Home Power Transmission Network Investment as an Anticipation Problem
Article
Licensed
Unlicensed Requires Authentication

Power Transmission Network Investment as an Anticipation Problem

  • Vincent Rious , Yannick Perez and Jean-Michel Glachant
Published/Copyright: December 6, 2011

Power generation and transmission are complementary activities that must be coordinated to ensure an optimal use and development of the transmission network. This coordination is today more difficult in a liberalized system, because of unbundling and the freedom for investors to choose their generation technologies (Joskow, 2006). Shorter investment time between generation and network create uncertainty for the network planning and congestions. In the economic literature, the efficiency of anticipating generation investment has been under-evaluated assuming that it is a cost free activity. Our model evaluates the effect of anticipation costs and defines in which cases the previous results by Sauma and Oren (2006, 2007) could still hold.

Published Online: 2011-12-6

©2012 Walter de Gruyter GmbH & Co. KG, Berlin/Boston

Downloaded on 31.10.2025 from https://www.degruyterbrill.com/document/doi/10.2202/1446-9022.1284/html?lang=en
Scroll to top button