Abstract

In this paper authors conduct a case study analysis by implementing the use of UAVs in the data collection within the BRAIN framework for the failures diagnosis of facades. The main goal is to assess the conditions and usefulness of UAVs in the BRAIN protocol by analyzing the goodness of fit to the fundamental requirements that support this inspection methodology. This preliminary qualitative approach allows the authors to investigate the benefits and potential of this high performance technology as a complement or alternative tool to the initial method, which is based on visual inspections supported, as maximum, by high resolution digital camera images. For the study a sample of facades has been selected in Poland. A full equipped UAV has been collecting the images. Finally, full procedure, collected data and positive and negative issues has been assessed under the perspective of the requirements involved in a multiscale BRAIN inspection. Overall scoring conditions has been determined and, as a conclusion, it can be stated that the use of UAVs for technical inspections in a population based predictive approach is, and even more it will be in the future, an interesting complementary tool for the data collection.

1 Introduction

Lot of research has been developed exploring the use of digital images acquired through Unmanned Aerial Vehicles (UAVs) monitoring the technical condition of real estate and inventories of technical infrastructure. Within this perspective, Banaszek et al. (2017) [1] have proved the new opportunities that the use of UAVs offers in the area of technical inspection of buildings and constructions. New UAV data acquisition technologies offer new opportunities in this field. UAV case studies to monitor the technical condition of objects of different sizes (residential building, dam, retaining wall at the runway) have shown that high resolution image quality enables visual identification of cracks of 0.3 mm at approx. 10 m from the recorded surface [2, 3]. Recently, Serrat et al. (2018) [4] have described the benefits and disadvantages of this high performance technology and the authors have concluded that the use of UAVs for technical inspections of the facades in a building stock is an interesting alternative to the traditional visual inspections. In short, benefits come from the accuracy of the data, low operating costs, fast data acquisition time and variability reduction among inspectors.

The BRAIN (Building Research Analysis and Information Network) methodology was initially introduced by Serrat and Gibert (2011) [5] and lately developed in [6, 7]. BRAIN proposes, in a collaborative network of urban laboratories, a follow-up across time of the technical condition of the facades in a building stock, aiming to infer on the time to the ocurrence of potential failures or lesions in the existing facades. One of the most relevant issues in the methodology is the data colection procedure. Conventional inspections are primarily based on visual research methods. However, the data collection must be as exhaustive and accurate as possible, and a massive and periodic inspection should be efficient in terms of data quality versus time and cost resources.

In the present paper authors assess the conditions and usefulness of UAVs in the BRAIN protocol by analyzing the goodness of fit to the fundamental requirements that support the BRAIN methodology. On the basis of the same case study in [4] each one of the requirements will be discussed and compared with the current traditional criteria.

The paper is organized as follows. In Section 2the Polish case study is discribed including characteristics of the sample under study and the flights. BRAIN inspection methodology, as well as requirements involved in it, are introduced in Section 3. Finally, a results and discussion section will end the paper with the resulting conclusions.

2 The case study

As mentioned, Serrat et al. (2018) [4] explored the emerging possibilities derived from capturing the information on the technical condition of the facades through UAV devices in the BRAIN context. In this paper we will consider the same dataset of images that they obtained in their experiment. To make the text more understandable and self-contained, we will reproduce in the next subsections the basic characteristics of the experiment.

2.1 Facades under inspection

The sample under study consists of six facades in Poland (four units in Warsaw and two units in Olsztyn). The sample was chosen based on criteria of morphology of the facade (i.e. flat facades, facades with balconies, facades with tribunes, and facades with balconies and tribunes) and deterioration level of the facade (i.e. no damaged, slightly damaged, medium damaged and heavy damaged). Figure 1 illustrates a general view as well as four particular images, of one of the units of the facades under inspection. More details of the sample can be found in [4].

Figure 1 General view and four specific details of one of the facades in the sample.
Figure 1

General view and four specific details of one of the facades in the sample.

2.2 Technical details of the UAV

The experiment uses the DJI Inspire One lightweight quadcopter with the following specifications: weight: 2,935g, vertical GPS accuracy: 0.5 m (accuracy determination), horizontal GPS accuracy: 2.5 m (accuracy of X, Y coordinates), climb speed: 5 m/s, max. drop speed: 4 m/s, max. cruising speed: 22 m/s (ATTI mode, no wind), max. flight height: 4,500 mASL (Above Sea Level), max. wind force: 10 m/s, flight time: 18 minutes, operating temperature: −10C to 40C, size: 438×451×301 mm. To obtain digital images the UAV was equipped with a Digital camera (RGB sensor) with the following specifications: 12 Mpix resolution (4,000×3,000 pixels), physical size 6.170 mm × 4.628 mm, focal length: 3.55 mm.

Using UAV for commercial and scientific purposes requires in Poland a qualification certificate of UAVO unmanned aircraft operator. This requires Art. 95 of the Law of July 3, 2002, aviation law, and the detailed rules for obtaining the certificate are contained in the Regulation of the Minister of Transport, Construction and Maritime Economy of 3 June 2013 on certificates of qualification. Basic Visual Sight of Sight operation (VLOS) deals with the operation of UAV sightings. It is received by the operator after the completion of theoretical and practical training and passes the state examination, which is conducted by an examiner appointed by the Polish Civil Aviation Office.

Images were collected in three different days. Temperature, wind, humidity, precipitation and sun conditions were good enough for a successful data collection. Duration times of the flights per facade rang from 5 minutes to 29 minutes.

3 BRAIN inspection protocol

The inspection protocol is the practical part of the methodology to be applied in each urban laboratory. The protocol includes an inspection document that consists of two parts. Part a) allows the collection of field data, cartographic data, cadastral data as well as plot/building/facade data and architectural characteristics. Part b) covers the collecting of existing elements and materials and the state of any damage at the time of inspection. Extended details of the BRAIN methodology, as a predictive system, can be found in [6, 7].

3.1 Inspection methodology

The methodology focuses on a massive prospecting campaign of the facades at a multiscale level. Indeed, it concentrates on the concept of the urban laboratory that collects the envelope of the buildings and constitutes the urban front. The durability of each part of the facade and each one of the elements of the facade is assessed based on the facade characteristics, construction materials, injuries, extent and severity.

For inspections of facades, it was necessary to define a tool (assessment document) that allows to show the state of each element that composes the facade and to determine, in accurate manner, the magnitude and degree of severity of the lesion, in order to estimate a predictive control over it. In addition, it is necessary to achieve that the inspection is fast and with a minimum cost, since it will be applicable to a large stock of buildings. In the same way, it is necessary that the data extracted from the inspection can be managed and processed to perform studies on durability.

3.2 Fundamental requirements

The BRAIN methodology from its origins has been based on a series of general and specific requirements, which, duly weighted by a group of experts, drove the strategic guidelines to follow in the realization of inspections of facades on the urban front in a massive way [8]. So, the final protocol comes from a weighted criterion that combines issues like identifiability of the facades, classification of the facades, methodological issues themselves, resources needed, data collection, and analytical skills for the decision-making. Table 1 shows the general and specific requirements as well as the corresponding relative and overall weights. The interpretation and exact meaning of each field and each criterion is defined below.

Table 1

Weighted criteria and indicators for the inspection methodology.

GeneralSpecificRelative WeightOverall Weight
Identification 17.5%Descriptive36.25%6.34%
Methodical28.75%5.03%
Universal35.00%6.13%
Classification 16.25%Sequential36.25%5.89%
Detailed35.00%5.69%
Ordered28.75%4.67%
Methodology 22.5%Robust35.00%7.88%
Standard30.00%6.75%
Quick35.00%7.87%
Resources 11.25%Technological25.00%2.81%
Human35.00%3.94%
Time40.00%4.50%
Data 21.25%Reliable42.50%9.03%
Quantifiable31.25%6.64%
Verifiable26.25%5.58%
Analytical skills 11.25%Multifunctional26.25%2.95%
Processable41.25%4.64%
Longitudinal32.50%3.66%

Identification

The identification must allow the description of the general characteristics of the facade, being able to record the most relevant information (morphology, cadastral data, state of conservation, ...), besides being methodical, so that the inspection follows logical inspection guidelines going from the most general details to the most particular, and as universal as possible to allow the inspection of any type of facade.

Classification

The classification of the information must sequentially respond to the constructive characteristics of the element, being as detailed as possible, specifying every minimum detail that may be relevant to the study, as well as ordered, for showing coherence within each area and not generate differences of interpretation.

Methodology

The methodology is the process to be used to obtain the information. Should be robust, presenting clearly the contents and avoiding differences in interpretation for the same situation; standard, using the same codes of identification for the same record; and fast, to minimize inspection times in the data collection.

Resources

Technological and human resources, and the data collection time that is required to perform the inspection should reduce the associated costs. For this you must have technological tools that facilitate the work in the field and determine the degree of specialization of the personnel carrying out the inspections, optimizing and adjusting the time of data collection, dump of information and extraction of results.

Quality of data

The quality of the data collected must provide credibility, therefore they must be reliable; they must also be quantifiable, allowing them to be processed analytically to extract numerical results; and testable, allowing to check the goodness of the data against the objective reality over time.

Analysis

It is important that the data extracted from the inspection have the capacity of being managed, processed and analyzed later, therefore, they must be multifunctional, to be used in different types of analysis, both qualitative and quantitative processable, being able to be systematically submitted to operations scheduled; and longitudinal, allowing a comparison over time in order to observe its evolution.

First column in Table 1 shows the percentages of each of the requirements, among which we can point out that Methodology (22.50%) and Data (21.25%) are those that require greater attention. Looking at the forth column we can see the overall impact of each indicator. As a consequence, all the efforts in the design of the inspection methodology must be focused on collecting reliable (9.03%) and quantifiable (6.64%) data, using a robust (7.88%), quick (7.87%) and standard (6.75%) methodology, and allowing a descriptive (6.34%) but universal (6.13%) identification of the facades.

4 Results and discussion

Once the images were collected, the data were processed and analyzed with the aim of filling in the information in the BRAIN datasheet. This procedure gave the authors the opportunity of assessing each one of the general and specific requeriments above mentioned in Table 1 in order to compare the benefits of the UAV technology data collection versus traditional visual inspections and the support given by professional photo cameras. As a first step, given a specific requeriment the three inspection methodologies were ranked from 1 to 3 (1 = worst, 2 = medium, 3 = best) according to the goodness of fit to, or fulfillment of, the goals of the requeriment. This strategy allowed us a preliminary general comparison in absolute terms. As a second step, the scores in step one were weighted taking into account the relative weight of each one of the requeriments displayed in Table 1. Cumulative absolute and weighted scores are shown in Table 2 and discussed in what follows.

Table 2

Scored (absolute / weighted) values for the specific requeriments according to visual, photo camera and UAV inspection methodologies.

GENERAL REQUERIMENTSPECIFIC REQUERIMENTINSPECTION METHOD
FIELDCRITERIONVISUALPHOTO CAMERAUAV
IDENTIFICATIONDescriptive3 / 19.021 / 6.342 / 12.68
Methodic3 / 15.091 / 5.032 / 10.06
Universal3 / 18.391 / 6.132 / 12.26
CLASSIFICATIONSequential3 / 17.671 / 5.892 / 11.78
Datailed2 / 11.381 / 5.693 / 17.07
Ordered3 / 14.011 / 4.672 / 9.34
METHODOLOGYRobust2 / 15.761 / 7.883 / 23.64
Standard3 / 20.251 / 6.752 / 13.5
Quick3 / 23.611 / 7.872 / 15.74
RESOURCESTechnological3 / 8.432 / 5.621 / 2.81
Human3 / 11.822 / 7.881 / 3.94
Time3 / 13.52 / 91 / 4.5
DATA QUALITYReliable2 / 18.061 / 9.033 / 27.09
Quantifiable2 / 13.281 / 6.643 / 19.92
Verifiable1 / 5.582 / 11.163 / 16.74
ANALYSISMultifunctional2 / 5.91 / 2.953 / 8.85
Processable2 / 9.281 / 4.643 / 13.92
Longitudinal1 / 3.662 / 7.323 / 10.98
Overall44 / 244.6923 / 120.4941 / 234.82

The factors that have been taken into consideration start from a first identification requirement that allows describing the general characteristics of the facades through their morphology, cadastral data and conservation status in order to arrive at a methodical and universal result. The assessment reached in this requirement has resulted in traditional visual inspections providing greater performance, although it is expected that UAVs flights with adjustments in the catchment methodology may achieve similar or better values.

The classification requirement allows to establish, in a sequential way, the construction characteristics with the maximum detail in an ordered manner throughout the inspection process, so as not to generate disparity of criteria in the data collection. Scorings are favorable to the UAV techniques in the level of detail criterion because they allow a better visualization of hidden areas to the human eye.

In the methodological field, issues like robustness in the interpretation of the observed data, standardization in the identification of the records and speed to optimize the inspection times must be considered. It is important to notice that the improvement factor comes from the robustness since the image allows verifications without the environmental pressure at the time of inspecting in situ.

When considering the resources that are necessary for the realization of an inspection, the hypothesis of the independence of the inspector and his own potential has been used. In this sense, aspects such as technology, human resources and time used for inspection are favorable to traditional inspections because in the case of UAV requires the involvement of other type of specialists in the management of the equipment and a greater time consuming resource.

UAV techniques are relevant and stands out from its competitors in two significant fields: data quality and analysis. It is quite straightforward and obvious that requirements like reliability and quantification of the collected information are better fulfilled and tested in a UAV approach. It is important to notice the UAV benefits from the analytical power perspective. As highlighted in [4], the most positive contribution of UAV data acquisition to the BRAIN platform is the reduction of the between and within variability among inspectors. This is one important issue in order to obtain more accurate confidence intervals in the prediction of the durability as a supporting tool for the decision making strategy across time.

As a summary, based on the data from this case study and from a qualitative approach, traditional inspections are nowdays slightly (4.2%) better scored than the UAV alternative. However, UAV scenario is quickly changing over time and the alternative is quite promising. On one hand, the advantage in the data quality and analysis requirements are not questionable at all. On the other hand, technological progress will move this UAV resource to a more standard, better well-known and cheaper technology. Within this perspective UAV-based inspections can really improve their compliance with the standards of the requirements for a large-scale inspection protocol. This is the reason why Society can not rule out the great potential that this form of inspection can offer in the near future.

Acknowledgement

This research has been partially supported by grants MTM2015-64465-C2-1-R (MINECO / FEDER) from the Ministerio de Economía y Competitividad (Spain) and 2017 SGR 622 from the Departament d’Economia i Coneixement de la Generalitat de Catalunya. Authors are grateful to the Laboratory of Photogrammetry and Remote Sensing (LFiT) Dron House S. A., Warsaw (Poland) its contribution in the technical part of using UAV technologies, as well as, to members of the IEMAE, LABEDI and GRASS-GRBIO groups their valuable comments and suggestions in the development of the work.

References

[1] Banaszek A., Banaszek S. and Cellmer A., Possibilities of Use of UAVS for Technical Inspection of Buildings and Constructions, IOP Conference Series: Earth and Environment Science, 2017, 95, 032001, 1-610.1088/1755-1315/95/3/032001Suche in Google Scholar

[2] Eschmann C., Kuo C.-M., Kuo C.-H. and Boller C., Unmanned Aircraft Systems for Remote Building Inspection and Monitoring, Proceedings of the 6th European Workshop on Structural Health Monitoring, 2012, Th.2.B.1,1-810.5194/isprsarchives-XL-1-W2-125-2013Suche in Google Scholar

[3] Hallermann N., Morgenthal G. and Rodehorst V., Unmanned Aerial Systems (UAS) – Case Studies of Vision Based Monitoring of Ageing Structures, Proceedings of the International Symposium Non-Destructive Testing in Civil Engineering (NDT-CE), Berlin, Germany, 2015Suche in Google Scholar

[4] Serrat C., Banaszek A., Cellmer A. and Gibert V., Use of UAVs for Technical Inspection of Buildings Within the BRAIN Massive Inspection Platform, IOP Conference Series: Earth and Environmental Science, in pressSuche in Google Scholar

[5] Serrat C. and Gibert, V., Survival analysis methodology for service live prediction and building maintenance, Proceedings of the 12th International Conference on Durability of Building Materials and Components, Porto, Portugal, 2011, vol. II, 599-606Suche in Google Scholar

[6] Gibert V., A multiscale predictive system for the degradation of the built urban front, PhD Thesis, Universitat Politècnica de Catalunya-BarcelonaTECH, Barcelona, Spain, 2016, (in Spanish)Suche in Google Scholar

[7] Serrat C., Gibert V., Casas J.R. and Rapinski J., BRAIN: Building Research Analysis and Information Network, Proceedings of the XIV International Conference on Durability of Building Materials and Components, Ghent, Belgium, 2017, 325, 1-11Suche in Google Scholar

[8] Gibert V., Serrat C. and Casas J.R., Determination of criteria for the exploration and for obtaining indicators in evolutional analysis of degradation in urban facades, Proceedings of the 13th International Conference on Durability of Building Materials and Components, Sao Paulo, Brasil, 2014, 656-663Suche in Google Scholar

Received: 2018-04-26
Accepted: 2018-10-04
Published Online: 2019-01-31

© 2019 C. Serrat et al., published by De Gruyter

This work is licensed under the Creative Commons Attribution 4.0 International License.

Artikel in diesem Heft

  1. Regular Article
  2. Exploring conditions and usefulness of UAVs in the BRAIN Massive Inspections Protocol
  3. A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
  4. Identification of geodetic risk factors occurring at the construction project preparation stage
  5. Multicriteria comparative analysis of pillars strengthening of the historic building
  6. Methods of habitat reports’ evaluation
  7. Effect of material and technological factors on the properties of cement-lime mortars and mortars with plasticizing admixture
  8. Management of Innovation Ecosystems Based on Six Sigma Business Scorecard
  9. On a Stochastic Regularization Technique for Ill-Conditioned Linear Systems
  10. Dynamic safety system for collaboration of operators and industrial robots
  11. Assessment of Decentralized Electricity Production from Hybrid Renewable Energy Sources for Sustainable Energy Development in Nigeria
  12. Seasonal evaluation of surface water quality at the Tamanduá stream watershed (Aparecida de Goiânia, Goiás, Brazil) using the Water Quality Index
  13. EFQM model implementation in a Portuguese Higher Education Institution
  14. Assessment of direct and indirect effects of building developments on the environment
  15. Accelerated Aging of WPCs Based on Polypropylene and Plywood Production Residues
  16. Analysis of the Cost of a Building’s Life Cycle in a Probabilistic Approach
  17. Implementation of Web Services for Data Integration to Improve Performance in The Processing Loan Approval
  18. Rehabilitation of buildings as an alternative to sustainability in Brazilian constructions
  19. Synthesis Conditions for LPV Controller with Input Covariance Constraints
  20. Procurement management in construction: study of Czech municipalities
  21. Contractor’s bid pricing strategy: a model with correlation among competitors’ prices
  22. Control of construction projects using the Earned Value Method - case study
  23. Model supporting decisions on renovation and modernization of public utility buildings
  24. Cements with calcareous fly ash as component of low clinker eco-self compacting concrete
  25. Failure Analysis of Super Hard End Mill HSS-Co
  26. Simulation model for resource-constrained construction project
  27. Getting efficient choices in buildings by using Genetic Algorithms: Assessment & validation
  28. Analysis of renewable energy use in single-family housing
  29. Modeling of the harmonization method for executing a multi-unit construction project
  30. Effect of foam glass granules fillers modification of lime-sand products on their microstructure
  31. Volume Optimization of Solid Waste Landfill Using Voronoi Diagram Geometry
  32. Analysis of occupational accidents in the construction industry with regards to selected time parameters
  33. Bill of quantities and quantity survey of construction works of renovated buildings - case study
  34. Cooperation of the PTFE sealing ring with the steel ball of the valve subjected to durability test
  35. Analytical model assessing the effect of increased traffic flow intensities on the road administration, maintenance and lifetime
  36. Quartz bentonite sandmix in sand-lime products
  37. The Issue of a Transport Mode Choice from the Perspective of Enterprise Logistics
  38. Analysis of workplace injuries in Slovakian state forestry enterprises
  39. Research into Customer Preferences of Potential Buyers of Simple Wood-based Houses for the Purpose of Using the Target Costing
  40. Proposal of the Inventory Management Automatic Identification System in the Manufacturing Enterprise Applying the Multi-criteria Analysis Methods
  41. Hyperboloid offset surface in the architecture and construction industry
  42. Analysis of the preparatory phase of a construction investment in the area covered by revitalization
  43. The selection of sealing technologies of the subsoil and hydrotechnical structures and quality assurance
  44. Impact of high temperature drying process on beech wood containing tension wood
  45. Prediction of Strength of Remixed Concrete by Application of Orthogonal Decomposition, Neural Analysis and Regression Analysis
  46. Modelling a production process using a Sankey diagram and Computerized Relative Allocation of Facilities Technique (CRAFT)
  47. The feasibility of using a low-cost depth camera for 3D scanning in mass customization
  48. Urban Water Infrastructure Asset Management Plan: Case Study
  49. Evaluation the effect of lime on the plastic and hardened properties of cement mortar and quantified using Vipulanandan model
  50. Uplift and Settlement Prediction Model of Marine Clay Soil e Integrated with Polyurethane Foam
  51. IoT Applications in Wind Energy Conversion Systems
  52. A new method for graph stream summarization based on both the structure and concepts
  53. “Zhores” — Petaflops supercomputer for data-driven modeling, machine learning and artificial intelligence installed in Skolkovo Institute of Science and Technology
  54. Economic Disposal Quantity of Leftovers kept in storage: a Monte Carlo simulation method
  55. Computer technology of the thermal stress state and fatigue life analysis of turbine engine exhaust support frames
  56. Statistical model used to assessment the sulphate resistance of mortars with fly ashes
  57. Application of organization goal-oriented requirement engineering (OGORE) methods in erp-based company business processes
  58. Influence of Sand Size on Mechanical Properties of Fiber Reinforced Polymer Concrete
  59. Architecture For Automation System Metrics Collection, Visualization and Data Engineering – HAMK Sheet Metal Center Building Automation Case Study
  60. Optimization of shape memory alloy braces for concentrically braced steel braced frames
  61. Topical Issue Modern Manufacturing Technologies
  62. Feasibility Study of Microneedle Fabrication from a thin Nitinol Wire Using a CW Single-Mode Fiber Laser
  63. Topical Issue: Progress in area of the flow machines and devices
  64. Analysis of the influence of a stator type modification on the performance of a pump with a hole impeller
  65. Investigations of drilled and multi-piped impellers cavitation performance
  66. The novel solution of ball valve with replaceable orifice. Numerical and field tests
  67. The flow deteriorations in course of the partial load operation of the middle specific speed Francis turbine
  68. Numerical analysis of temperature distribution in a brush seal with thermo-regulating bimetal elements
  69. A new solution of the semi-metallic gasket increasing tightness level
  70. Design and analysis of the flange-bolted joint with respect to required tightness and strength
  71. Special Issue: Actual trends in logistics and industrial engineering
  72. Intelligent programming of robotic flange production by means of CAM programming
  73. Static testing evaluation of pipe conveyor belt for different tensioning forces
  74. Design of clamping structure for material flow monitor of pipe conveyors
  75. Risk Minimisation in Integrated Supply Chains
  76. Use of simulation model for measurement of MilkRun system performance
  77. A simulation model for the need for intra-plant transport operation planning by AGV
  78. Operative production planning utilising quantitative forecasting and Monte Carlo simulations
  79. Monitoring bulk material pressure on bottom of storage using DEM
  80. Calibration of Transducers and of a Coil Compression Spring Constant on the Testing Equipment Simulating the Process of a Pallet Positioning in a Rack Cell
  81. Design of evaluation tool used to improve the production process
  82. Planning of Optimal Capacity for the Middle-Sized Storage Using a Mathematical Model
  83. Experimental assessment of the static stiffness of machine parts and structures by changing the magnitude of the hysteresis as a function of loading
  84. The evaluation of the production of the shaped part using the workshop programming method on the two-spindle multi-axis CTX alpha 500 lathe
  85. Numerical Modeling of p-v-T Rheological Equation Coefficients for Polypropylene with Variable Chalk Content
  86. Current options in the life cycle assessment of additive manufacturing products
  87. Ideal mathematical model of shock compression and shock expansion
  88. Use of simulation by modelling of conveyor belt contact forces
Heruntergeladen am 16.9.2025 von https://www.degruyterbrill.com/document/doi/10.1515/eng-2019-0004/html
Button zum nach oben scrollen