Abstract

Multi-objective scheduling problems are inherently complex due to the need to balance competing objectives, such as minimizing the total weighted completion time, reducing the number of delayed jobs, and minimizing the maximum weighted delay. To address these challenges, this article introduces the meerkat clan algorithm (MCA), inspired by the dynamic, cooperative, and adaptive behaviors of meerkats, which enhances the exploration and exploitation of solution spaces. The MCA is further integrated with the traditional branch-and-bound (BAB) method, utilizing it as an upper bound to significantly improve the accuracy and efficiency of the solutions. Comprehensive computational experiments were conducted to evaluate the MCA’s performance against state-of-the-art algorithms, including the bald eagle search optimization algorithm (BESOA) and the standalone BAB method. The MCA demonstrated superior scalability and efficiency, effectively solving problems involving up to n = 30,000 jobs, whereas the BESOA was limited to handling instances with n = 1,000 jobs. Additionally, the integration of MCA with the BAB method achieved exceptional precision and efficiency for smaller problem instances, handling up to n = 13 jobs effectively. The results underscore the MCA algorithm’s potential as a robust solution for multi-objective scheduling problems, combining speed and accuracy to outperform traditional methods. Moreover, the hybrid approach of integrating MCA with BAB provides a flexible and versatile framework capable of addressing a wide range of scheduling scenarios, from small-scale to large-scale applications. These findings position the MCA as a transformative tool for solving complex scheduling problems in both theoretical and practical domains.

1 Introduction

Scheduling is a critical decision-making instrument in numerous applications such as industry, engineering, and commerce; their goal is to reduce costs or improve profitability, performance, and efficiency [1]. For the manufacturing and service sectors, it is used to reduce or enhance the costs and benefits of industrial production so that companies are competitive [2]. Furthermore, scheduling entails assigning machines to jobs to complete all tasks within the specified limits. Finding the most efficient sequence for executing these jobs on each machine is necessary to minimize the objective function. The primary objective is to optimize allocating one or more resources to activities across a period. Single-machine scheduling is a well-researched scheduling variant because it can divide complex machine environments into smaller subproblems [3].

Multi-objective single-machine scheduling problems are crucial because they reflect real-world scenarios where decision-makers must balance various performance metrics to achieve optimal outcomes [4]. In addition, they extend the classic problems by incorporating multiple, often conflicting, objectives. This helps improve operational efficiency and meet diverse stakeholder requirements, making it a vital area of study [5,6]. Most studies on scheduling theory assume that order processing takes the same amount of time over the entire planning horizon. While traditional optimization methods can be powerful tools for solving well-defined scheduling problems, their application to multi-objective single-machine scheduling problems often faces significant challenges due to the complexity of handling multiple objectives, computational and scalability issues, and the need for robust and diverse solutions. These challenges usually necessitate specialized multi-objective optimization techniques, metaheuristic algorithms, or hybrid approaches to effectively address the complexities of multi-objective scheduling problems [7,8]. Although metaheuristic algorithms have successfully solved challenging real-world MSP problems, a universally applicable algorithm cannot solve every problem involving the no-free-lunch theorem [9].

The meerkat clan algorithm (MCA) employs several specific strategies to be effective. These strategies are designed to find near-optimal solutions by leveraging the social behavior of meerkats and balancing exploration and exploitation [10,11]. Hence, the MCA was used to solve the new multi-objective mathematical model for single-machine scheduling problems. Therefore, this article made several contributions that can be summarized as follows:

  • Proposed multiple-objective model for minimizing the total weighted discounted completion time h = 1 m w h ( 1 e α C h ) , the number of tardy jobs h = 1 m U h , and the maximum weighted tardiness T max w . for a single machine scheduling problem.

  • For the first time, the MCA was introduced to solve the multi-objective model for the single-machine scheduling problem. The results were compared with the bald eagle search because it is a practical method for solving non-deterministic polynomial (NP)-hard and complex problems. bald eagle search optimization algorithm (BESOA) is a practical method for solving NP-hard and complex problems [12,13].

  • Enhanced the branch-and-bound (BAB) method by utilizing the MCA to improve the upper-bound (UP) estimation. This modification allows for more effective search space pruning, leading to a more efficient solution.

The remainder of this article is organized as follows: Section 2 provides the related works of the proposed study. Section 3 presents the methodology of the mathematical formulation of the problem. Sections 4 and 5 present metaheuristic algorithms (MCA and BESOA). Section 6 provides the exact method (branch and bound). Computational study and results are presented in Section 7. Finally, conclusions and suggestions for future work are given in Section 8.

2 Literature review

Most previous studies on scheduling have focused on a single method of measuring performance [14]. Several researchers have extensively studied and documented as follows.

Al-Zuwaini and Janam studied the problem of 1 / r j / j = 1 n F j + E max + j = 1 n U j using the BAB method and some dominance rules to solve the problem [15]. Al-Zuwanini and Khraibet considered the BAB method to solve the problem of 1 j = 1 n w j ( 1 e r c j ) + L max h [16]. Abbas used the BAB method to solve the problem 1 / j = 1 n ( U j + C j + T j + T max ) for n 20 [17]. Ibrahim et al. suggested 1 / j = 1 n ( C j + T j + E j + V j + U j ) problem and then used the BAB method to acquire the most efficient solution for this problem for n 17 [18]. Ahmed and Ali used the BAB method to solve the problem ( 1 C j + R L + T max ) [19]. Neamah et al. studied two problems 1 / / j = 1 n ( C j , E j , T max ) and 1 / / j = 1 n ( C j + E j ) + T max ) and then solved these problems by the BAB method up to n = 19 to n = 50 jobs, respectively, in a standard time frame [20]. Several researchers have extensively studied and documented [21,22,23,24,25,26].

Single machine scheduling problems have become increasingly sophisticated and NP-hard during the last few decades. Therefore, metaheuristic algorithms are proposed to obtain optimal or near-optimal solutions for the problem under consideration. Zlobinsky and Cheng used simulated annealing to solve the problem of minimizing weighted earliness and tardiness [27]. Jiaji et al. considered particle swarm optimization and Tabu search to minimize the weighted number of tardiest [28]. Ali and Ahmed used the Bee algorithm and particle swarm optimization to solve the problem 1 C j + R L + T max [29]. Moharam et al. introduced a chimp optimization algorithm to minimize the tardy/lost (TL) penalties [30]. Antonio and Fernandez studied a single-machine scheduling problem, where the objective is minimum total tardiness using the Harmony search [31]. Wu and Zheng used the Tabu search to find a near-optimum solution for minimizing the makespan [32]. Moreover, we can see that some researchers are interested in metaheuristic algorithms [6,33,34,35].

3 Methodology

3.1 The mathematical model

In this section, the multi-objective model of MSP, with m jobs on a single machine, was examined that is consistently accessible and capable of performing them.

3.1.1 Notations

Some notations utilized in the formulation of the multi-objective model for MSP were presented as follows:

  1. N = { 1 , 2 , 3 , , m } ;

  2. σ = set of all schedules;

  3. p h = processing time for job h, where h = 2, 3, …, n;

  4. w h = weight of job h;

  5. d h = due date of job h;

  6. C h = completion time of job h;

  7. α = discount rate;

  8. T max = maximum tardiness;

  9. T max w = maximum weighted tardine;

  10. MOF = multiple objective’s function;

  11. BAB = branch and bounded;

  12. MCA = Meerkat clan algorithm;

  13. MSP = machine scheduling problem;

  14. UB = upper bound;

  15. LB = lower bound;

  16. WDSPT = weighted discounted shortest processing time;

  17. MA = Moor algorithm;

  18. LA = Lawler algorithm;

  19. EDD = earliest due date;

  20. BESOA = bald eagle search optimization algorithm.

3.1.2 Objective function and constraint

In the present study, three objective functions (minimize the total weighted discounted completion time h = 1 m w h ( 1 e α C h ) , the number of tardy jobs h = 1 m U h , and the maximum weighted tardiness T max w ( 1 / / h = 1 m ( w h ( 1 e α C h ) + U h ) + T max w ) ) were solved at the same time. The main problem is shown by TA, and it can be in the following way:

(1) TA = min σ S { M ( σ ) } = min σ S h = 1 m ( w h ( 1 e α c h ) + U h ) + T max w ,

s.t.

(2) C ( h ) p σ ( h ) C ( h ) = C h 1 + p σ ( h ) O < α < 1 U ( h ) = 1 if C ( h ) > d σ ( h ) 0 otherwise L ( h ) = C ( h ) d ( h ) T ( h ) max { C ( h ) d ( h ) , 0 } w σ ( h ) > 0 , d σ ( h ) > 0 , E σ ( h ) 0 , T ( h ) 0 p σ ( h ) > 0 h from 1 to m .

4 Meerkat clan algorithm

The MCA is a metaheuristic algorithm that draws inspiration from the food-finding behavior of meerkats in the desert that was proposed by Sadiq et al. [36]. This algorithm uses efficient methods to address the optimization problem and obtain the optimal solution. Meerkats are social animals that live in groups of several; each group has an area that inhabits states with 5–30 individuals. As amicable creatures, they collaborate on lavatory duties and parental supervision. Every group has a dominant alpha female and a commanding alpha male who exerts a strong influence. Every crowd has a territory; they occasionally relocate when food is scarce or when a more dominant group displaces them. It is based on three fundamental components of social behavior. The initial social behavior of the meerkat clan involves selecting one or more individuals to act as guards or observers while others are hunting or playing to alert them in the event of any dangerous situations [37]. In addition, the meerkat follows a different route every day and leaves the area they visit for at least a week to give the area a chance to replenish its food supply. The meerkat must balance care and hunting better [38,39].

In multi-objective single-machine scheduling problems, the objectives of minimizing total weighted discounted completion time, minimizing the number of tardy jobs, and minimizing maximum weighted tardiness often interact in complex ways. The MCA effectively balances these objectives. MCA operates within a multi-objective optimization framework aiming to approximate the Pareto front. The Pareto front represents a set of non-dominated solutions where no objective can be improved without worsening another. MCA searches for diverse solutions along this front, allowing decision-makers to choose the best trade-offs based on their preferences. In addition, MCA divides the solution space into different clans, each focusing on various regions and aspects of the problem. This diversity allows the algorithm to explore different trade-offs through the objective functions. After that, each clan is guided by a leader who helps refine the solutions within that clan. This process helps balance the trade-offs between objectives by focusing on different aspects of the solution space. MCA evaluates solutions based on a combination of objectives. The fitness of a solution is determined by how well it balances the trade-offs between the objective functions. Then, MCA employs mechanisms to maintain diversity among the solutions in the population. This prevents the algorithm from converging too quickly on a suboptimal region of the solution space and ensures that various trade-offs are explored. This helps in finding solutions that offer a good balance between the different objectives.

The following steps of this study show how the MCA solves the single-machine scheduling problems:

Step 1: Problem Definition: The jobs with processing times, deadlines, etc.

Step 2: Generate an initial population of meerkats (solutions).

Step 3: Calculate each solution’s objective functions (fitness evaluation) (e.g., completion time, lateness).

Step 4: Meerkats update their positions (schedules) based on the best solutions they find by the Exploration and Exploitation

Step 5: Stopping Criterion: The algorithm stops after a predefined number of iterations or if the solutions stabilize.

5 Bald eagle search optimization algorithm

In 2020, the BESOA was introduced as a novel metaheuristic optimization method by Alsattar et al. [40]. It draws inspiration from the hunting behavior exhibited by the bald eagle. Many researchers studied and written about the BESOA algorithm including [41,42,43,44,45,46].

The bald eagle inhabits expansive, open spaces with abundant prey and ancient trees for nesting. Their keen vision allows them to locate prey from considerable distances, and they are capable of seeing in both directions at once. This condor’s prey–prey behavior is simulated by the BESOA algorithm, which divides the process into three stages: selection, search, and soaring. During the selecting phase, the eagle selects the area containing the most significant number of preys. During the searching phase, it searches for prey within the designated area.

The following bald eagle search algorithm to solve a mathematical model for a single machine scheduling problem is as follows:

Step 1: Randomly generate the first population.

Step 2: Determine every node’s fitness function ( min σ S { h = 1 m ( w h ( 1 e α c h ) + U h ) + T max w } ) for all the initialized populations and select the best cluster head.

Step 3: Set the iteration number t = 0.

Step 4: Set t max as the maximum iteration

Step 5: Check the termination criteria <t max; if it is greater, then replace the initial position with the updated position else generate the random numbers for determining the best values.

Step 6: Gather every node from the initial population and follow three steps to find out the best cluster head node.

Step 7: At first, as per equation ( Ę new , i = Ę best + α × r ( Ę mean Ę i ) ) , in which α is a position control parameter with a value between 5 and 10, and r is a random number between 0.5 and 2, the bald eagle selects the region to hunt for the best solution.

Further, evaluate the fitness function for both the new position and the best position for acquiring the best search space.

Step 8: The bald eagle can choose the hunting area depending on the search space using an equation:

Ę i , new = Ę i + y ( i ) × ( Ę i Ę i + 1 ) + x ( i ) × ( Ę i Ę mean )

where x ( i ) = xr ( i ) max | xr | and γ ( i ) = γ r ( i ) max | γ r |

xr ( i ) = r ( i ) × sin ( θ ( i ) ) , yr ( i ) = r ( i ) × cos ( θ ( i ) )

θ ( i ) = α × π × rand and r ( i ) = θ ( i ) + R × rand , where C 1 , C 2 { 0.1 } .

Like search space, it also finds the fitness and acquires the best position for select space.

Step 9: In this swooping stage, bald eagle deploying search space’s new position for swooping the prey towards.

Step 10: Repeat the above step until it attains the termination criteria.

6 BAB method

The BAB method is developed with the forward sequence branching rule. If the jobs are strung together at the first k places in the search tree, the nodes at level k are representative of the initial partial order. The derived lower bound (LB) determines the cost of the unscheduled orders, and the objective function determines the cost of scheduling the orders at a particular node. The BAB technique is dominant if the node has LB ≥ UB at each level. The backtracking method is then used to repeat the process until all nodes have been considered. Backtracking is the step in the BAB method that leads from the lowest to the highest level. Some researchers have worked out a method BAB [47,48,49].

The BAB method’s efficiency largely hinges on the effectiveness of the bounding strategies. Calculating UB and LB accurately prunes solution space, leading to faster and more efficient optimal solutions in various combinatorial and optimization problems.

6.1 Upper bound

This subsection introduces the three UBs, we will be chosen the best one as follows:

UB = min { UB 1 , UB 2 , UB 3 }

  1. UB 1 : Where the n jobs are ordered in the (WDSPT) rule, that is sequencing the jobs in non-decreasing order of

    w 1 e α p 1 1 e α p 1 w 2 e α p 2 1 e α p 2 w m e α p m 1 e α p m

  2. UB 2 : Where the n jobs are ordered in the (EDD) rule, that is sequencing the jobs in increasing order of due dates d 1 d 2 d m and then the cost is calculated.

  3. UB 3 : This UB was determined by employing the MCA. MCA provides an estimate of the best possible solution that can be achieved, which can be used to guide and improve the BAB process. In addition, MCA’s adaptive search mechanisms can generate high-quality UBs by exploring different regions of the solution space and using cooperative strategies. Also, MCA can dynamically update the UB based on its ongoing search, providing more accurate and relevant UBs during the BAB process. Hence, the BAB method can more effectively prune branches of the search tree. MCA’s UBs help the BAB method to focus on more promising regions of the solution space. By providing a good estimate of the best possible solution, MCA guides the search more efficiently, leading to faster convergence to the optimal or near-optimal solution.

6.2 Lower bound

The LB is one of the most important constraints in determining a satisfactory solution to a problem. Obtaining LB for an NP-hard multi-objective problem is clearly difficult. A decomposition of the problem (TA) will be utilized here. In order to determine a LB for problem TA, we divided the problem into three subproblems (3), (4), and (5), as illustrated in:

(3) N 1 = min σ ( h ) = h = 1 m w h ( 1 e α c σ ( h ) ) s . t C σ ( h ) p σ ( h ) C σ ( h ) = C σ ( h 1 ) + p σ ( h ) 0 < α < 1 w σ ( h ) 1 , p σ ( h ) > 0 , d σ ( h ) > 0 h from 1 to m ,

(4) N 2 = min σ ( h ) = h = 1 m U σ ( h ) s . t C σ ( h ) p σ ( h ) C σ ( h ) = C σ ( h 1 ) + p σ ( h ) U ( h ) = 1 if C ( h ) > d σ ( h ) 0 otherwise p σ ( h ) > 0 , d σ ( h ) > 0 h from 1 to m ,

(5) N 3 = min σ ( h ) = T max w s . t C σ ( h ) p σ ( h ) C σ ( h ) = C σ ( h 1 ) + p σ ( h ) L ( h ) = C ( h ) d ( h ) T ( h ) max { C ( h ) d ( h ) , 0 } w σ ( h ) 1 , p σ ( h ) > 0 , d σ ( h ) > 0 , T σ ( h ) 0 h from 1 to m .

For subproblem ( 3 ) , we used the WDSPT rule w h e r p h 1 e r p h [3] to solve 1 / / h = 1 m w h ( 1 e α c h ) problem, for subproblem ( 4 ) , the Moor algorithm (MA) [50] was used to solve 1 h = 1 m U h problem, and for the subproblem ( 5 ) the Lawler algorithm (LA) [51] was used to solve 1 T max w problem.

The following steps of algorithm

Step 1: Enter: n , p h , d h , and w h where h from 1 to m.

Step 2: Order the jobs by using the (WDSPT) rule.

Step 3: Calculate the value for each job h that schedules the jobs in non-decreasing order of ratio: w h e α p h 1 e α p h and compute h = 1 m w h ( 1 e α c h ) ( WDSPT ) = h = 1 m U h ( WDSPT ) = T max w = (WDSPT) the WDSPT gives optimal solution.

Step 4: We obtain that LB 1 = WDSPT .

Step 5: Order the jobs using the (EDD)-rule.

Step 6: Calculate the value for each job h that schedules the jobs in non-decreasing order of of due dates d h and compute ( h = 1 m w h ( 1 e α c h ) ( MA ) ) = h = 1 m U h ( MA ) = T max w = ( MA ) the MA gives optimal solution.

Step 7: We obtain that LB 2 = MA .

Step 8: Let h * such that f h * h M p h = min h f f h h M p h .

Step 9: Set M = M { h * } and sequence job h * in σ , i.e., σ = ( h * , σ ) . Modify F to represent the new set of schedulable jobs.

Step 10: If M = φ STOP; otherwise, go to step (9).

Step 11: Compute ( h = 1 m w h ( 1 e α c h ) ( LA ) ) = h = 1 m U h ( LA ) = T max w = ( LA ) the LA gives optimal solution.

Step 12: We obtain that LB 3 = LA .

Step 13: LB = LB 1 + LB 2 + LB 3 .

7 Computational results

To verify and evaluate the performance of the MCA for solving the multi-objective model based on a single-machine scheduling problem, we used a variety of problems with medium and big size limits and significantly equal constraint sizes from 3 to 30,000 jobs. The results also compare the performance of MCA with two other methods: BESOA and BAB method. The processing time is uniformly distributed across in U [ 1,10 ] , and weights were generated from the set {1,2,…,10}, which is now a standard method for creating single-machine scheduling problems with due dates. The due dates are uniformly distributed within the range [P(1 − TF-RDD/2), P(1 − TF + RDD/2)], where P = j = 1 n p j , which is influenced by the relative range of due date (RDD) and the average tardiness factor (TF). The TF value is extracted from the set of values 0.1, 0.2, 0.3, 0.4, and 0.5, while the RDD value is obtained from the set of values 0.8, 1.0, 1.2, 1.4, 1.6, and 1.8. According to an analysis of the algorithms’ performances, the MATLAB programming language encoded and resolved these comparable examples. As the stopping criterion, each algorithm, including MCA, BESOA, and BAB, was executed for 1,000 iterations. Table 1 shows all parameters set for the MCA and BESOA.

Table 1

Parameters (MCA and BESOA)

MCA BESOA
m = n = 6 α [ 5,10 ]
c = 2 r [ 0.5,2 ] .
C = n m 1
F r = 0.3
C r = 0.25
k = 2

For the performance on small jobs (3–18 jobs), the algorithms show nearly identical results when dealing with a few jobs. Table 2 shows the results of the BAB method for the problem with different values of n (n = 3–13), the optimal value, the UB, the initial LB, the computing time in seconds (time) that the BAB is stopped after a fixed period of time, here after 1,800 s (i.e., after 30 min). In Table 3, for instance, the completion times for MCA, BESOA, and BAB are virtually identical for three orders and are each reporting approximately 21.60 units. As the job size increases to 12 jobs, MCA significantly outperforms BAB, MCA’s average completion time is 92.41 units, BAB average completion time: 123.56 units. BESOA’s performance remains very close to MCA’s at 92.54 units, indicating that BESOA and MCA are better suited for even small job sizes than BAB. For job sizes between 500 and 1,000, MCA shows an advantage in both performance and scalability compared to BAB. For 500 jobs, MCA records an average completion time of 4433.84 units, while BESOA slightly edges it out with 4402.76 units. BAB does not have available results at this scale, which could indicate its limitations with larger datasets. For 750 jobs, MCA yields 6662.68 units, while BESOA performs slightly better at 6626.59 units. Again, BAB’s results are missing in this range. At 1,000 jobs, MCA clocks 9121.45 units, closely followed by BESOA at 9059.63 units, showing that both algorithms can effectively handle medium-scale job sizes. In addition, for the Jobs (20,000–30,000 jobs). When tackling 20,000 jobs, MCA achieved 183,071.57 units in completion time. This demonstrates that MCA can handle large-scale scheduling problems without significant performance degradation. Unfortunately, BESOA and BAB do not produce results in this range, implying potential limitations in these methods for extremely large datasets. At the upper end, with 30,000 jobs, MCA reports a completion time of 273,323.27 units, further confirming its scalability. We can conclude that MCA shows robust performance across all job sizes. Its ability to handle job counts up to 30,000 without any significant performance loss is a testament to its efficiency and scalability. Tuning parameters such as population size, mutation rate, and crossover rate ensure an optimal balance between exploration and exploitation. Although it is competitive with BESOA, MCA’s performance is marginally lower than BESOA for medium job sizes (500–1,000 jobs).

Table 2

Comparison results BAB with ( n = 3 13 )

n Av. of UB Av. of LB Av. of BAB Av. of time
3 21.60018091 14.69335723 21.60018073 Ver
4 21.23403563 21.28426712 21.23403563 Ver
5 44.46860132 29.53891478 43.13134148 Ver
6 52.39646015 30.91867809 50.77212583 Ver
7 62.91662674 34.16032028 58.15483137 Ver
8 64.60277214 40.26112022 59.33084972 Ver
9 86.30803146 51.64899101 78.73443725 Ver
10 106.6516991 57.84292984 98.73360194 3.289942
11 109.1562874 56.81628265 96.84323284 13.35572437
12 104.9581734 55.37373085 92.414069 123.5631877
13 117.8423424 68.08335323 103.1497112 790.4244712
Table 3

Comparison results between MCA and BESOA with ( n = 3 30 , 000 )

n MCA BESOA Best value
Av. of MCA Av. of time Av. of BES Av. of time
3 21.60018091 Ver 21.60018091 Ver 21.60018091
4 21.23403575 Ver 21.23403575 Ver 21.23403575
5 43.13134127 Ver 43.13134127 Ver 43.13134127
6 50.77212601 Ver 50.77212601 Ver 50.77212601
7 58.15483208 Ver 58.15483208 Ver 58.15483208
8 59.33085098 Ver 59.33085098 Ver 59.33085098
9 78.7344368 Ver 78.82521896 Ver 78.7344368
10 98.73360138 Ver 98.73546371 Ver 98.73360138
11 96.8432312 Ver 97.24269104 Ver 96.8432312
12 92.41406898 Ver 92.53869667 Ver 92.41406898
13 103.2228207 Ver 103.3695221 Ver 103.0840004
14 113.1100166 Ver 113.3693558 Ver 113.1100166
15 105.9779259 Ver 106.1474007 Ver 105.9779259
16 127.433773 Ver 127.433773 Ver 127.433773
17 138.5919113 Ver 140.1413879 Ver 138.5886749
18 142.9502785 Ver 144.1621925 Ver 142.9502785
19 145.7566879 Ver 147.6488274 Ver 145.7566879
20 177.9658623 Ver 178.7056702 Ver 177.9626106
25 216.0834427 Ver 218.0747879 Ver 215.7490799
30 241.8208191 Ver 242.9052719 Ver 241.4472733
35 286.6710388 Ver 290.0697525 Ver 286.16922
40 310.0009354 Ver 311.6062653 Ver 309.4566055
45 371.494136 Ver 373.6911591 Ver 370.5327942
50 368.2818085 Ver 365.8695709 Ver 363.8038086
100 886.5877319 Ver 887.0128784 Ver 883.5224304
150 1269.941943 Ver 1258.826587 Ver 1258.070142
200 1800.366394 Ver 1791.468628 1.8059691 1790.628101
250 2186.928687 Ver 2174.076563 2.5731 2173.921033
500 4433.843042 1.3063921 4402.761548 5.1519146 4400.566048
750 6662.680957 1.985482 6626.586523 7.6567608 6618.163184
1,000 9121.448633 2.613544 9059.625684 10.000 9059.625684
1,250 11465.10869 3.2811735
1,500 13631.59043 4.0678417
1,750 15755.91357 4.7154018
2,000 18242.31357 5.4730787
2,500 22725.31875 7.2085663
5,000 45462.90313 16.1576449
10,000 91449.23672 33.515658
15,000 137490.7961 49.1566127
20,000 183071.5672 54.2131458
30,000 273323.2672 95.0794322

8 Conclusion

In this study, a new multi-objective model for a single-machine scheduling problem was used MCA as a novel metaheuristic approach for solving the model. Additionally, we enhanced the BAB method by incorporating MCA to improve its UB calculations. Our results demonstrate that this integration significantly improves the performance of the BAB method, achieving outcomes in up to 13 test cases. Based on the results, The MCA offers advantages over BESOA and BAB regarding accuracy and computational efficiency for multi-objective single-machine scheduling problems. MCA excels with its diverse solution representation, adaptive search strategies, and ability to handle multi-objective optimization effectively and solve up to 30,000 jobs. While, the second rank was the BESOA delivered and solved up to 1,000. However, MCA does have limitations related to parameter tuning, scalability, convergence speed, and resource consumption. Future research can address these limitations by developing automated tuning methods, scalable algorithms, dynamic adaptations, and resource-efficient implementations, enhancing MCA’s effectiveness and applicability in real-world scenarios. In addition, some suggestions for further studies based on multi-objective model for a single machine scheduling problem.

Acknowledgements

The authors would like to express their gratitude and appreciation to the referees and editors for their constructive suggestions and valuable remarks, which have helped improve this article.

  1. Funding information: The authors received no specific funding for this study.

  2. Author contributions: Tahani Jabbar Khraibet: conceptualization, methodology, formal analysis, investigation, writing – original draft, visualization, writing – review & editing. Bayda Atiya Kalaf, Wafaa Mansoor: conceptualization, methodology, writing – review & editing, project administration, supervision.

  3. Conflict of interest: The authors declare no conflict of interest.

  4. Data availability statement: The data used in this study were specifically created for simulation purposes and not derived from real-world sources.

References

[1] Baker KR, Trietsch D. Principles of sequencing and scheduling, 2nd edn. Set in 10/12pt Warnock by SPi Global, Pondicherry, India Printed: © 2019. John Wiley & Sons, Inc. Edition, 2009. 10.1002/9781119262602.Search in Google Scholar

[2] Stevenson WJ. Operations management. Fourteenth. New York-United States of America: McGraw-Hill Education; 2021.Search in Google Scholar

[3] Pinedo ML. Scheduling: Theory, algorithms, and systems. Nova Iorque: Springer-Verla; 2016. 10.1007/978-3-319-26580-3.Search in Google Scholar

[4] Janis SN, Sven S, Udo B. A systematic review of multi-objective hybrid flow shop scheduling. Eur J Oper Res. 2023;309:1–23. 10.1016/j.ejor.2022.08.009.Search in Google Scholar

[5] Chachan HA, Hameed AS. Exact methods for solving multi-objective problem on single machine scheduling. Iraqi J Sci. 2019;60:1802–13. 10.24996/ijs.2019.60.8.17.Search in Google Scholar

[6] Ezugwu AS. Metaheuristic optimization for sustainable unrelated parallel machine scheduling: A concise overview with a proof-of-concept study. IEEE Access. 2024;12:3386–416. 10.1109/ACCESS.20233347047.Search in Google Scholar

[7] Noor AR, Yossra HA, Tarik AR. Unraveling the veling the versatility and impact of multi-objectiv ersatility and impact of multi-objective optimization: Algorithms, applications, and trends for solving complex real-world problems. J Soft Comput Computer Appl. 2024;1:1–18. 10.70403/3008-1084.1008.Search in Google Scholar

[8] Yin J, Huang R, Sun H, Ca S. Multi-objective optimization for coordinated production and transportation in prefabricated construction with on-site lifting requirements. 2024;189:110017. 10.1016/j.cie.2024.110017.Search in Google Scholar

[9] Wolpert DH, Macready WG. No free lunch theorems for optimization. IEEE Trans Evol Comput. 1997;1:67–82. 10.1109/4235.585893.Search in Google Scholar

[10] Srinivasan V, Boopathi CS, Sridhar R. A new meerkat optimization algorithm based maximum power point tracking for partially shaded photovoltaic system. Ain Shams Eng J. 2021;12:3791–802. 10.1016/j.asej.2021.03.017.Search in Google Scholar

[11] Navrinder K, Sarabjeet K. Optimized data hiding method based on Meerkat Clan Algorithm for image steganography. Int Res J Eng Appl Sci. 2023;11:12–8. 10.55083/irjeas.2022.v11i01002.Search in Google Scholar

[12] El-Shorbagy M, Bouaoudab A, Nabwey HA, Abualigahd L, Fatma A, Hashim FA. Bald eagle Search Algorithm: A comprehensive review with its variants and applications. Syst Sci Control Eng. 2024;12:1–59. 10.1080/21642583.2024.2385310.Search in Google Scholar

[13] Wenyan GW, Hou1 Z, Dai1 F, Wang X, Qiang Q. Bald eagle Search Optimization Algorithm combined with spherical random shrinkage mechanism and its application. J Bionic Eng. 2024;21:572–605. 10.1007/s42235-023-00446-7.Search in Google Scholar

[14] Kindt VT, Croce FD. A Single machine adversarial bilevel scheduling problems. Eur J Oper Res. 2024;315(1):63–72. 10.1016/j.ejor.2023.11.018.Search in Google Scholar

[15] Al-Zuwanini MK, Janam KA. Branch and bound method to solve multi objectives function. J Adv Math. 2014;9:2485–95. 10.24297/jam.v12i3.494.Search in Google Scholar

[16] Al-Zuwanini MK, Khraibet TJ. Branch and bound method to solve multi objectives function. J Adv Math. 2016;12:5964–74. 10.24297/jam.v12i3.494.Search in Google Scholar

[17] Abbass DA. Using branch and bound and local search methods to solve multi-objective machine scheduling problem. 2019 First International Conference of Computer and Applied Sciences (CAS). 10.1109/CAS47993.2019.9075460.Search in Google Scholar

[18] Ibrahim MH, Ali FH, Chachan HA. Solving multi-objective’s function problem using branch and bound and local search methods. Int J Nonlinear Anal Appl (IJNAA). 2022;13:1649–58. 10.22075/ijnaa.2022.5780.Search in Google Scholar

[19] Ahmed MG, Ali FH. Exact method with dominance rules for solving scheduling on a single machine problem with multiobjective function. Al-Mustansiriyah J Sci. 2022;33:56–63. 10.23851/mjs.v33i2.1091.Search in Google Scholar

[20] Neamah NM, Atiya Bk, Mansoor W. Solving tri-criteria: Total completion time, total earliness, and maximum tardiness using exact and heuristic methods on single-machine scheduling problems. Math Model Eng Probl. 2024;11:987–95. 10.18280/mmep.110415.Search in Google Scholar

[21] Atiya Bk, Bakheet AJ, Abbas IT, Bakar MR, Soon LL, Monsi MB. Application of simulated annealing to solve multi-objectives for aggregate production planning. AIP Conf Proc. 2016;1739:020086-1–020086-6. 10.1063/1.4952566.Search in Google Scholar

[22] Bakar MR, Abbas IT, Kalal MA, AlSattar HA, Bakhayt AG, Atiya Bk. Solution for multi-objective optimisation master production scheduling problems based on swarm intelligence algorithms. J Comput Theor Nanosci. 2017;14:5184–94. 10.1166/jctn.2017.6729.Search in Google Scholar

[23] Khraibet TJ, Ghafil WK. Using hybrid GA-PSO algorithm to solve problem in machine scheduling. J Discrete Math Sci Cryptogr. 2021;24(7):2027–35. 10.1080/09720529.2021.1958998.Search in Google Scholar

[24] Yousif SF, Ali FH. Solving maximum early jobs time and range of lateness jobs times problem using exact and Heuristic methods. Iraqi J Sci. 2024;65:923–37. 10.24996/ijs.2024.65.2.28.Search in Google Scholar

[25] Abbas IT, Ghayyib MN. Using sensitivity analysis in linear programming with practical physical applications. Iraqi J Sci. 2024;65:907–22. 10.24996/ijs.2024.65.2.27.Search in Google Scholar

[26] Neamah NM, Atiya BK. Solving tri-criteria: Total completion time, total late work, and maximum earliness by using exact, and heuristic methods on single machine scheduling problem. Iraqi J Computer Sci Math. 2024;5:14–25. 10.52866/ijcsm.2024.05.03.002.Search in Google Scholar

[27] Zlobinsky N, Cheng L. A metaheuristic algorithm for single machine. South Afr Inst Electr Eng. 2018;109:58–68. 10.23919/SAIEE.2018.8531800.Search in Google Scholar

[28] Jiaji L, Yuvraj G, Appadoo SS. Algorithms for a two-agent single machine scheduling problem to minimize weighted number of tardy jobs. J Inf Optim Sci. 2021;42(4):785–811. 10.1080/02522667.2020.1816637.Search in Google Scholar

[29] Ali FH, Ahmed MG. Local search methods for solving total completion times, range of lateness and maximum tardiness problem. 6th International Engineering Conference” Sustainable Technology and Development IEC; 2020. 10.1109/IEC49899.2020.9122821.Search in Google Scholar

[30] Moharam R, Ali A, Morsy E, Ahmed MA, Mostafa MS. A discrete chimp optimization algorithm for minimizing tardy/lost penalties on a single machine scheduling problem. IEEE Access. 2022;10:52126–38. 10.1109/ACCESS.2022.3174484.Search in Google Scholar

[31] Antonio CA, Fernandez V. A modified harmony search for the T-single machine scheduling problem with variable and flexible maintenance. Expert Syst Appl. 2022;198:116897. 10.1016/j.eswa.2022.116897.Search in Google Scholar

[32] Wu H, Zheng H. Single-machine scheduling with periodic maintenance and learning effect. Sci Rep. 2023;13:1–16. 10.1038/s41598-023-36056-w.Search in Google Scholar PubMed PubMed Central

[33] Stanković A, Petrović G, Ćojbašić Z, Marković Z. An application of metaheuristic optimization algorithms for solving the flexible job-shop scheduling problem. Oper Res Eng Sci: Theory Appl. 2020;3:13–28. 10.31181/oresta20303013s.Search in Google Scholar

[34] Mohammadi G, Moaddabi E. Using two metaheuristic algorithms for scheduling parallel machines with sequence dependent set-up times in job shop industries. Int J Syst Sci. 2021;52:2904–17. 10.1080/00207721.2021.1913534.Search in Google Scholar

[35] Xinyu Li LG, Zhang O, Gao L. Domain knowledge used in meta-heuristic algorithms for the job-shop scheduling problem: Review and analysis. Tsinghua Sci Technol. 2024;29:1368–89. 10.26599/TST.2023.9010140.Search in Google Scholar

[36] Sadiq AT, Abdullah HS, Ahmed ZO. Solving flexible job shop scheduling problem using Meerkat Clan Algorithm. Iraqi J Sci. 2018;59:753–61. 10.24996/ijs.2018.59.2A.13.Search in Google Scholar

[37] Mohamad AS, Ahmed TS. Modified Meerkat Clan Algorithm for association rules mining. Baghdad Sci J. 2024;21(5):1743–53. 10.21123/bsj.2023.8018.Search in Google Scholar

[38] Hussein SA, Yousif AY. An improved Meerkat Clan Algorithm for solving 0-1 knapsack problem. Iraqi J Sci. 2022;63:773–84. 10.24996/ijs.2022.63.2.32.Search in Google Scholar

[39] Saleh MA, Sadiq AT. Modified Meerkat Clan Algorithm for association rules mining. Baghdad Sci J. 2023;21:1743–53. 10.21123/bsj.2023.8018.Search in Google Scholar

[40] Alsattar HA, Zaidan AA, Zaidan BB. Novel meta-heuristic Bald Eagle Search Optimization Algorithm. Artif Intell Rev. 2020;53:2237–64. 10.1007/s10462-019-09732-5.Search in Google Scholar

[41] Huang Y, Jiang H, Wang W, Sun D. Prediction model of soil electrical conductivity based on ELM optimized by Bald Eagle Search Algorithm. Electron J. 2021;25:50–6. 10.53314/ELS2125050H.Search in Google Scholar

[42] Alsaidan I, Shaheen AM, Hasanien HM, Alnafisah AS. A PEMFC model optimization using the enhanced Bald Eagle Algorithm. Ain Shams Eng J. 2022;13:1–11. 10.1016/j.asej.2022.101749.Search in Google Scholar

[43] Wang Y, Zhang W, Sun J, Wang L, Song X, Zhao X. Survival risk prediction of esophageal squamous cell carcinoma based on BES-LSSVM. Comput Intell Neurosci. 2022;1–12. 10.1155/2022/3895590.Search in Google Scholar PubMed PubMed Central

[44] Kankılıç S, Karpat E. Optimization of multilayer absorbers using the Bald Eagle Optimization Algorithm. Appl Sci. 2023;13:1–17. 10.3390/app131810301.Search in Google Scholar

[45] Zaky AA, Ghoniem RM, Selim F. Precise modeling of proton exchange membrane fuel cell using the modified Bald Eagle Optimization Algorithm. Sustainability. 2023;15:1–16. 10.3390/su151310590.Search in Google Scholar

[46] Youssef H, Kamel S, Hassan MH, Nasrat L, Jurado F. An improved Bald Eagle Search Optimization Algorithm for optimal home energy management systems. Soft Comput. 2024;8:1367–90. 10.1007/s00500-023-08328-0.Search in Google Scholar

[47] Abdul-Razaq TS. Machine scheduling problems: A branch and bound approach. (Ph.D. Thesis). Keele University; 1987.Search in Google Scholar

[48] Forget N, Gadegaard SL, Nielsen LR. Warm-starting lower bound set computations for branch-and-bound algorithms for multi objective integer linear programs. Eur J Oper Res. 2022;302(3):909–24. 10.1016/j.ejor.2022.01.047.Search in Google Scholar

[49] Bożejko W, Pempera J, Uchroński M, Wodecki M. Quantum annealing-driven branch and bound for the single machine total weighted number of tardy jobs scheduling problem. Future Gener Computer Syst. 2024;155:245–55. 10.1016/j.future.2024.02.016.Search in Google Scholar

[50] Moore JM. An n job one machine algorithm for minimizing the number of late jobs. Manag Sci. 1968;15:102–9. https://www.jstor.org/stable/2628449.10.1287/mnsc.15.1.102Search in Google Scholar

[51] Lawler EL. Optimal sequencing of a single machine subject to precedence constraints. Manag Sci. 1973;19:544–6. 10.1287/mnsc.19.5.544.Search in Google Scholar

Received: 2024-08-07
Accepted: 2024-12-04
Published Online: 2025-02-26

© 2025 the author(s), published by De Gruyter

This work is licensed under the Creative Commons Attribution 4.0 International License.

Articles in the same Issue

  1. Research Articles
  2. Synergistic effect of artificial intelligence and new real-time disassembly sensors: Overcoming limitations and expanding application scope
  3. Greenhouse environmental monitoring and control system based on improved fuzzy PID and neural network algorithms
  4. Explainable deep learning approach for recognizing “Egyptian Cobra” bite in real-time
  5. Optimization of cyber security through the implementation of AI technologies
  6. Deep multi-view feature fusion with data augmentation for improved diabetic retinopathy classification
  7. A new metaheuristic algorithm for solving multi-objective single-machine scheduling problems
  8. Estimating glycemic index in a specific dataset: The case of Moroccan cuisine
  9. Hybrid modeling of structure extension and instance weighting for naive Bayes
  10. Application of adaptive artificial bee colony algorithm in environmental and economic dispatching management
  11. Stock price prediction based on dual important indicators using ARIMAX: A case study in Vietnam
  12. Emotion recognition and interaction of smart education environment screen based on deep learning networks
  13. Supply chain performance evaluation model for integrated circuit industry based on fuzzy analytic hierarchy process and fuzzy neural network
  14. Application and optimization of machine learning algorithms for optical character recognition in complex scenarios
  15. Comorbidity diagnosis using machine learning: Fuzzy decision-making approach
  16. A fast and fully automated system for segmenting retinal blood vessels in fundus images
  17. Application of computer wireless network database technology in information management
  18. A new model for maintenance prediction using altruistic dragonfly algorithm and support vector machine
  19. A stacking ensemble classification model for determining the state of nitrogen-filled car tires
  20. Research on image random matrix modeling and stylized rendering algorithm for painting color learning
  21. Predictive models for overall health of hydroelectric equipment based on multi-measurement point output
  22. Architectural design visual information mining system based on image processing technology
  23. Measurement and deformation monitoring system for underground engineering robots based on Internet of Things architecture
  24. Face recognition method based on convolutional neural network and distributed computing
  25. OPGW fault localization method based on transformer and federated learning
  26. Class-consistent technology-based outlier detection for incomplete real-valued data based on rough set theory and granular computing
  27. Detection of single and dual pulmonary diseases using an optimized vision transformer
  28. CNN-EWC: A continuous deep learning approach for lung cancer classification
  29. Cloud computing virtualization technology based on bandwidth resource-aware migration algorithm
  30. Hyperparameters optimization of evolving spiking neural network using artificial bee colony for unsupervised anomaly detection
  31. Classification of histopathological images for oral cancer in early stages using a deep learning approach
  32. A refined methodological approach: Long-term stock market forecasting with XGBoost
  33. Enhancing highway security and wildlife safety: Mitigating wildlife–vehicle collisions with deep learning and drone technology
  34. An adaptive genetic algorithm with double populations for solving traveling salesman problems
  35. EEG channels selection for stroke patients rehabilitation using equilibrium optimizer
  36. Influence of intelligent manufacturing on innovation efficiency based on machine learning: A mechanism analysis of government subsidies and intellectual capital
  37. An intelligent enterprise system with processing and verification of business documents using big data and AI
  38. Hybrid deep learning for bankruptcy prediction: An optimized LSTM model with harmony search algorithm
  39. Construction of classroom teaching evaluation model based on machine learning facilitated facial expression recognition
  40. Artificial intelligence for enhanced quality assurance through advanced strategies and implementation in the software industry
  41. An anomaly analysis method for measurement data based on similarity metric and improved deep reinforcement learning under the power Internet of Things architecture
  42. Review Articles
  43. A comprehensive review of deep learning and machine learning techniques for early-stage skin cancer detection: Challenges and research gaps
  44. An experimental study of U-net variants on liver segmentation from CT scans
  45. Strategies for protection against adversarial attacks in AI models: An in-depth review
  46. Resource allocation strategies and task scheduling algorithms for cloud computing: A systematic literature review
  47. Latency optimization approaches for healthcare Internet of Things and fog computing: A comprehensive review
Downloaded on 19.9.2025 from https://www.degruyterbrill.com/document/doi/10.1515/jisys-2024-0373/html
Scroll to top button