Chapter
Publicly Available
Frontmatter
-
Jane Murphy Thomas
Chapters in this book
- Frontmatter i
- Contents vii
- List of Illustrations viii
- List of Anecdotes and Ethnographies ix
- Preface. Stakeholder Remarks xii
- Acknowledgments xv
- List of Abbreviations xvii
- Maps xviii
- Introduction. Disaster Strikes 1
- Chapter 1. The Moment the Quake Struck 15
- Chapter 2. Contexts of a Reconstruction Site 38
- Chapter 3. Community Participation: What Has Happened to It? 82
- Chapter 4. The Social Component 115
- Chapter 5. Social and Technical Integration 175
- Chapter 6. PERRP Design and Construction 211
- Chapter 7. The Library Challenge 252
- Chapter 8. The Social Anthropology of Reconstruction 265
- Conclusion 280
- Appendix. Schools and Health Facilities Constructed in the Pakistan Earthquake Reconstruction and Recovery Project (2006–2013) 290
- References 292
- Index 308
Chapters in this book
- Frontmatter i
- Contents vii
- List of Illustrations viii
- List of Anecdotes and Ethnographies ix
- Preface. Stakeholder Remarks xii
- Acknowledgments xv
- List of Abbreviations xvii
- Maps xviii
- Introduction. Disaster Strikes 1
- Chapter 1. The Moment the Quake Struck 15
- Chapter 2. Contexts of a Reconstruction Site 38
- Chapter 3. Community Participation: What Has Happened to It? 82
- Chapter 4. The Social Component 115
- Chapter 5. Social and Technical Integration 175
- Chapter 6. PERRP Design and Construction 211
- Chapter 7. The Library Challenge 252
- Chapter 8. The Social Anthropology of Reconstruction 265
- Conclusion 280
- Appendix. Schools and Health Facilities Constructed in the Pakistan Earthquake Reconstruction and Recovery Project (2006–2013) 290
- References 292
- Index 308