Home COVID 19 and Force Majeure/Extraordinary Event Clauses: It’s Time to Dust Them Off
Article
Licensed
Unlicensed Requires Authentication

COVID 19 and Force Majeure/Extraordinary Event Clauses: It’s Time to Dust Them Off

An analysis of scope, limits and potential of FME Clauses as contractual tool
  • John Beardwood
Published/Copyright: August 15, 2020
Become an author with De Gruyter Brill

Published Online: 2020-08-15
Published in Print: 2020-08-01

© 2020 by Verlag Dr. Otto Schmidt KG, Gustav-Heinemann-Ufer 58, 50968 Köln.

Downloaded on 26.11.2025 from https://www.degruyterbrill.com/document/doi/10.9785/cri-2020-210402/html
Scroll to top button