The Use of Simulation Models in Solving the Problems of Merging two Plants of the Company

  • Michal Sedláček EMAIL logo
Published/Copyright: March 20, 2017
Become an author with De Gruyter Brill

Abstract

This paper focuses on utilization of analysis of different possibilities of merging two production sites with the help of simulation model of company processes. Software SIMUL8 was chosen as a development environment for its possibility of dynamic discrete simulation of company processes. In the first phase, it analyses current status of both production sites. It is followed by suggesting several possible solutions for their potential merger. Each solution is analyzed with the help of simulation models. They have been evaluated and the optimal solution was selected.

1 Introduction

The modern trend in these days is to optimize everything that we can, especially in logistics processes. The result is the achievement of predetermined targets, such as minimizing inventory in stock, optimal utilization of handling equipment, shortening shipping routes and the introduction of lean production [1, 2]. Procedures and methods for achieving successful targets are many [36]. One of them is the use of modeling and simulation of logistics processes. This method allows a reliable view of the possible development of production. For example, it is possible to model the entire production hall, including a detailed model of individual production lines and movements between them. So we have a simple way to test an infinite number of variants to solve the problem and for the actual implementation to choose the best possible solution to the situation.

Simulations helps to detect problems and complications that resulted in normal operation and save significant costs that we had to then spend on their removal. In practice it is impossible to try different alternatives, in terms of irreversible steps that are expensive. Modeling and simulations can be a powerful tool for optimizing logistic processes. Some methods, which uses simulation models in solving logistic processes, were presented in [79].

This article aims to demonstrate the use of a simulation models in solving the logistical problems of merging two separate manufacturing plants of a company that specializes in the manufacture of interior parts for the automotive industry. Management of the company thought about merging these two plants into one department. Simulation models were used as a basis to study the impact of this decision.

2 Methods

As a basis for the creation of simulation models, analyzed processes of both production plants has been used. Gradual steps has been compiled in simulation models using SIMUL8 simulation software to get the most accurate results. Data from these models were used for the final evaluation. For our purposes we chose discrete simulation model. The appropriateness of discrete simulation model use is justified by the turn of events of particular activities. Each activity is assigned with a specific time and its distribution function. Distribution function affect duration of time period of the activity.

2.1 Discrete simulation

Discrete simulation models [10] are characterized, that all the state variables takes only discrete values and change over time in jump steps [1115]. Discrete dynamical system is a mathematical structure designed by main three components:

  1. Intervals in which all the possible values of the state variables lays;

  2. Function defined on specific interval;

  3. Differential equation which represents the “movement” equation of the system.

We quantify this change in terms of an updating function, which takes the current state of the system as an input, and specifies what the state of the system will be after some interval of time, an interval which corresponds to the specific updating function we are using. In general, an updating function is written:

mt+1=f(mt),(1)

where mt is the current state of the system, and mt+1 is the state of the system after one interval of time has passed. By iterating the above calculation multiple times, we can find subsequent states of of the system. Equation can be written in the form:

ff(mt)=f(f(mt))=f(mt+1)=mt+2.(2)

This equation describes the changing states of the system in dependence on time. This equation is also used as a theoretical basis for understanding discrete time steps in simulation model that we created.

2.2 Input preconditions of the simulation model

The manufacturing enterprise which we describe, is engaged in the Czech Republic since 1994. It focuses on the production of interior components for the automotive industry. Customers are the most car manufacturers in the world, for example, ŠKODA AUTO, Volkswagen, Toyota, Ford, Mercedes Benz, BMW. The entire production processes, including supply of material, is controlled by the system “just in time”. Company operates two mutually separate production and storage halls. These production halls were located approximately 10 kilometers apart. Management of the company thought about merging these two separate plants into one. The requirement was to analyze the current situation and to build the simulation models for each operation to get the most accurate results. From the simulation models was created a demonstration model for integrated operations.

Plant A was the original plant with two production lines. The final products were stored in the warehouse of finished products. The area included the basic material warehouse. The basic material for Plant B was dispatched on transport car. Furthermore, there was positioned manufacture of polyurethane boards (PUR), which were used as material for final production. Finished blanks for external supplies were stored in a warehouse PUR. And the whole operation worked in three shifts mode of working week in time period from Sunday 22:00 to Friday 22:00.

Plant B was built in 2011 as a completely new production space with four production lines. There was a warehouse of finished products with final shipment according to customers’ orders. The area also includes a warehouse base material. The store did not correspond to the actual needs to cover all production requirements. Therefore, there was placed only safety stock to cover the requirements of the production for one day. All the basic material was imported on transport car from the store base material warehouse in Plant A. Another part of the Plant B was the space for waste treatment. The entire Plant B functioned as Plant A in three-shift mode with a working period from Sunday 22:00 to Friday 22:00.

2.3 Conceptual models of Plants A and B

Before the start of the creation of a simulation model in a computer program, it is necessary to create a conceptual models (Figure 1 and Figure 2) for some basic understanding of the system. Figure 1 shows how the entity passes through the system. At the start of processes, there is the receipt and storage of the material. This is followed by the transfer of the material to production, where it becomes the finished product taken by the warehouse finished production. During the production, waste is formed and it must be taken for disposal. Production of PUR (polyurethane) has its own material warehouse at the production line. Finished preparations intended for its own production being shipped to the warehouse of materials. Semi-finished products for external customers being shipped to the warehouse of PUR. Finished products, PUR, waste and materials for the operation of Plant B must pass through the expedition, and then leaves the Plant A.

Figure 1 Conceptual models of Plants A and B – original solutions.
Figure 1

Conceptual models of Plants A and B – original solutions.

Figure 2 Conceptual model of Plant B – modified solution (Options 2 and 3).
Figure 2

Conceptual model of Plant B – modified solution (Options 2 and 3).

Conceptual model of Plant B is similar to the Plant A. Figure 1 also shows a running of the entities through the system of Plant B. The beginning of the processes is the receipt of material followed by material storage. The transporting materials follow to production across four production lines. On production lines they are becoming a material of the final product and a waste. Finished products are placed in a warehouse of finished products and waste is weighted at the disposal. Finished products in the warehouse of finished products and waste must be delivered after expedition, and then leaves Plant B. Conceptual models were modified to create simulation models in some variants of plants merging (Figure 2).

3 Solution

According to the conceptual model of Plant A, its simulation model was assembled. The simulation model was divided into several parts: Receipt of material, Basic material warehouse, Production lines, Warehouse finished products, production PUR, PUR Warehouse, Waste Management and Expedition.

The simulation model of Plant B (Figure 3) is fully based on the above conceptual model. The simulation model of Plant B consists of practically identical parts as a model of Plant A. In the first phase we formed the backbone network of traffic routes, to which the individual parts successively implemented the model. Those parts are Material receipt, followed by Material warehouse extended on four storage branch for supplying four production lines. Stock of finished products is extended to four branches. At the end of the chain is Waste management and Expedition.

Figure 3 Simulation model of Plant B Option 2.
Figure 3

Simulation model of Plant B Option 2.

3.1 Processing of solution proposals

Simulation models of Plant A and B were processed and verified. During their creation, the individual parts of the models were subjected to testing their functionality. These tests should verify the actual functionality of the model that there are no errors during the simulation procedure. Simulation models of Plant A and B are in very good agreement with reality.

These models serve as a starting models to build three variants of a possible merger of the operations. For each variant, a conceptual design model of the mergers (Figure 2) was created and compiled its simulation model. Simulation models were verified and validated.

Three possible options of plants merging were created:

  • Option 1 - moving the entire production capacity (excluding the production of PUR) from Plant A to Plant B, the base material will be imported into Plant B on transport car.

  • Option 2 - very similar to Option 1 - a reallocation of entire production capacity (excluding the production of PUR) from Plant A to a new Plant B and transfer the complete storage base material warehouse. In Plant B stays only manufacturing and warehouse of PUR, transportation is provided by transport car.

  • Option 3 - merge two manufacturing plants into one - the entire operations of the Plant A moves to Plant B. This solution requires extension of the storage capacity of the base material. It is also necessary to build a completely new space for production and storage of PUR.

3.2 Creation of models and simulation experiments

Simulation models of the different options were made, verified, validated and prepared for simulation experiments. The actual simulation models were compiled by preparation or deletion of some parts. For example, by simple moving of production lines A1 and A2 of Plant A into Plant B. Integral parts of the model, their parameters and location were also changed. The main part of the model, that is changing as a result of the new traffic arrangements, is the number of forklifts needed for the transfer of all entities within the system of loading and unloading operations.

Simulation experiments works mainly with different numbers of forklifts and explores how changes the individual output data from the model. With the resulting data, it is decided how many forklifts are needed for the smooth running of operations.

Length of the simulation experiments reflects a three shift operation with time period from Sunday 22:00 to Friday 22:00. It corresponds to 7200 minutes of simulation time. The default number of forklifts for Plant A is five pieces and for Plant B is seven pieces.

Basic criteria of simulation experiments:

  • Supply of basic materials on the routes may not be 0, there would be a cessation of production;

  • A queue of finished products on a line can be up to three times the size of a shipping container;

  • Waste on a line can be up to three times the size of a shipping container;

  • The average queue length for receiving the material and for dispensing the material into Plant B must be less than 120 minutes;

  • The average queue length for dispensing material to the line from the warehouse to dispense of finished products from the warehouse of finished products and for dispensing polyurethane must be less than 60 minutes.

4 Results

By using simulation experiments, we obtained results for different alternatives. The first criterion is the number of forklifts. The default number of forklifts used for the Plant A is five and seven for Plant B. That’s twelve forklifts required for the smooth operation of both plants. According to the results we may serve different variants of solving the following number of forklifts that met the conditions:

  1. Option 1 - total of 10 pieces of forklifts;

  2. Option 2 - total of 8 pieces of forklifts;

  3. Option 3 - total of 10 pieces of forklifts.

The results of simulation experiments show that all three variants can save forklifts compared to the basic arrangement of the two plants. Namely, Option 1 and 3 two pieces and Option 2 four pieces of forklifts. It is necessary also to take into account a possible error of handling forklifts, in simulation models we are introducing it [the error] as a random variable number.

The second criterion is the demands on design variants in real traffic. Option 1 requires no alterations, only the necessary costs of moving two production lines from Plant A into Plant B, Options 2 and 3 require building modifications and merge plants without them is impossible. Processing projects in various alterations can be accurately quantified by the costs of the various options - merger savings compared to using fewer forklifts. It is possible now to decide, which of the proposed variants of solution is the best for optimum cost savings.

Qualified estimates of the cost of project implementation:

  1. To expand the store base material – cost 4 750 000 CZK;

  2. Construction costs for new space for PUR manufacturing – cost 10 620 000 CZK;

  3. For Option 1, the summary removal costs is 526 400 CZK;

  4. For Option 2, the summary removal costs is 812 710 CZK;

  5. For Option 3, the summary removal costs is 1 287 300 CZK;

  6. Average monthly cost on transport cars are among cost 196 000 CZK;

  7. Average monthly cost per head including forklifts service - cost 132 060 CZK.

Table 1 shows the final costs of individual optimization solutions variants - the total cost of implementation, the monthly savings considering the lower number of forklifts, the return of investment and the absolute savings (after deducting the cost of implementation in the period of next 5 years).

Table 1

Final costs of individual solutions – Options 1-3.

Option 1Option 2Option 3
Total cost526 400 CZK5 562 710 CZK16 657 300 CZK
Monthly savings264 120 CZK528 240 CZK460 120 CZK
Return of InvestmentApprox. 2 monthsApprox. 10.5 monthsApprox. 36 months
Total savings over 5 years15 320 800 CZK26 131 690 CZK10 949 900 CZK

From presented results we can say, that in terms of return of Investment is the best Option 1. From the perspective of the overall cost savings in the next 5 years is the best Option 2. As the best solution was selected the Option 2. Production capacity of Plant A moves into Plant B, expand the storage of materials in Plant B and move the rest of the warehouse of Plant A. Option 2 has a refund of investments in period of 10.5 months, overall spared costs are twice as compared to the Option 1. Option 3 has costly high-refund period of investments.

5 Conclusion

Possibilities of using of the simulation models in praxis are large. Simulation models can be used with advantage in dealing with different logistical problems. As example can be the models of production logistics, distribution logistics, reverse logistics, transportation logistics and logistics services [3, 7, 16, 17]. In other fields simulation models are used to solve problems of crisis management and obtaining input data for solving various problems of human activities [8, 9, 18]. Simulation tools occupy an important place in improving the efficiency of logistics processes of companies, among them we can mention the so-called digital factory [10, 19] and a production information systems based on an internet of things [2, 20]. The aim of this paper is to demonstrate the specific use of simulation models for solving the merging of two manufacturing operation places located a few kilometers away from each other. This problem was solved in a manufacturing enterprise and subsequently realized. Simulation model was served as a basis for strategic decisions of the company management. We present an analyses of initial state of the two production plants and the preparation of conceptual models and simulation models for each operation. The paper describes three variants of merging two production plants, describes the assembly simulation experiments, execution and evaluation of the different options according to the simulation results. Simulation models has been used in solving the specific logistical problem - the merging of two manufacturing plants in the real company.

References

[1] Martoch T., Kodym O., Production information systems based on the internet of things, In: SGEM 2013 International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, Albena, Bulgaria, 2013, 207–21210.5593/SGEM2013/BB2.V1/S07.027Search in Google Scholar

[2] Andrejiová M., Pavlisková A., Husáková N., Application of multicriterion decision methods by the selection of optimal constructive elements for devices of continuous transport, In: Carpathian Logist. Congr., TANGER LTD. Ostrava, 2012, 1–6Search in Google Scholar

[3] Kolomaznik K., Cujan Z., Blaha A., Mladek M., Mathematicalphysical models for the description of selected process of the hide and leather treatment, In: Proceedings - 7th Congress on the Leather Industry (1982, Budapest, Hungary), OMIKKTechnoinform, 1982, 1–6Search in Google Scholar

[4] Fedorko G., Čujan Z., Optimization in modern business practice, In: 12th International Conference on Industrial Logistics (11-13 June 2014, Island Brac, Croatia), Faculty of Mechanical Engineering and Naval Architecture, 2014, 167–175Search in Google Scholar

[5] Molnár V., Boroška J., Dečmanová J., Mechanical properties of steel rope wires – quality test assurance, Acta Montan. Slovaca, 2010, 15(1), 23–30Search in Google Scholar

[6] Fedorko G., Molnár V., Strohmandl J., Vasi’l M., Development of Simulation Model for Light-Controlled Road Junction in the Program Technomatix Plant Simulation, In: Transp. Means 2015, Kaunas University of Technology, Lithuania, Kaunas, 2015, 466–469Search in Google Scholar

[7] Kodym O., Kavka L., Sedláček M., Logistic chain data processing, In: SGEM 2015 International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, Albena, Bulgaria, 2015, 183–19010.5593/SGEM2015/B21/S7.024Search in Google Scholar

[8] Fedorko G., Husáková N., Dudáš G., Design of allocation of new technological equipment within the frame of production process in company Getrag Ford Transmissions Slovakia, s.r.o., Acta Montan. Slovaca, 2010, 15, 14–22Search in Google Scholar

[9] MolnárV., SAP warehouse management system for a warehouse of auxiliary material in the selected company, In: Carpathian Logist. Congr., TANGER LTD. Ostrava, 2012, 1–6Search in Google Scholar

[10] Křivý I., Kindler E., Simulace a modelování, Ostrava: OU, 2001Search in Google Scholar

[11] Ficzere P., Ultmann Z., Torok A., Time–space analysis of transport system using different mapping methods, Transport, 2014, 3(29), 278–28410.3846/16484142.2014.916747Search in Google Scholar

[12] Bartošfková R., Bílfková J., StrohmandlJ., Šefčík V., Taraba P., Modelling of decision-making in crisis management, In: 24th International Business Information Management Association Conference - Crafting Global Competitive Economies: 2020 Vision Strategic Planning and Smart Implementation, Milano, 2014, 1479–1483Search in Google Scholar

[13] Li S., Wang X., Study on dangerous signal mining of dangerous goods transport vehicles, International Journal of Control and Automation, 2015, 8(2), 71–8210.14257/ijca.2015.8.2.08Search in Google Scholar

[14] Neradilova H., Fedorko G., Digital factory – efficient tool for increasing logistic efficiency of companies, Acta Logistica Moravica, 2015, 1, 36–43Search in Google Scholar

[15] SIMUL8, Corporation. Simul8: manual and simulation guide, Herndon, VA: The Corporation, 2001Search in Google Scholar

[16] Groznik A., Maslaric M., Investigating the impact of information sharing in a twolevel supply chain using business process modeling and simulations: A case study, In: Proceedings - 23rd European Conference on Modelling and Simulation, ECMS 2009, Madrid, 2009, 1–610.7148/2009-0039-0045Search in Google Scholar

[17] Torok A., Torok A., Heinitz, F., Usage of production functions in the comparative analysis of transport related fuel consumption, Transport and Telecommunication, 2014, 15(4), 292–29810.2478/ttj-2014-0025Search in Google Scholar

[18] Čičak M., Mlinarić T., Abramović B., Methods for determining throughput capacity of railway lines using coefficients of elimination, Promet - Traffic - Traffico, 2004, 16(2), 63–69Search in Google Scholar

[19] Nikolic J., Ristovic I., Vasovic D., System modelling for environmental management of mining and energy complex based on the strategy principles of Sustainable balanced scorecard method (SBSC), Journal of Environmental Protection and Ecology, 2015, 16(3), 1082–1090Search in Google Scholar

[20] Husáková N., Honus S., Reverse Material Flow of Worn-Out Conveyor Belts, Applied Mechanics and Materials, 2014, 683, 183–18810.4028/www.scientific.net/AMM.683.183Search in Google Scholar

Received: 2016-6-25
Accepted: 2016-8-1
Published Online: 2017-3-20

© 2017 Michal Sedláček

This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.

Articles in the same Issue

  1. Regular Articles
  2. The Differential Pressure Signal De-noised by Domain Transform Combined with Wavelet Threshold
  3. Regular Articles
  4. Robot-operated quality control station based on the UTT method
  5. Regular Articles
  6. Regression Models and Fuzzy Logic Prediction of TBM Penetration Rate
  7. Regular Articles
  8. Numerical study of chemically reacting unsteady Casson fluid flow past a stretching surface with cross diffusion and thermal radiation
  9. Regular Articles
  10. Experimental comparison between R409A and R437A performance in a heat pump unit
  11. Regular Articles
  12. Rapid prediction of damage on a struck ship accounting for side impact scenario models
  13. Regular Articles
  14. Implementation of Non-Destructive Evaluation and Process Monitoring in DLP-based Additive Manufacturing
  15. Regular Articles
  16. Air purification in industrial plants producing automotive rubber components in terms of energy efficiency
  17. Regular Articles
  18. On cyclic yield strength in definition of limits for characterisation of fatigue and creep behaviour
  19. Regular Articles
  20. Development of an operation strategy for hydrogen production using solar PV energy based on fluid dynamic aspects
  21. Regular Articles
  22. An exponential-related function for decision-making in engineering and management
  23. Regular Articles
  24. Usability Prediction & Ranking of SDLC Models Using Fuzzy Hierarchical Usability Model
  25. Regular Articles
  26. Exact Soliton and Kink Solutions for New (3+1)-Dimensional Nonlinear Modified Equations of Wave Propagation
  27. Regular Articles
  28. Entropy generation analysis and effects of slip conditions on micropolar fluid flow due to a rotating disk
  29. Regular Articles
  30. Application of the mode-shape expansion based on model order reduction methods to a composite structure
  31. Regular Articles
  32. A Combinatory Index based Optimal Reallocation of Generators in the presence of SVC using Krill Herd Algorithm
  33. Regular Articles
  34. Quality assessment of compost prepared with municipal solid waste
  35. Regular Articles
  36. Influence of polymer fibers on rheological properties of cement mortars
  37. Regular Articles
  38. Degradation of flood embankments – Results of observation of the destruction mechanism and comparison with a numerical model
  39. Regular Articles
  40. Mechanical Design of Innovative Electromagnetic Linear Actuators for Marine Applications
  41. Regular Articles
  42. Influence of addition of calcium sulfate dihydrate on drying of autoclaved aerated concrete
  43. Regular Articles
  44. Analysis of Microstrip Line Fed Patch Antenna for Wireless Communications
  45. Regular Articles
  46. PEMFC for aeronautic applications: A review on the durability aspects
  47. Regular Articles
  48. Laser marking as environment technology
  49. Regular Articles
  50. Influence of grain size distribution on dynamic shear modulus of sands
  51. Regular Articles
  52. Field evaluation of reflective insulation in south east Asia
  53. Regular Articles
  54. Effects of different production technologies on mechanical and metallurgical properties of precious metal denture alloys
  55. Regular Articles
  56. Mathematical description of tooth flank surface of globoidal worm gear with straight axial tooth profile
  57. Regular Articles
  58. Earth-based construction material field tests characterization in the Alto Douro Wine Region
  59. Regular Articles
  60. Experimental and Mathematical Modeling for Prediction of Tool Wear on the Machining of Aluminium 6061 Alloy by High Speed Steel Tools
  61. Special Issue on Current Topics, Trends and Applications in Logistics
  62. 10.1515/eng-2017-0001
  63. Special Issue on Current Topics, Trends and Applications in Logistics
  64. The Methodology of Selecting the Transport Mode for Companies on the Slovak Transport Market
  65. Special Issue on Current Topics, Trends and Applications in Logistics
  66. Determinants of Distribution Logistics in the Construction Industry
  67. Special Issue on Current Topics, Trends and Applications in Logistics
  68. Management of Customer Service in Terms of Logistics Information Systems
  69. Special Issue on Current Topics, Trends and Applications in Logistics
  70. The Use of Simulation Models in Solving the Problems of Merging two Plants of the Company
  71. Special Issue on Current Topics, Trends and Applications in Logistics
  72. Applying the Heuristic to the Risk Assessment within the Automotive Industry Supply Chain
  73. Special Issue on Current Topics, Trends and Applications in Logistics
  74. Modeling the Supply Process Using the Application of Selected Methods of Operational Analysis
  75. Special Issue on Current Topics, Trends and Applications in Logistics
  76. Possibilities of Using Transport Terminals in South Bohemian Region
  77. Special Issue on Current Topics, Trends and Applications in Logistics
  78. Comparison of the Temperature Conditions in the Transport of Perishable Foodstuff
  79. Special Issue on Current Topics, Trends and Applications in Logistics
  80. E-commerce and its Impact on Logistics Requirements
  81. Topical Issue Modern Manufacturing Technologies
  82. Wear-dependent specific coefficients in a mechanistic model for turning of nickel-based superalloy with ceramic tools
  83. Topical Issue Modern Manufacturing Technologies
  84. Effects of cutting parameters on machinability characteristics of Ni-based superalloys: a review
  85. Topical Issue Desktop Grids for High Performance Computing
  86. Task Scheduling in Desktop Grids: Open Problems
  87. Topical Issue Desktop Grids for High Performance Computing
  88. A Volunteer Computing Project for Solving Geoacoustic Inversion Problems
  89. Topical Issue Desktop Grids for High Performance Computing
  90. Improving “tail” computations in a BOINC-based Desktop Grid
  91. Topical Issue Desktop Grids for High Performance Computing
  92. LHC@Home: a BOINC-based volunteer computing infrastructure for physics studies at CERN
  93. Topical Issue Desktop Grids for High Performance Computing
  94. Comparison of Decisions Quality of Heuristic Methods with Limited Depth-First Search Techniques in the Graph Shortest Path Problem
  95. Topical Issue Desktop Grids for High Performance Computing
  96. Using Volunteer Computing to Study Some Features of Diagonal Latin Squares
  97. Topical Issue on Mathematical Modelling in Applied Sciences, II
  98. A polynomial algorithm for packing unit squares in a hypograph of a piecewise linear function
  99. Topical Issue on Mathematical Modelling in Applied Sciences, II
  100. Numerical Validation of Chemical Compositional Model for Wettability Alteration Processes
  101. Topical Issue on Mathematical Modelling in Applied Sciences, II
  102. Innovative intelligent technology of distance learning for visually impaired people
  103. Topical Issue on Mathematical Modelling in Applied Sciences, II
  104. Implementation and verification of global optimization benchmark problems
  105. Topical Issue on Mathematical Modelling in Applied Sciences, II
  106. On a program manifold’s stability of one contour automatic control systems
  107. Topical Issue on Mathematical Modelling in Applied Sciences, II
  108. Multi-agent grid system Agent-GRID with dynamic load balancing of cluster nodes
Downloaded on 24.9.2025 from https://www.degruyterbrill.com/document/doi/10.1515/eng-2017-0004/html?lang=en
Scroll to top button