Simulation of the Use of the Material Handling Equipment in the Operation Process

  • Daniela Marasova , Janka Saderova and Lubomir Ambrisko EMAIL logo
Published/Copyright: March 10, 2020
Become an author with De Gruyter Brill

Abstract

The article presents the simulation model and simulation experiments aimed at the rationalisation of bottle necks in operations in terms of the capacity utilisation of the material handling equipment, in particular, six conveyance lines. The models and experiments were designed in the Tecnomatix simulation environment which facilitates the modelling of even more complex systems. The simulation model visualises the material flow within the production process comprising individual technological operations and workplaces. The model was used to perform simulation experiments with adjusted production times and added or removed workplaces. The presented article also contains the graphs of the utilised capacity of the machinery and operators. The obtained experimental results suggesting the partial or complete elimination of the accumulation of unfinished products.

1 Introduction

Prompt responses of accomplishments to various customer requirements, shortening delivery times, as well as on-time deliveries of required materials create the competition among companies and uncertainty on the market. Therefore, companies begin to offer not only high-quality products, but also comprehensive service packages [1]. Such service packages also include simulations of the effects of various decisions in a simulation model

to evaluate production capacities, duration of operations, and other necessary production parameters. Companies operating in different sectors of the economy are more and more commonly using IT solutions to optimize logistic systems by improving the handling of materials and performance parameters [2, 3, 4]. The use of simulation software products facilitates the identification of the expected result within a short period of time without any change in, or an intervention with the production process [5]. The analysis of the literature with a particular focus on applications in manufacturing provides paper [6]. The literature is classified into three general classes of manufacturing system design, manufacturing system operation, and simulation language/package development. Simulation was defined as a research method by many authors [7, 8, 9, 10]. Simulation may also be understood as the numerical method applying complex probability dynamic systems through experiments performed by using a computer model. The importance of the simulation consists in the reorganisation of a company aimed at increasing the efficiency of the company structure, re-engineering the technological and all business processes, restructuring the production program, and in the need for a considerable improvement of the production and business processes [11]. Optimisation of the production processes may be carried out by planning the production operations in a certain time [12], improving the production process at the execution level [13], or by applying special approaches aimed at improving the production efficiency [14].

The purpose of the presented research was to create an appropriate simulation model. Simulation experiments were aimed to remove idle times of the lines and thus to facilitate the smooth flow of the production transport and handling processes.

The aim of the article is creation a simulation model and conduction some experiments for rationalisation of narrow spaces in operations in terms of the capacity utilization of the material handling equipment.

2 Material and methods

2.1 Problem formulation

The aim of the research was to create a model on the basis of the analysis of the existing production times at workplaces and the number of employees engaged from the beginning of the production, through the controlling, up to the packing. The purpose of the simulation experiments was aimed to eliminate idle times of the line and to utilise optimally machinery equipment.

2.2 Description of the experiment and methods

The simulation experiments were done on the basis of changing of the input parameters.

The production process scheme contains the recorded events that occurred during the simulation process. The created model facilitated the subsequent revision of the events, execution of analyses, evaluations, comparisons of alternatives, and optimisation. The results may be implemented in real-life practice later. There are plenty of software products suitable for this purpose, such as WITNESS [15], Cosirob, Arena, Delmia, INTALA, Factor AIM, Cosimir, EXTEND and many more [16].

2.3 Creation of the model

The creation of the simulation model consisted of several steps so-called the simulation model creation methodology. The model creation itself is comprised in two stages; the simulation model designing and execution of experiments. The life cycle of the simulation model is described in Figure 1.

Figure 1 Simulation model creation process.
Figure 1

Simulation model creation process.

The critical stage of the modelling is the first stage, i.e., the familiarisation with the production, individual elements and relations. It is very important to determine the objective of the simulation. The objective should be determined on the basis of the questions like: Where are the bottle necks in the production area? What are the reasons for long lasting times?Why are the costs higher?Will the order deadline be adhered to?

The following stage is the creation of the simulation model in which the experiments will be performed with the goal to improve the system. Understanding of the researched system, especially the relations among the entities and systems, represents the basis for the correctly performed simulation.

3 Results and discussion

3.1 Analysis and collection of the input parameters of the model

The creation of the simulation model requires the input parameters listed in Table 1. The effects of the input parameters were researched in the production process of selected automotive company. Most frequently, they were the time parameters because the changes are made in time [13].

Table 1

Defined input data of the production process.

Production factorDescription
NC programsNumerical control programs for the execution of operations in machining centres (or work centres or accumulation centres).
Time schedulesTime schedules for the execution of operations over time.
Technological/Operational sheetsDocuments containing technological and operational data.
Data about sourcesData about all sources in the production system.
ResourcesRequired physical resources for the production process.
Human resourcesRequired human resources for the production process.
Machining partsMachining parts (or working parts or assembly parts) in the production process.
EnergyAll kinds of the required energy.

Simulation programs are classified by their functions. There are simulation programs for robotised workplaces and for the material flow simulation. The correct selection of a simulation program determines the efficiency of the simulation.

The simulation model was created in the Tecnomatix simulation program as a tool for the comprehensive portfolio of digital simulations of the production process. According to Siderska, it is a tool for the discrete simulation. It is suitable for the creation of digital models of the production. It examines and optimises the system performance [17]. It enables the simulation model designing, verification, and subsequent application in the production process. This simulation program (Figure 2) includes the Plant Simulation.

Figure 2 Example of production process designed using Tecnomatix Plant Simulation [17].
Figure 2

Example of production process designed using Tecnomatix Plant Simulation [17].

3.2 Production line characteristics

The production line was divided into two basic sections. The production itself starts by loading the material onto the line by using a cart. Products are transported along the production line to individual stations, i.e. workplaces. In order to monitor the assembly process, the carts are equipped with the so-called Mobby memory while they are moving through the line. This memory monitors the entire production process and the product crossing through the particular stations. In case of a failure, it sends the error message to the repair station. Each production station is equipped with a recording head. The production is started with manual loading and unloading of the material onto the conveyance lines. When the line parameters are adjusted, the material is only supplemented. Individual parts are passing through the entire production; they represent the product itself. The formalised scheme of the technological operations sequence of the production process in is illustrated in Figure 3.

Figure 3 The formalised scheme of the production process.
Figure 3

The formalised scheme of the production process.

The Line Section 1 is the area where nine basic technological operations were carried out, with 8 operators working at particular workplaces. The production starts with loading a batch on a line cart, then it continues to the gradual assembly of the product. The Line Section 1 also includes the repair station where the product is forwarded in the case of a failure. Finally, the semi-finished products pass through the section where the determined parameters are measured and then to the interconnecting belt. From this belt the semi-finished products are passed to the Line Section 2 or were placed on a pallet, for future processing. The number of operations, operation times, and the number of operators at both lines are listed in Table 2.

Table 2

Timelines of technological operations in the Line Sections 1.

OPERATIONS1st section of line
Operation timeNumber of operators
A - Loading of steel coils on roller conveyors15.01
B - The introduction of the coil into production13.00
C - Unwinding of coils using unwinders14.00
D - Punching of trays and transporting by vacuum conveyors18.03
E - Pressing of trays and their transport by gravity conveyors20.00
F - Can body pressing35.00
G - Application of internal and external varnish13.02
H - Forming the neck of can8.00
I - Quality control of cans2.00

3.3 Simulation model of the line

Tecnomatix simulation program environment was used for the simulation model of the line. This model depicts the production process and the passage of products through particular technological operations designated as Operations A – I. The created model of the Line Section 1 is shown in Figure 4.

Figure 4 Simulation model of the line in Tecnomatix.
Figure 4

Simulation model of the line in Tecnomatix.

After the simulation of the existing state of technological operations in the created model (Figure 4), there were v isible critical operations, accumulation of unfinished products (entities) after Operations A and B, at the entry to Operation D, and before the entry to Operation E; this may be also seen in Figure 5 showing the capacity utilisation of individual operations.

Figure 5 Capacity utilisation (time utilisation of technological operations) - existing situation.
Figure 5

Capacity utilisation (time utilisation of technological operations) - existing situation.

Figure 5 shows that the first two operations are significantly blocked. The first operation represents 45% of the total simulated time. The station was blocked up to 55% of the total time. Operation B ran in 37% and the remaining 63% of time represented the blockage of this operation.Operation C was performed on 4 identical equipment (C1, C2, C3, and C4). Each of them worked only in 17% of the total simulated time and the remaining 83% of the time represented idle times. Operation E represented 99% of the simulated time. Other technological operations represented on average 24% of the simulated time. It was possible to identify critical sites of the entire process, i.e. the accumulation of unfinished products before Operations B, C, and E on the basis of the simulation.

These findings indicate the need to optimize of the performance of these technological operations. This may be achieved, for example, by reducing the times of selected operations, if the production technology allows such a reduction. Another way, how to achieve this, is to add an equipment at critical sites in order to eliminate the bottle neck.

Therefore, several experiments were done with the above described model. They were aimed at eliminating the accumulation of unfinished products at critical sites. Figure 6 presents the results of the capacity utilisation for particular operations in the experiment in which the times of technological Operations A, B, and G were changed. The production times of these operations were decreased in 2 seconds and the time of the technological Operation C was reduced in 4 seconds (acceptable change).

Figure 6 Capacity utilisation (time utilisation of technological operations) – experiment.
Figure 6

Capacity utilisation (time utilisation of technological operations) – experiment.

Figure 6 shows the changes in comparison to Figure 5. The technological Operation A was performed in 65% of the total simulated time; 12% of the simulated time represented idle time (waiting); and there was the blockage of entities 23% of the simulated time. The execution of the technological Operation B represented 49% of the total simulated time; 10% represented idle time (waiting); and there was the blockage of entities 41% of the simulated time. Also the execution of Operation C represented n 17% of the simulated time and the remaining 83% represented the idle time (waiting). The technological operation E represented 70% of the simulated time and 30% represented the idle time. In this case, other technological operations represented on average 21% of the simulated time.

4 Conclusion

The article discusses some scenarios regarding the simulation modeling and experiments focused on streamlining the bottlenecks in operations in terms of the capacity utilization in the context of material handling equipment when implementing Tecnomatix simulation software.

The production process timelines confirmed certain irregularities in terms of the duration percentages of individual technological operations. For example, the machining and assembly operations represented approximately 5% of the total duration of the production process. The placement of physical sources in preparatory operations or waiting prior to the follow-up operations during the adjusting times, and transport and handling represented approximately 95%.

The obtained results allow to conclude the discussion that the reduction of the times of selected technological operations resulted in the following:

  1. Increased production rate of the operations;

  2. Reduced amounts of accumulated unfinished products after the Operations A and B (this was not completely eliminated);

  3. Reduced production rate of Operation G (in this case a 29% decreasing) and increased idle times up to 30%; this had a negative effect on the performance of the entire production line.

Not only this experiment, but also other performed experiments brought the conclusion suggesting that the partial or complete elimination of the accumulation of unfinished products which, however, resulted in lower output of Operation G, reduced average times of several technological operations below 20% of the simulated time, especially G, H, and I (end operations), when compared to the baseline status.

The optimal setting of the production line remains to be open for the future and will be subjected to further research.

Acknowledgement

This contribution was created with the support of projects APVV-18-0248 titled “Smart Belt Conveyors” and VEGA 1/0577/17 titled “Transfer of knowledge from laboratory experiments and mathematical models in the creation of a knowledge based system for assessing the quality environmentally friendly conveyor belts”.

References

[1] Londhekar MS. Process simulation analysis of quality management system in industries. Res. J. Engineering Sci. 2012;1:57–60.Search in Google Scholar

[2] Jagelcak J, Kubasakova I. Load distribution in general purpose maritime container and the analysis of load distribution on extendable semitrailer container chassis carrying different types of containers. Nase More (Dubr). 2014;61:106–16.Search in Google Scholar

[3] Stopka O, Kampf R. Determining the most suitable layout of space for the loading units’ handling in the maritime port. Transport. 2018;33(1):280–90.10.3846/16484142.2016.1174882Search in Google Scholar

[4] Bindzar P, Malindzak D. Number of conveyor belts optimization regarding to its type and logistical parameters in mining industry. Acta Montan Slovaca. 2008;14:524–31.Search in Google Scholar

[5] Alomair I, Ahmad A, Alghamdi A. A review of evaluation methods and techniques for simulation packages. Procedia Comput Sci. 2015;62:249–56.10.1016/j.procs.2015.08.447Search in Google Scholar

[6] Negahban A, Smith JS. Simulation for manufacturing system design and operation: literature review and analysis. J Manuf Syst. 2014;33(2):241–61.10.1016/j.jmsy.2013.12.007Search in Google Scholar

[7] Cujan Z. Simulation of production lines supply within internal logistics systems. Open Eng. 2016;6(1):470–5.10.1515/eng-2016-0061Search in Google Scholar

[8] Sedlacek M. The use of simulation models in solving the problems of merging two plants of the company. Open Eng.;7:31–6.10.1515/eng-2017-0004Search in Google Scholar

[9] Saderova J, Kacmary P. The simulation model as a tool for the design of number of storage locations in production buffer store. Acta Montan Slovaca. 2013;18:33–9.Search in Google Scholar

[10] Straka M, Hurna S, Bozogan M, Spirkova D. Using continuous simulation for identifying bottlenecks in specific operation. Int J Simul Model. 2019;18(3):408–19.10.2507/IJSIMM18(3)477Search in Google Scholar

[11] Santos BM, Garlet TB, Klein L, Silveira F, Rodrigues PC, Bueno W. Simulation model of a stop production line: the relationship between financial return and productivity. Indep J Manag Prod. 2019;10(4):1305–23.10.14807/ijmp.v10i4.969Search in Google Scholar

[12] Trebuna P, Pekarcikova M, Edl M. Digital value stream mapping using the Tecnomatix plant simulation software. Int J Simul Model. 2019;18(1):19–32.10.2507/IJSIMM18(1)455Search in Google Scholar

[13] Straka M, Rosova A, Lenort R, Besta P, Saderova J. Principles of computer simulation design for the needs of improvement of the raw materials combined transport system. Acta Montan Slovaca. 2019;23:163–74.Search in Google Scholar

[14] Musil M, Laskovsky V, Fialek P. Analysis of logistic processes using the software Tecnomatix plant simulation, In: Conference Proceedings ICIL 2016 International Conference on Industrial Logistics, (Zakopane, Poland), 2016, 195-200Search in Google Scholar

[15] Dutkova M., Dutko S., Bigos P., Simulation models in logistics - Witness program, Zdvihací zařízení v teorii a praxi, 2010, 1, 15-21Search in Google Scholar

[16] Straka M. Theoretical Bases of Simulation - EXTENDSIM Simulation System 9.x. Kosice: Technical University of Kosice; 2017.Search in Google Scholar

[17] Siderska J. Application of Tecnomatix plant simulation for modeling production and logistics processes. Bus. Man. Educ. 2016;14(1):64–73.10.3846/bme.2016.316Search in Google Scholar

Received: 2019-10-30
Accepted: 2020-01-15
Published Online: 2020-03-10
Published in Print: 2020-03-10

© 2020 D. Marasova et al., published by De Gruyter

This work is licensed under the Creative Commons Attribution 4.0 International License.

Articles in the same Issue

  1. Regular Articles
  2. Fabrication of aluminium covetic casts under different voltages and amperages of direct current
  3. Inhibition effect of the synergistic properties of 4-methyl-norvalin and 2-methoxy-4-formylphenol on the electrochemical deterioration of P4 low carbon mold steel
  4. Logistic regression in modeling and assessment of transport services
  5. Design and development of ultra-light front and rear axle of experimental vehicle
  6. Enhancement of cured cement using environmental waste: particleboards incorporating nano slag
  7. Evaluating ERP System Merging Success In Chemical Companies: System Quality, Information Quality, And Service Quality
  8. Accuracy of boundary layer treatments at different Reynolds scales
  9. Evaluation of stabiliser material using a waste additive mixture
  10. Optimisation of stress distribution in a highly loaded radial-axial gas microturbine using FEM
  11. Analysis of modern approaches for the prediction of electric energy consumption
  12. Surface Hardening of Aluminium Alloy with Addition of Zinc Particles by Friction Stir Processing
  13. Development and refinement of the Variational Method based on Polynomial Solutions of Schrödinger Equation
  14. Comparison of two methods for determining Q95 reference flow in the mouth of the surface catchment basin of the Meia Ponte river, state of Goiás, Brazil
  15. Applying Intelligent Portfolio Management to the Evaluation of Stalled Construction Projects
  16. Disjoint Sum of Products by Orthogonalizing Difference-Building ⴱ
  17. The Development of Information System with Strategic Planning for Integrated System in the Indonesian Pharmaceutical Company
  18. Simulation for Design and Material Selection of a Deep Placement Fertilizer Applicator for Soybean Cultivation
  19. Modeling transportation routes of the pick-up system using location problem: a case study
  20. Pinless friction stir spot welding of aluminium alloy with copper interlayer
  21. Roof Geometry in Building Design
  22. Review Articles
  23. Silicon-Germanium Dioxide and Aluminum Indium Gallium Arsenide-Based Acoustic Optic Modulators
  24. RZ Line Coding Scheme With Direct Laser Modulation for Upgrading Optical Transmission Systems
  25. LOGI Conference 2019
  26. Autonomous vans - the planning process of transport tasks
  27. Drivers ’reaction time research in the conditions in the real traffic
  28. Design and evaluation of a new intersection model to minimize congestions using VISSIM software
  29. Mathematical approaches for improving the efficiency of railway transport
  30. An experimental analysis of the driver’s attention during train driving
  31. Risks associated with Logistics 4.0 and their minimization using Blockchain
  32. Service quality of the urban public transport companies and sustainable city logistics
  33. Charging electric cars as a way to increase the use of energy produced from RES
  34. The impact of the truck loads on the braking efficiency assessment
  35. Application of virtual and augmented reality in automotive
  36. Dispatching policy evaluation for transport of ready mixed concrete
  37. Use of mathematical models and computer software for analysis of traffic noise
  38. New developments on EDR (Event Data Recorder) for automated vehicles
  39. General Application of Multiple Criteria Decision Making Methods for Finding the Optimal Solution in City Logistics
  40. The influence of the cargo weight and its position on the braking characteristics of light commercial vehicles
  41. Modeling the Delivery Routes Carried out by Automated Guided Vehicles when Using the Specific Mathematical Optimization Method
  42. Modelling of the system “driver - automation - autonomous vehicle - road”
  43. Limitations of the effectiveness of Weigh in Motion systems
  44. Long-term urban traffic monitoring based on wireless multi-sensor network
  45. The issue of addressing the lack of parking spaces for road freight transport in cities - a case study
  46. Simulation of the Use of the Material Handling Equipment in the Operation Process
  47. The use of simulation modelling for determining the capacity of railway lines in the Czech conditions
  48. Proposals for Using the NFC Technology in Regional Passenger Transport in the Slovak Republic
  49. Optimisation of Transport Capacity of a Railway Siding Through Construction-Reconstruction Measures
  50. Proposal of Methodology to Calculate Necessary Number of Autonomous Trucks for Trolleys and Efficiency Evaluation
  51. Special Issue: Automation in Finland
  52. 5G Based Machine Remote Operation Development Utilizing Digital Twin
  53. On-line moisture content estimation of saw dust via machine vision
  54. Data analysis of a paste thickener
  55. Programming and control for skill-based robots
  56. Using Digital Twin Technology in Engineering Education – Course Concept to Explore Benefits and Barriers
  57. Intelligent methods for root cause analysis behind the center line deviation of the steel strip
  58. Engaging Building Automation Data Visualisation Using Building Information Modelling and Progressive Web Application
  59. Real-time measurement system for determining metal concentrations in water-intensive processes
  60. A tool for finding inclusion clusters in steel SEM specimens
  61. An overview of current safety requirements for autonomous machines – review of standards
  62. Expertise and Uncertainty Processing with Nonlinear Scaling and Fuzzy Systems for Automation
  63. Towards online adaptation of digital twins
  64. Special Issue: ICE-SEAM 2019
  65. Fatigue Strength Analysis of S34MnV Steel by Accelerated Staircase Test
  66. The Effect of Discharge Current and Pulse-On Time on Biocompatible Zr-based BMG Sinking-EDM
  67. Dynamic characteristic of partially debonded sandwich of ferry ro-ro’s car deck: a numerical modeling
  68. Vibration-based damage identification for ship sandwich plate using finite element method
  69. Investigation of post-weld heat treatment (T6) and welding orientation on the strength of TIG-welded AL6061
  70. The effect of nozzle hole diameter of 3D printing on porosity and tensile strength parts using polylactic acid material
  71. Investigation of Meshing Strategy on Mechanical Behaviour of Hip Stem Implant Design Using FEA
  72. The effect of multi-stage modification on the performance of Savonius water turbines under the horizontal axis condition
  73. Special Issue: Recent Advances in Civil Engineering
  74. The effects of various parameters on the strengths of adhesives layer in a lightweight floor system
  75. Analysis of reliability of compressed masonry structures
  76. Estimation of Sport Facilities by Means of Technical-Economic Indicator
  77. Integral bridge and culvert design, Designer’s experience
  78. A FEM analysis of the settlement of a tall building situated on loess subsoil
  79. Behaviour of steel sheeting connections with self-drilling screws under variable loading
  80. Resistance of plug & play N type RHS truss connections
  81. Comparison of strength and stiffness parameters of purlins with different cross-sections of profiles
  82. Bearing capacity of floating geosynthetic encased columns (GEC) determined on the basis of CPTU penetration tests
  83. The effect of the stress distribution of anchorage and stress in the textured layer on the durability of new anchorages
  84. Analysis of tender procedure phases parameters for railroad construction works
  85. Special Issue: Terotechnology 2019
  86. The Use of Statistical Functions for the Selection of Laser Texturing Parameters
  87. Properties of Laser Additive Deposited Metallic Powder of Inconel 625
  88. Numerical Simulation of Laser Welding Dissimilar Low Carbon and Austenitic Steel Joint
  89. Assessment of Mechanical and Tribological Properties of Diamond-Like Carbon Coatings on the Ti13Nb13Zr Alloy
  90. Characteristics of selected measures of stress triaxiality near the crack tip for 145Cr6 steel - 3D issues for stationary cracks
  91. Assessment of technical risk in maintenance and improvement of a manufacturing process
  92. Experimental studies on the possibility of using a pulsed laser for spot welding of thin metallic foils
  93. Angular position control system of pneumatic artificial muscles
  94. The properties of lubricated friction pairs with diamond-like carbon coatings
  95. Effect of laser beam trajectory on pocket geometry in laser micromachining
  96. Special Issue: Annual Engineering and Vocational Education Conference
  97. The Employability Skills Needed To Face the Demands of Work in the Future: Systematic Literature Reviews
  98. Enhancing Higher-Order Thinking Skills in Vocational Education through Scaffolding-Problem Based Learning
  99. Technology-Integrated Project-Based Learning for Pre-Service Teacher Education: A Systematic Literature Review
  100. A Study on Water Absorption and Mechanical Properties in Epoxy-Bamboo Laminate Composite with Varying Immersion Temperatures
  101. Enhancing Students’ Ability in Learning Process of Programming Language using Adaptive Learning Systems: A Literature Review
  102. Topical Issue on Mathematical Modelling in Applied Sciences, III
  103. An innovative learning approach for solar power forecasting using genetic algorithm and artificial neural network
  104. Hands-on Learning In STEM: Revisiting Educational Robotics as a Learning Style Precursor
Downloaded on 12.12.2025 from https://www.degruyterbrill.com/document/doi/10.1515/eng-2020-0015/html
Scroll to top button