system within the internal logistics system using simulation software
  124. Implementation of the logistics train in the intralogistics system: A case study
  125. Assessment of investment in electric buses: A case study of a public transport company
  126. Assessment of a robot base production using CAM programming for the FANUC control system
  127. Proposal for the flow of material and adjustments to the storage system of an external service provider
  128. The use of numerical analysis of the injection process to select the material for the injection molding
  129. Economic aspect of combined transport
  130. Solution of a production process with the application of simulation: A case study
  131. Speedometer reliability in regard to road traffic sustainability
  132. Design and construction of a scanning stand for the PU mini-acoustic sensor
  133. Utilization of intelligent vehicle units for train set dispatching
  134. Special Issue: ICRTEEC - 2021 - Part I
  135. LVRT enhancement of DFIG-driven wind system using feed-forward neuro-sliding mode control
  136. Special Issue: Automation in Finland 2021 - Part I
  137. Prediction of future paths of mobile objects using path library
  138. Model predictive control for a multiple injection combustion model
  139. Model-based on-board post-injection control development for marine diesel engine
  140. Intelligent temporal analysis of coronavirus statistical data
Downloaded on 8.9.2025 from https://www.degruyterbrill.com/document/doi/10.1515/eng-2021-0098/html
Scroll to top button