Abstract
Integrated supply chains, due to their complexity, are vulnerable in relation to various types of risks, especially in the present turbulent market environment, characterised by increased demand for effectiveness of the individual logistic activities, extended customer service and decreased cost. The supply chain risks are represented by any threatening event that may unexpectedly disrupt or restrict material flow, or directly stop the scheduled logistic or manufacturing activities. Supply chain risk management includes risk identification, analysis and implementation of measures against potential risk consequences. This article describes supply chain management, risk elimination methods in the case of a technological breakdown and potential subsequent supply chain failure and application of the modified Failure Mode, Effects & Criticality Analysis (FMECA).
1 Introduction
At present, in the period of frequent market turbulences, potential supply chain risks must be prevented, and if the prevention fails, then the consequences must be eliminated to the maximum extent possible. Risk prevention can be achieved above all by profound analysis of potential risks and preparation of a strategic plan for potential risk consequence minimisation already at the moment of the risk occurrence [1].
Larger organisations have specialised staff working on ongoing potential risk analyses and strategic plan updates for risk consequence minimisation. Smaller organisations and small entrepreneurs usually endow their top management, or their owner, with the responsibility for decisions in the case of potential risk occurrence.
Supply chain management is [2, 3, 4], where this area is analysed, including the relations between the individual links of the chain. There are known solutions related to production management, using above all the methods of brainstorming, cause and effect diagrams, 5 why, Pareto analysis, or FMEA method. These methods are described by many authors, see for [5, 6, 7, 8].
In the area of plastic processing there is a unique processing technology of artificial leather made of powder PVC, described in the technological procedure of its manufacture in special-purpose manufacturing equipment developed solely for this purpose. A similar issue is addressed by [9, 10]. On the basis of this technology a risk analysis method called FMECA has been developed. Applications of this method have resulted in definitions of critical conditions for enterprise management and substitute solutions in case of production failure (breakdown) applicable even before the production breakdown actually occurs.
2 Methods
There are several established methods of risk identification and evaluation, used variedly on different levels of assessment and identification. Each of them has been created for a specific problem and therefore they are not mutually comparable. They are used for assessment of risk probability and seriousness. The result is risk classification as acceptable or non-acceptable.
FMECA is an improved version of FMEA extended with a section on criticality analysis, used for mapping the probability of failure modes against consequence impact. FMECA can be illustrated as a method for identification of system failures, their causes and impact. In relation to criticality the FMECA process can be used for identification and focus on the integrated supplier chain in production management.
FMECA may further be useful in improvements of product and process design, which may led to improved reliability, safety and quality, cost reduction and increased customer satisfaction. This tool would be useful for creation and optimisation of replaceable system maintenance plans and other quality assurance procedures
Risk acceptability assessment [1]
| Levels of seriousness | ||||
|---|---|---|---|---|
| 1 | 2 | 3 | 4 | |
| Failure frequency | Insignificant | Marginal | Critical | Catastrophic |
| 5 - Frequent | Undesirable | Unacceptable | Unacceptable | Unacceptable |
| 4 – Probable | Acceptable | Undesirable | Unacceptable | Unacceptable |
| 3 - Occasional | Acceptable | Undesirable | Undesirable | Unacceptable |
| 2 – Very weak | Negligible | Acceptable | Undesirable | Undesirable |
| 1 – Improbable | Negligible | Negligible | Acceptable | Acceptable |
In addition both FMEA and FMECA are required to meet the requirements for quality and safety, such as ISO 9001, Six Sigma, Good Manufacturing Practice (GMP), the Act on Process Safety Management etc.
Supply chain risk prevention and continuous material and goods flow assurance, as the top priority for every supplier, beneficially uses the FMECA method. FMECA – ČSN EN 60812:2007 is described in the national technical standards of the Czech Republic as an expression of potential failure occurrence and consequence analysis [1].
FMECA is a team-oriented method used for development, planning, manufacturing and supply process risk minimisation and requiring interdisciplinary cooperation of all supply chain stakeholders since the very beginning of their cooperation.
FMECA is a semi-quantitative method used to identify failures with significant effects for the system function. Seriousness of failure effects is described in terms of criticality. There are several classes or levels of criticality related to the hazards for and reduction of operability of the system, and sometimes also to probability of the risk occurrence. When defining criticality people usually make two fundamental mistakes: First they incorrectly estimate the criticality value. This mistake is made where there are many individual criticality levels. And second they overly round up the input error and thus also the output error. This mistake is made if there are few criticality levels. Limiting the size of one error increases the effect of the other.
2.1 System Elements and System Structure of Modified FMECA
The system includes system elements used for hardware concept description and classification and arranged in a system structure forming a hierarchy of the system elements [11].
Risk potential analysis is performed for each monitored element described within the system with specification of its potential consequence and significance quantification on a 10-point scale.
If the risk acceptability level is generally specified all identified risks can be divided in two groups:
Acceptable risks
Unacceptable risks
Each business forming part of the supply chain has a problem to define the risk acceptability threshold, unique and unrepeatable for every business. Specification of this threshold is subjective and influenced by multiple factors.
The risk calculation is based on mathematical expression of risk as a function of multiple variables [1]:
Variables in the equation:
p1 – risk probability
p2 – effect size
p3 – detection probability
2.2 Procedure of FMECA Method Application
2.2.1 Implementation Team Formation
The team should include people on various organisational levels who know the process, possess the needed experience, ideally from multiple fields, and are communicative. An “ideal” team should consist of 5-7 members but there are also teams of around 15 assessors. The most important thing is to engage imagination and courage to express one´s own ideas and opinions. The team should ideally include one knowledgeable moderator. An external party is used as an exception, for the method is relatively simple.
2.2.2 Specification of All Potential or Probable Defects of the Proposal
This is where experience of the individual team members with similar previous proposals, knowledge of the issue, technological options available etc. – team work – are utilised.
2.2.3 Priority Definition
With regard to consequences, i.e. the level of impact on the customer, and cause of occurrence, i.e. the scope of occurrence in use, and finally with regard to the scope of the necessary controls, i.e. the probability of the risk detection, the risks are categorised as follows.
2.2.4 Risk Categorisation
Scoring by priority
2.2.5 Evaluation
Risk evaluation is based on characteristic numbers. The risk number specifies the priority of dealing with the problem.
2.2.6 Proposal of Adequate Measures
Clearly the higher the risk number, the more effort should be exercised to deal with the risk, i.e. to plan and deploy remedial measures. But there are also cases of low risk numbers that need reasonably early addressing for one reason or another.
2.2.7 Measure Implementation
New Status Assessment – i.e. repetition of the whole process
The resulting calculated RPN indicator focuses priority on elimination of the failure causes in the supply chain links [12].
3 Results
Generally, transport is the top risk link of the supply chain. Organisations transporting goods face many risks. Some of them are hardly predictable and therefore timely and good preparation for them is difficult. These include natural phenomena occurring independently of human will (earthquake, flood, flash of lightning, gale, avalanche etc.). Another risk category includes anthropological risks (traffic accidents, train derailing, airplane crashes, ship wrecking etc.), unprofessional load handling and many more [13].
Risk may occur in any supply chain link. Natural disasters, warehouse fires or factory explosions are not the highest risks. Much more real threats are represented by supplier failure, manufacture interruption, logistic difficulties, IT faults, or growing oil and energy prices with the related risk of cost increase. For example storage brings about risks represented by natural disasters such as flood, fire, gale, snowfall, hailstorm, and further the risks of theft, vandalism etc. The presently used modern technologies allow for goods monitoring at nearly every stage of their transport. This technology significantly contributes to prevention of goods theft during transport.
A newly emerging risk factor, in addition to terrorist attacks, is cyber terrorism, represented by both external intruders and data abuse within the organisation. Occurrence of random events may cause damage or loss of the transported goods. Also the means of transport can be damaged.
Effective prevention and utilisation of current data and statistical analysis methods is the most effective method of supply chain risk minimisation. There are analyses helping prevent some emergencies in the area of manufacturing equipment. The first step of risk management is identification of key products, processes and localities forming parts of the supply chain. The identification is needed as part of raw material supply tenders as well as of end product or part delivery including all possible events that might affect their production and supply. The next step is risk management strategy establishment for all stages and potential weak points of the process. Risk management should not be set within the company only but across the whole supply chain in cooperation with both the suppliers and the customers.
Integration of the individual logistic links into integral supply chains definitely brings about several advantages in the area of risk reduction. Sharing of information, for example about material, finished product and goods stock or about the status of customer order coverage, dramatically reduces uncertainty of decision-making, stock shortage on the individual levels and obviously also related costs.
Supply chain integration in itself however introduces one significant risk factor, and that is mutual dependence of individual links of the supply chain. As all links are interconnected, the risk manifested in one of them is transferred onto the other links and affects the whole supply chain and its ability to function faultlessly. It is therefore recommended to realize certain relations and respond to them properly when setting the relations between chain links within the supply chain [13, 14]:
Risk within supply chain usually begins on the level of the key link from where it spreads further. The key link managers should formulate a risk management policy, create a system of risk management, or appoint a risk control team and share their experience with the other links within the supply chain.
The more the company applies the lean manufacture principles and the more quickly it is able to adapt to customer requirements, the higher is the probability of risk occurrence - but the truth is that on the current knowledge level there is no other, more appropriate way to be competitive in the present turbulent market environment and elimination of the lean manufacture principles and quick adaptation to customer needs would certainly be a step backward.
The chain is only as strong and reliable as is its weakest link. That is why the weakest link needs to be strictly identified and work on potential risk areas with possible impact on the whole chain must be done.
Appropriate prevention is always better (and usually also cheaper in terms of costs) than consequence addressing.
It is necessary to be prepared for potential risk events – for example in terms of substitute capacities, finished product stock, financial reserves, and work on effective alternatives of the current enterprise functioning in the crisis mode.
No manager is (likely to be) able to identify 100% of potential risks and be fully prepared for each of them when it occurs. It is therefore good to anticipate, monitor the current situation and flexibly respond to stimuli.
Mutual dependence of individual chain links inside integrated supply chains is not the only problem, though. Certain specific risks occurring within a supplier chain hide the potential of significant negative impact on another supply chain or group of chains and this is often hard to predict.
What needs to be emphasized in this context is that an identical risk may generate different progress scenarios and even the best crisis scenario is unable to describe all options in sufficient detail. In addition, when the risk event actually occurs, it would be very difficult to readily find the correct instruction applicable to the particular event out of the many available and implement it within a short time span. That is why when a risk event occurs (i.e. when prevention fails or effective risk prevention was not possible) the crisis management plan must be supported with the skills of the managers able to quickly react to the current condition thanks to their managerial experience, creative approach and also intuition, for that is the only way to manage the broad spectrum of different factors entering the decision-making processes concerning appropriate response for minimisation of damage caused by the particular risk.
3.1 Manufacturing Technology Related Risks
A good example may be manufacturing technology for production of artificial leather of PVC powder on a single-purpose machine of foreign origin, producing interior equipment for automotive industry of powder PVC.

A section of the top part of dashboard made of PVC powder. Source: In-house
The working part of the machine includes a horizontally laid roller with a dividing plane along its axis permitting the roller opening and placing a mould with a cavity the surface of which is the negative of the future interior part including the design surface. The required powder colour is selected and the needed quantity of the powder PVC is measured and put inside the mould cavity and the roller is closed. At the same time the inside space of the roller is filled with gas by a hollow shaft ended with a gas burner. When the roller inside is heated to the required temperature the powder PVC melts, the roller begins to rotate and the cavity is filled evenly with the melted PVC by centrifugal force action. This makes the required interior part, usually creating a surface that cannot be unfolded, such as the dashboard. After a short cooling of the roller inside by cold air the roller is opened and the still warm part is taken out by the operator using protective gloves. Then the burrs are removed mechanically and the surface (design) of the finished part is checked under an UV lamp. This manufacturing method is also beneficial for manufacture of automotive interior parts, otherwise hard to produce.
Modified risk relevant assessment table (Source: In-house)
| Consequence | Risk relevance | Risk evaluation |
|---|---|---|
| Dangerous – no warning | The risk may threaten the end customer, occurs without warning and threatens the whole supply chain. | 10 |
| Dangerous – with warning | The risk may threaten the end customer. Although it occurs with warning it threatens the whole supply chain. | 9 |
| Very high | Significant risk, when more links of the supply chain are not in compliance with the customer requirements. | 8 |
| High | High risk, when one chain link threatens more suppliers and thus also the end customer. | 7 |
| Medium Low | Medium risk, when one chain link threatens more suppliers. Low risk, when one chain link threatens the next downstream supplier in the supply chain. | 6 5 |
| Very low | Very low risk when one chain link must perform 100% check of the goods | 4 |
| Small | Small risk when one chain link must perform 50% check of the goods | 3 |
| Very small | Very small risk when one chain link must perform 25% check of the goods | 2 |
| None | No consequence | 1 |
The manufacture of automotive interior parts of powder PVC on a foreign-made machine, the only manufacturing equipment in the organisation for this purpose, represents a manufacturing technology related risk. The same machine is used by a sister company abroad.
Following a detailed analysis of potential risks a strategic plan of risk management was needed to minimise potential consequences of threatening manufacture stop as soon as they occur. The strategic plan included creation of a sufficient reserve stock of finished parts n complete sets both on the manufacturer´s and on the customer´s side. The safety reserve stock would bridge the period needed for the mould transport to the sister company and commencement of substitute manufacture including return of the finished products back to the factory for assembly. The strategic plan of risk management was discussed by the manufacturing plant with the sister company abroad, approved including a schedule of substitute manufacture assurance and confirmed by an executed contract.
4 Discussion
At present there are already different measures permitting control of small risks that cannot be prevented. These measures include order record keeping in reliable inventory systems connected to the suppliers, which may prevent problems of mutual communication. Anexecuted and legally controlled contract is however the key instrument of risk prevention. If the supply chain is disrupted in any way a quick remedial response minimises the risk impact.
At present supply chain management is affected by factors related to increasing customer demand for quick response to changes brought about by innovations, high quality levels, cost reduction etc., which require process optimisation in all its components.
4.1 System Elements and System Structure of Modified FMECA
The system consists of system elements used for description and classification of the hardware concept and arranged into a hierarchical system structure [11].
Risk occurrence probability assessment (Source: In-house)
| Risk occurrence probability | Probable occurrence | Evaluation |
|---|---|---|
| Very high | 1 – 2 of 2 | 10 |
| 1 of 3 | 9 | |
| High | 1 of 8 | 8 |
| 1 of 20 | 7 | |
| Medium | 1 of 80 | 6 |
| 1 of 400 | 5 | |
| 1 of 2000 | 4 | |
| Low | 1 of 15000 | 3 |
| 1 of 150000 | 2 | |
| Improbable | Less than 1 of 1500000 | 1 |
Potential risk occurrence analysis is performed for each monitored system element described in the system, with specification of potential impact and quantification of its relevance on a 10-point scale.
Possible risk causes due to defective function of subordinate system elements are allocated to a certain superimposed system element. Risk occurrence probability is estimated for every possible cause, with quantification on a 10-point scale.
The analysis is ended by a list of existing preventive measures (measures for risk prevention) and the introduced control measures, for which the probability of the risk cause (mechanism) detection is quantified on a 10-point scale.
When assessing the integrated supplier chain and control calculation execution the authors arrived at the conclusion that the unique production components represent the highest risk element (the most vulnerable part), as, if out of operation, they may cause failure of the whole system. Therefore a substitute solution must be prepared for each of these components.
5 Conclusion
After specification of all three scores the integrated criterion is calculated for each potential risk occurrence due to a defined cause. This is called the risk number, or RPN (Risk Priority Number), calculated as the product of the relevant scores of the individual evaluated criteria:
Modified risk occurrence cause evaluation (Source: In-house)
| Detection | Probability of risk occurrence detection | Evaluation |
|---|---|---|
| Impossible | Potential risk occurrence cause detection is absolutely impossible | 10 |
| Very remote | Very remote possibility to detect potential risk cause | 9 |
| Remote | Remote possibility to detect potential risk cause | 8 |
| Very low | Very low possibility to detect potential risk cause | 7 |
| Low | Low possibility to detect potential risk cause | 6 |
| Average | Average possibility to detect potential risk cause | 5 |
| Slightly above-average | Slightly above-average possibility to detect potential risk cause | 4 |
| High | High possibility to detect potential risk cause | 3 |
| Very high | Very high possibility to detect potential risk cause | 2 |
| Nearly certain | Detection of potential risk cause is nearly certain | 1 |
The RPN value must not exceed the defined threshold (for automotive industry RPN ≤ 120). In the case of higher RPN remedial measures are taken to lower the value.
Potential risk control in supply chain with the help of modified FMECA means finding potential supply chain failures. Risk probability scoring in relation to consequences for the end customer and the chances of the potential risk detection by the existing system reduces the threat of the risk occurrence.
Important prerequisites for the above described method application include team work, knowledge of simple quality management methods (brainstorming, cause and effect diagram, 5 why, Pareto analysis etc.) and management support.
The result is a proposed solution of elimination of the risk of manufacture failure with subsequent measure – execution of a contract for use of the same machine in another manufacturing company for the reason of minimisation of production loss.
Acknowledgement
This work is a part of these projects RVO/FLKŘ/2019/05, IGA/FLKŘ/2019/001.
References
[1] Švec, L. (2016) Risk management. FMEA method. 1st ed. Ostrava. Retrieved Jun 16, 2019, from https://docplayer.cz/18338444-1-management-rizik-metoda-fmea.htmlSearch in Google Scholar
[2] Lourenço, H. R., Ravetti, M. G. (2018). Supply chain management. Handbook of Heuristics, (pp. 1241–1258), Berlin: Springer International Publishing.10.1007/978-3-319-07124-4_54Search in Google Scholar
[3] Islam, D. M. & Fabian Z. & Meier, J. & Aditjandra, P. T. & Zunder, T. H., & Pace, G. (2013). Logistics and supply chain management. Research in Transportation Economics, 41(1), 3–16. https://doi.org/10.1016/j.retrec.2012.10.00610.1016/j.retrec.2012.10.006Search in Google Scholar
[4] Calhoun, F. S., Weston, F. S., & StephenW. (2010). Introduction to Supply Chain Management Technologies. Introduction to Supply Chain Management Technologies. (2nd ed). Boca Raton, USA: CRC Press.10.1201/b10295Search in Google Scholar
[5] Strohmandl, J. Tomek, M., Vargová, S., Čujan, Z. (2018). The use of the FMEA method for the evaluation of failures in crawler cranes. In VVaPOL 2018, 18. – 21. September 2018, Podbanské, SK, MATEC Web of Conferences 263, 01004 (2019).10.1051/matecconf/201926301004Search in Google Scholar
[6] Davies, P. (2019) Brainstorming. 70 Activities for Tutor Groups. Abingdon: Taylor & Francis Group.Search in Google Scholar
[7] Banghart, M., Fuller, K. (2014). Utilizing confidence bounds in Failure Mode Effects Analysis (FMEA) Hazard Risk Assessment. In IEEE Aerospace Conference Proceedings, 1-8 March 2014, Big Sky, MT, USA IEEE Computer Society.10.1109/AERO.2014.6836222Search in Google Scholar
[8] Stout, K., and Stout, K. (2012). Pareto Analysis. In Quality Control in Automation, pp. 171–176, Berlin: Springer International Publishing.10.1007/978-1-4684-7499-2_13Search in Google Scholar
[9] Zeitler, G. (2010). Thermoplastic Polyurethanes for Instrument Panel Skins. In SAE Technical Paper Series (Vol. 1). SAE International. Published February 1, 1990 by SAE International in United States.10.4271/900730Search in Google Scholar
[10] Chamberlain, G. (1996). The ins and outs of automotive materials. Design News, 51(19), 95. ID 235217718.Search in Google Scholar
[11] Aleš, Z., Legát, V. FMEA, FMECA method. Presentation. Quality management systems, TF, Retrieved Jun 16, 2019, from https://slideplayer.cz/slide/2668242/ ČZU Praha.Search in Google Scholar
[12] Eichler T. (2016). Do not be afraid of FMEA. Procedure of PFMEA analysis. Retrieved January 10, 2016 from: kvalita-jednoduse.cz/fmeaSearch in Google Scholar
[13] Vaněček D. & Toušek, R. (2017) Supply chain management. 1 st ed. Faculty of Economics. South Bohemian University in České Budějovice.Search in Google Scholar
[14] Sabadka, D. Molnar, V. Fedorko, G. & Jachowicz, T. (2017). Optimization of production processes using the yamazumi method. Adv. in Scie. and Tech.-Res. J. 11(4), 175-182.10.12913/22998624/80921Search in Google Scholar
© 2019 J. Strohmandl and Z. Čujan, published by De Gruyter
This work is licensed under the Creative Commons Attribution 4.0 International License.
Articles in the same Issue
- Regular Article
- Exploring conditions and usefulness of UAVs in the BRAIN Massive Inspections Protocol
- A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
- Identification of geodetic risk factors occurring at the construction project preparation stage
- Multicriteria comparative analysis of pillars strengthening of the historic building
- Methods of habitat reports’ evaluation
- Effect of material and technological factors on the properties of cement-lime mortars and mortars with plasticizing admixture
- Management of Innovation Ecosystems Based on Six Sigma Business Scorecard
- On a Stochastic Regularization Technique for Ill-Conditioned Linear Systems
- Dynamic safety system for collaboration of operators and industrial robots
- Assessment of Decentralized Electricity Production from Hybrid Renewable Energy Sources for Sustainable Energy Development in Nigeria
- Seasonal evaluation of surface water quality at the Tamanduá stream watershed (Aparecida de Goiânia, Goiás, Brazil) using the Water Quality Index
- EFQM model implementation in a Portuguese Higher Education Institution
- Assessment of direct and indirect effects of building developments on the environment
- Accelerated Aging of WPCs Based on Polypropylene and Plywood Production Residues
- Analysis of the Cost of a Building’s Life Cycle in a Probabilistic Approach
- Implementation of Web Services for Data Integration to Improve Performance in The Processing Loan Approval
- Rehabilitation of buildings as an alternative to sustainability in Brazilian constructions
- Synthesis Conditions for LPV Controller with Input Covariance Constraints
- Procurement management in construction: study of Czech municipalities
- Contractor’s bid pricing strategy: a model with correlation among competitors’ prices
- Control of construction projects using the Earned Value Method - case study
- Model supporting decisions on renovation and modernization of public utility buildings
- Cements with calcareous fly ash as component of low clinker eco-self compacting concrete
- Failure Analysis of Super Hard End Mill HSS-Co
- Simulation model for resource-constrained construction project
- Getting efficient choices in buildings by using Genetic Algorithms: Assessment & validation
- Analysis of renewable energy use in single-family housing
- Modeling of the harmonization method for executing a multi-unit construction project
- Effect of foam glass granules fillers modification of lime-sand products on their microstructure
- Volume Optimization of Solid Waste Landfill Using Voronoi Diagram Geometry
- Analysis of occupational accidents in the construction industry with regards to selected time parameters
- Bill of quantities and quantity survey of construction works of renovated buildings - case study
- Cooperation of the PTFE sealing ring with the steel ball of the valve subjected to durability test
- Analytical model assessing the effect of increased traffic flow intensities on the road administration, maintenance and lifetime
- Quartz bentonite sandmix in sand-lime products
- The Issue of a Transport Mode Choice from the Perspective of Enterprise Logistics
- Analysis of workplace injuries in Slovakian state forestry enterprises
- Research into Customer Preferences of Potential Buyers of Simple Wood-based Houses for the Purpose of Using the Target Costing
- Proposal of the Inventory Management Automatic Identification System in the Manufacturing Enterprise Applying the Multi-criteria Analysis Methods
- Hyperboloid offset surface in the architecture and construction industry
- Analysis of the preparatory phase of a construction investment in the area covered by revitalization
- The selection of sealing technologies of the subsoil and hydrotechnical structures and quality assurance
- Impact of high temperature drying process on beech wood containing tension wood
- Prediction of Strength of Remixed Concrete by Application of Orthogonal Decomposition, Neural Analysis and Regression Analysis
- Modelling a production process using a Sankey diagram and Computerized Relative Allocation of Facilities Technique (CRAFT)
- The feasibility of using a low-cost depth camera for 3D scanning in mass customization
- Urban Water Infrastructure Asset Management Plan: Case Study
- Evaluation the effect of lime on the plastic and hardened properties of cement mortar and quantified using Vipulanandan model
- Uplift and Settlement Prediction Model of Marine Clay Soil e Integrated with Polyurethane Foam
- IoT Applications in Wind Energy Conversion Systems
- A new method for graph stream summarization based on both the structure and concepts
- “Zhores” — Petaflops supercomputer for data-driven modeling, machine learning and artificial intelligence installed in Skolkovo Institute of Science and Technology
- Economic Disposal Quantity of Leftovers kept in storage: a Monte Carlo simulation method
- Computer technology of the thermal stress state and fatigue life analysis of turbine engine exhaust support frames
- Statistical model used to assessment the sulphate resistance of mortars with fly ashes
- Application of organization goal-oriented requirement engineering (OGORE) methods in erp-based company business processes
- Influence of Sand Size on Mechanical Properties of Fiber Reinforced Polymer Concrete
- Architecture For Automation System Metrics Collection, Visualization and Data Engineering – HAMK Sheet Metal Center Building Automation Case Study
- Optimization of shape memory alloy braces for concentrically braced steel braced frames
- Topical Issue Modern Manufacturing Technologies
- Feasibility Study of Microneedle Fabrication from a thin Nitinol Wire Using a CW Single-Mode Fiber Laser
- Topical Issue: Progress in area of the flow machines and devices
- Analysis of the influence of a stator type modification on the performance of a pump with a hole impeller
- Investigations of drilled and multi-piped impellers cavitation performance
- The novel solution of ball valve with replaceable orifice. Numerical and field tests
- The flow deteriorations in course of the partial load operation of the middle specific speed Francis turbine
- Numerical analysis of temperature distribution in a brush seal with thermo-regulating bimetal elements
- A new solution of the semi-metallic gasket increasing tightness level
- Design and analysis of the flange-bolted joint with respect to required tightness and strength
- Special Issue: Actual trends in logistics and industrial engineering
- Intelligent programming of robotic flange production by means of CAM programming
- Static testing evaluation of pipe conveyor belt for different tensioning forces
- Design of clamping structure for material flow monitor of pipe conveyors
- Risk Minimisation in Integrated Supply Chains
- Use of simulation model for measurement of MilkRun system performance
- A simulation model for the need for intra-plant transport operation planning by AGV
- Operative production planning utilising quantitative forecasting and Monte Carlo simulations
- Monitoring bulk material pressure on bottom of storage using DEM
- Calibration of Transducers and of a Coil Compression Spring Constant on the Testing Equipment Simulating the Process of a Pallet Positioning in a Rack Cell
- Design of evaluation tool used to improve the production process
- Planning of Optimal Capacity for the Middle-Sized Storage Using a Mathematical Model
- Experimental assessment of the static stiffness of machine parts and structures by changing the magnitude of the hysteresis as a function of loading
- The evaluation of the production of the shaped part using the workshop programming method on the two-spindle multi-axis CTX alpha 500 lathe
- Numerical Modeling of p-v-T Rheological Equation Coefficients for Polypropylene with Variable Chalk Content
- Current options in the life cycle assessment of additive manufacturing products
- Ideal mathematical model of shock compression and shock expansion
- Use of simulation by modelling of conveyor belt contact forces
Articles in the same Issue
- Regular Article
- Exploring conditions and usefulness of UAVs in the BRAIN Massive Inspections Protocol
- A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
- Identification of geodetic risk factors occurring at the construction project preparation stage
- Multicriteria comparative analysis of pillars strengthening of the historic building
- Methods of habitat reports’ evaluation
- Effect of material and technological factors on the properties of cement-lime mortars and mortars with plasticizing admixture
- Management of Innovation Ecosystems Based on Six Sigma Business Scorecard
- On a Stochastic Regularization Technique for Ill-Conditioned Linear Systems
- Dynamic safety system for collaboration of operators and industrial robots
- Assessment of Decentralized Electricity Production from Hybrid Renewable Energy Sources for Sustainable Energy Development in Nigeria
- Seasonal evaluation of surface water quality at the Tamanduá stream watershed (Aparecida de Goiânia, Goiás, Brazil) using the Water Quality Index
- EFQM model implementation in a Portuguese Higher Education Institution
- Assessment of direct and indirect effects of building developments on the environment
- Accelerated Aging of WPCs Based on Polypropylene and Plywood Production Residues
- Analysis of the Cost of a Building’s Life Cycle in a Probabilistic Approach
- Implementation of Web Services for Data Integration to Improve Performance in The Processing Loan Approval
- Rehabilitation of buildings as an alternative to sustainability in Brazilian constructions
- Synthesis Conditions for LPV Controller with Input Covariance Constraints
- Procurement management in construction: study of Czech municipalities
- Contractor’s bid pricing strategy: a model with correlation among competitors’ prices
- Control of construction projects using the Earned Value Method - case study
- Model supporting decisions on renovation and modernization of public utility buildings
- Cements with calcareous fly ash as component of low clinker eco-self compacting concrete
- Failure Analysis of Super Hard End Mill HSS-Co
- Simulation model for resource-constrained construction project
- Getting efficient choices in buildings by using Genetic Algorithms: Assessment & validation
- Analysis of renewable energy use in single-family housing
- Modeling of the harmonization method for executing a multi-unit construction project
- Effect of foam glass granules fillers modification of lime-sand products on their microstructure
- Volume Optimization of Solid Waste Landfill Using Voronoi Diagram Geometry
- Analysis of occupational accidents in the construction industry with regards to selected time parameters
- Bill of quantities and quantity survey of construction works of renovated buildings - case study
- Cooperation of the PTFE sealing ring with the steel ball of the valve subjected to durability test
- Analytical model assessing the effect of increased traffic flow intensities on the road administration, maintenance and lifetime
- Quartz bentonite sandmix in sand-lime products
- The Issue of a Transport Mode Choice from the Perspective of Enterprise Logistics
- Analysis of workplace injuries in Slovakian state forestry enterprises
- Research into Customer Preferences of Potential Buyers of Simple Wood-based Houses for the Purpose of Using the Target Costing
- Proposal of the Inventory Management Automatic Identification System in the Manufacturing Enterprise Applying the Multi-criteria Analysis Methods
- Hyperboloid offset surface in the architecture and construction industry
- Analysis of the preparatory phase of a construction investment in the area covered by revitalization
- The selection of sealing technologies of the subsoil and hydrotechnical structures and quality assurance
- Impact of high temperature drying process on beech wood containing tension wood
- Prediction of Strength of Remixed Concrete by Application of Orthogonal Decomposition, Neural Analysis and Regression Analysis
- Modelling a production process using a Sankey diagram and Computerized Relative Allocation of Facilities Technique (CRAFT)
- The feasibility of using a low-cost depth camera for 3D scanning in mass customization
- Urban Water Infrastructure Asset Management Plan: Case Study
- Evaluation the effect of lime on the plastic and hardened properties of cement mortar and quantified using Vipulanandan model
- Uplift and Settlement Prediction Model of Marine Clay Soil e Integrated with Polyurethane Foam
- IoT Applications in Wind Energy Conversion Systems
- A new method for graph stream summarization based on both the structure and concepts
- “Zhores” — Petaflops supercomputer for data-driven modeling, machine learning and artificial intelligence installed in Skolkovo Institute of Science and Technology
- Economic Disposal Quantity of Leftovers kept in storage: a Monte Carlo simulation method
- Computer technology of the thermal stress state and fatigue life analysis of turbine engine exhaust support frames
- Statistical model used to assessment the sulphate resistance of mortars with fly ashes
- Application of organization goal-oriented requirement engineering (OGORE) methods in erp-based company business processes
- Influence of Sand Size on Mechanical Properties of Fiber Reinforced Polymer Concrete
- Architecture For Automation System Metrics Collection, Visualization and Data Engineering – HAMK Sheet Metal Center Building Automation Case Study
- Optimization of shape memory alloy braces for concentrically braced steel braced frames
- Topical Issue Modern Manufacturing Technologies
- Feasibility Study of Microneedle Fabrication from a thin Nitinol Wire Using a CW Single-Mode Fiber Laser
- Topical Issue: Progress in area of the flow machines and devices
- Analysis of the influence of a stator type modification on the performance of a pump with a hole impeller
- Investigations of drilled and multi-piped impellers cavitation performance
- The novel solution of ball valve with replaceable orifice. Numerical and field tests
- The flow deteriorations in course of the partial load operation of the middle specific speed Francis turbine
- Numerical analysis of temperature distribution in a brush seal with thermo-regulating bimetal elements
- A new solution of the semi-metallic gasket increasing tightness level
- Design and analysis of the flange-bolted joint with respect to required tightness and strength
- Special Issue: Actual trends in logistics and industrial engineering
- Intelligent programming of robotic flange production by means of CAM programming
- Static testing evaluation of pipe conveyor belt for different tensioning forces
- Design of clamping structure for material flow monitor of pipe conveyors
- Risk Minimisation in Integrated Supply Chains
- Use of simulation model for measurement of MilkRun system performance
- A simulation model for the need for intra-plant transport operation planning by AGV
- Operative production planning utilising quantitative forecasting and Monte Carlo simulations
- Monitoring bulk material pressure on bottom of storage using DEM
- Calibration of Transducers and of a Coil Compression Spring Constant on the Testing Equipment Simulating the Process of a Pallet Positioning in a Rack Cell
- Design of evaluation tool used to improve the production process
- Planning of Optimal Capacity for the Middle-Sized Storage Using a Mathematical Model
- Experimental assessment of the static stiffness of machine parts and structures by changing the magnitude of the hysteresis as a function of loading
- The evaluation of the production of the shaped part using the workshop programming method on the two-spindle multi-axis CTX alpha 500 lathe
- Numerical Modeling of p-v-T Rheological Equation Coefficients for Polypropylene with Variable Chalk Content
- Current options in the life cycle assessment of additive manufacturing products
- Ideal mathematical model of shock compression and shock expansion
- Use of simulation by modelling of conveyor belt contact forces