Study on Pollution Cost Control Model under Asymmetric Information Based on Principal Agent
-
Lina Wang
Abstract
Pollution cost control is key to solve pollution problem. The paper takes pollution control cost of pollution control contract between management authority and pollutant discharge enterprise as research object, considers pollution control quality level, pollution control quality inspection and pollution control cost model, and establishes pollution control cost model of management authority and pollutant discharge enterprise, including rational constraints of pollutant discharge enterprise. And it analyzes principal-agent relationship between the two under condition of asymmetric information, and un-observability of pollution control level is shown as hiding information of sewage enterprises. In essence, it is problem of adverse selection in principal-agent. Pollution control cost of management is objective function. The first order condition of pollution control cost of sewage enterprise is transformed into state space equation, and optimal control of problem is solved by using maximum principle. In particular, management authority, as principal, uses pollution control provisions to reward, punish and encourage pollutant discharge enterprises as agents.
1 Introduction
Emission cost control is key to solve problem of pollution[1]. Under premise of implementation of emission permit system, emission enterprises can purchase emission rights provided by management authority. In this way, management authority can invest in pollution control projects of emission enterprises, and formulate pollution level within allowable range of emission enterprises[2]. At the same time, emission enterprises can control pollution within allowable pollution level. In order to get corresponding policy preference given by management authority, opposite is also true. Of course, pollutant discharge enterprises may not purchase pollutant discharge right, however, because they will inevitably discharge pollutants and have no effective pollution control means, they will exceed the pollution standard and bear risk of being forced to close down. The loss of being forced to close down is bound to be greater than the cost of purchasing pollution right provided by management authority[3]. In fact, several literatures have asymmetric study on SCM. Esmaeili, et al. gave models of supply chain management with an asymmetric information structure[4]. Yao, et al. studied vertical cost information sharing in a supply chain with value-adding retailers[5]. Xiao, et al. created price competition, cost and demand disruptions and coordination of a supply chain with one manufacturer and two competing retailers[6]. Gaudet, et al. discussed real investment decision under adjustment costs and asymmetric information[7]. Yuan, et al. creatively showed material options optimum investment problem models[8]. Besides, Tsay, et al. told us whole picture of modelling supply chain contracts review[9]. Yeom, et al. analysed role of transfer price for coordination and control within a firm[10]. Wang, et al. tried to make SCM implementation decisions under asymmetric information[11]. In addition, some people turn their research focus on environmental protection. Domeier used intergovernmental approaches to achieve hazards and sustainability[12]. Xing, et al. explained multi-pollution collaborative control technology in iron and steel industry[13]. Zhu, et al. studied emission characteristics of multiple pollutants from iron- steel sinter flue gas[14]. Feng, et al. insisted on research on current ambient and elevated ozone effects on poplar[15]. Pu studied technology of multi-pollution optimization models[16]. Song, et al. analyzed energy consumption atmospheric pollutant emissions and carbon emissions[17]. Hu, et al. gave agglomeration characteristics of industrial pollution and their influencing factors on the scale of cities in China[18]. Innes, et al. figured out collaborative rationality for public policy[19]. Kaufman gave out risk perception and communication in public and environmental decisions[20]. Sam, et al. did an empirical study on voluntary pollution reduction programs, environmental management, and environmental performance[21]. Yudkowsky critically discussed cognitive biases potentially affecting judgements of global risks[22].
In one word, less literatures focus on study of applying theories of principal-agent, asymmetric information on pollution cost and/or establish relative control models which is an urgent problem to be solved. The paper just chooses the very view point to deploy research. Basically, as a rational enterprise with profit as goal and sustainable operation as premise, it generally needs to purchase emission rights. Therefore, incentive mechanism of pollution control can be designed according to principal-agent theory. In addition, according to theory of asymmetric information, under condition of emission cost control, private information of emission amount owned by agent of emission enterprises is uncontrollable exogenous information, which is in line with concept of hidden information. Under condition of asymmetric information, both sides can realize information asymmetry, which will be reflected in their pollution control behaviour. In information hiding environment, the most important problem is that in process of contract arrangement, contract selection of sewage enterprises may be contrary to expectation of management authorities, resulting in adverse selection. In the case of hidden behaviour, pollutant discharge enterprises may also make some behaviours that are harmful to interests of management authorities (social benefits) from their own interests, forming moral hazard.
In this paper, pollution control cost of pollution control contract between management authority and pollutant discharge enterprise is taken as research object. Considering pollution control quality level, pollution control quality inspection and pollution control cost model, pollution control cost model of management authority and pollutant discharge enterprise is established, including rational constraints of pollutant discharge enterprise. The paper analyses principal-agent relationship between the two under condition of asymmetric information, and inconceivability of pollution control level is shown as hiding information of sewage enterprises. In essence, it is a problem of adverse selection in principal-agent. The pollution control cost of management is objective function. The first order condition of pollution control cost of sewage enterprise is transformed into state space equation, and optimal control of problem is solved by using maximum principle. In particular, management authority, as principal, uses pollution control provisions to reward, punish and encourage pollutant discharge enterprises as agents.
2 Cost Model of Incentive Mechanism for Pollution Control
Now consider problem of pollution control cost between management and enterprises. This problem includes three parts: Pollution control level, pollution control level test and pollution control cost model. Relative propositions are as follows.
Proposition 1Pollution control level is a set of inherent characteristics and degree to which it meets requirements of environmental protection.
Proposition 2The only standard of pollution control is to take environmental protection requirements as center and reach level of environmental pollution control.
Proposition 3The level of environmental pollution control can be described by an independent continuous random variable, and choice of pollution control level is considered in study of pollution control cost.
Proposition 4The inspection of pollution control level is inspection of pollution control level of sewage enterprises by management authority in problem of pollution cost control. According to inspection results, management authorities decide whether to accept or reject pollution control projects of pollutant discharge enterprises.
Proposition 5In sampling inspection, management authority randomly selects a sample from pollution control projects of pollutant discharge enterprises. If number of unqualified products in sample is more than number of qualified judgement, management will refuse batch of pollution control items.
Based on above, probability of acceptance in sampling inspection can be described as
where Γ(m) is acceptance probability in sampling inspection, m is pollution control level;
Among them, Cb is management’s pollution control cost, and the first P is management’s pollution control supervision provision for sewage enterprises. The provision is a cost that must be paid in operation of economic management, but amount or time has not been determined. Here, provision is incentive of pollution control by management authorities. The meaning of pollution control supervision of provision indicates that if pollution control cost of project provided by pollutant discharge enterprise is satisfactory, pollutant discharge enterprise fee P will be rewarded; if pollution control cost of product provided is not satisfactory, pollutant discharge enterprise fee P will be punished; if pollution control cost just reaches satisfactory level, P = 0. Therefore, pollution control cost provision P is a real number. The second item is inspection cost of management authority for batch of pollution control items. R is unit cost of inspected items, n is number of samples of inspected items, D is total number of items to be tested, and L is batch of items. The cost model of pollution control of sewage enterprises, namely
Among them, Cs is cost of pollution control. The first −P is provision acquisition of pollutant discharge enterprise corresponding to pollution control supervision of management authority. The second is holding cost of pollution control project, where h is cost coefficient of pollution control project, W is manufacturing cost of project, and Q is production batch of project. It is assumed that pollution control project lot L will be directly delivered to management authority, and only (Q − L) products will enter state of waiting for inspection, resulting in holding cost. The third is to set project cost, where k is to set project cost coefficient and D is total project demand. The fourth is internal loss cost of pollution control level. Where s is internal loss cost parameter of pollution control level test. The number of loss control items in pollution control level inspection is also considered in pollution control cost management,
The economic management significance of the above inequality is that production lot size of pollution control project should be greater than or equal to demand lot size.
3 Pollution Level Control Under Asymmetric Information
In pollution control problems (2.2), (2.3) and (2.4) in study of pollution control cost control, if management authority cannot observe pollution control level m of project provided by sewage enterprise. For management authorities, pollution control level information of products of enterprises is hidden. This is a problem of adverse selection. Pollution control is also an asymmetric information problem. In problem of pollution control, pollution control cost of management authority and pollutant discharge enterprise is described by Equations (2.2) and (2.3) respectively, and rational constraints of production lot and demand lot of pollutant control project of pollutant discharge enterprise are described by Equation (2.4). For convenience of problem handling, this paper introduces quadratic constraint of batch size of pollution control enterprises to replace constraint condition (2.4), that is,
where a is coefficient of quadratic constraint, a > 0. It can also be considered that CIR takes rational constraint (3.1) of management authorities on cooperative relationship of sewage enterprises as a cost of batch supply. Thus, objective function of management authority for pollution control under condition of asymmetric information can be established, which is minimum requirement of management authority for pollution control cost under condition of mathematical expectation, that is,
where f(m) is probability density function of pollution control level m, and pollution control level m is randomly distributed in interval [m1,m2]. The objective function describes that management should select control provision P under expected conditions to minimize cost of pollution control Cb and cost of rational constraint CIR. Under condition of asymmetric information, pollution control level of supply project of pollutant discharge enterprise as an agent is hidden from management. However, according to principle of disclosure in principal-agent theory, management can design incentive contracts to reveal factors close to real level of pollution control. Therefore, in process of minimizing cost of pollution control, the first derivative treatment will be applied to production lot Q of project which cannot be observed by management authorities, and of course, reserve variable P will also be included. For model of sewage enterprises (2.3), there is
The conditions of the model (3.3) of pollutant discharge enterprise can be transformed into the first-order conditions, i.e.,
It is noted that Equation (3.3) can be derived from the first-order condition of Equation (3.3) about hidden information, i.e. sewage control level m, in which control variable u is introduced to form Equation (3.5), which means marginal effect of project production lot size on sewage control level m. Obviously, pollution cost control problem (2.2), (2.3), (2.4) under asymmetric information has become an optimal control problem (3.2), (3.4), (3.5). In this optimal control problem, all variables including pollution control level have become m, because pollution control level has been close to real value after revealing principle and incentive strategy. Therefore, pollution control level of following problems are described by real value m. Among them, Equation (3.2) is objective function, Equations (3.4) and (3.5) are state space equations, P(m) and Q(m) are state variables, and u(m) is control variable. According to maximum principle, Hamiltonian function in question, i.e.,
The governing equation of the problem is
The co state equation of problem is
The solutions of Equations (3.8) and (3.9) are
In Equations (3.10) and (3.11), F(m) is distribution function of pollution control level m. The sorting formulas (3.9), (3.10) and (3.11) have cubic equation about production lot Q of project, i.e.,
The sum in Equation (3.12) is expressed as follows:
To solve cubic equation about production lot size of project, we can get solution by eliminating imaginary root, it can be solved as
Among it,
Considering state space Equations (3.4) and (3.5) of pollution cost control problem, production lot Q and reserve P under asymmetric information are solutions (3.15) and (3.4), which are solutions of adverse selection problem. In order to consider expression of Φ in Equation (2.1) in Equation (3.14), there are
According to Equations (3.14) and (3.17), therefore
4 Simulation Experiment on Incentive Mechanism of Emission Cost Control
Suppose that in process of pollution control, an environmental treatment company sets data for cubic equation of production lot Q of project. The quadratic conditional parameters a = 1, C = 0, H = 0.2, k = 5000, d = 20000, t = 100, σ = 10, l = 200, n = 5, r = 0.5 for rational constraint of management authority. Binomial distribution probability distribution function
Here, project cost function is assumed to be w(m) = 100 + exp(0.075(m − T )), which is shown by Equation (3.13), there is
The variable P of management provision has s = 7, and other parameters are set as formula (3.12). Suppose that hidden information pollution control level m in Equation (3.4) obeys the uniform distribution [100, 150], and discretize it: m = m0 + nΔm,m0 = 100,Δm = 1, with
Let P(m0) = 0, then simulate production batch Q of project under different information conditions, allowance P of management authority to sewage enterprise, and cost Cb, Cs. The results are shown as follows:
Under condition of asymmetric information, increase of average pollution control level leads to increase of pollution control cost, which leads to corresponding reduction of project batch.
Corresponding incentive (provision) strategy that management needs to pay to pollutant discharge enterprises according to different project pollution control levels required by management under condition of asymmetric information. It can be seen that with increase of average level of pollution control required, provisions that management needs to pay to pollutant discharge enterprises also increase.
Under condition of asymmetric information, with increase of average pollution control level, pollution control cost of sewage enterprises decreases, pollution control cost of management authorities increases, and total cost of sewage enterprises and management authorities decreases.
Therefore, using this incentive mechanism to control pollution cost and enhance pollution control level of project is conducive to reducing whole pollution control cost and improving management level of pollution control cost as a whole.
5 Conclusion
Emission cost control is an important theoretical and applied problem in management of emission cost control. In this paper, a model of information hiding in emission cost control is established, and optimal control theory is applied to analyze and solve this problem. According to optimal control theory, management can test pollution control items of enterprises one by one. According to pollution control standards and efforts of enterprises, management can use pollution control provisions to motivate enterprises. In order to effectively encourage and control negative emission cost control activities of pollutant discharge enterprises, enterprises that exceed expected effect of pollution control should be compensated and rewarded to a certain extent; enterprises that fail to achieve expected effect should be severely punished and cost of pollution control should not be compensated.
Of course, the above pollution cost control model is only one of feasible models based on the principal-agent theory under condition of asymmetric information. The follow-up research work should start with reward and punishment, supervision, incentive and other mechanisms of pollution control. In addition, should possible outsourcing mode be also one of ideas of pollution control, which is possible research orientation in the future.
Acknowledgements
The authors gratefully acknowledge the Editor and two anonymous referees for their insightful comments and helpful suggestions that led to a marked improvement of the article.
References
[1] Corbett C J, Groote X D. A suppliers optimal quantity discount policy under asymmetric information. Management Science, 2000, 46: 445–450.10.1287/mnsc.46.3.444.12065Search in Google Scholar
[2] Cobett C J, Tang C S. Designing supply contracts: Contract type and information asymmetry. Tayur S, Ganeshan R, Michael M. Quantitative Models for Supply Chain Management. Kluwer Academic Publishers, 2000.10.1007/978-1-4615-4949-9_9Search in Google Scholar
[3] Agrell P J, Bogetoft P. Decentralization policies for supply chain investments under asymmetric information. Managerial & Decision Economics, 2017, 38(3): 394–408.10.1002/mde.2783Search in Google Scholar
[4] Esmaeili M, Zeephongsekul P. Seller-buyer models of supply chain management with an asymmetric information structure. International Journal of Production Economics, 2010, 123(1): 146–154.10.1016/j.ijpe.2009.07.016Search in Google Scholar
[5] Yao D Q, Yue X, Liu J. Vertical cost information sharing in a supply chain with value-adding retailers. Omega, 2008, 36(5): 838–851.10.1016/j.omega.2006.04.003Search in Google Scholar
[6] Xiao T, Qi X. Price competition, cost and demand disruptions and coordination of a supply chain with one manufacturer and two competing retailers. Omega, 2008, 36(5): 741–753.10.1016/j.omega.2006.02.008Search in Google Scholar
[7] Gaudet G, Lasserre P, Van Long N. Real investment decision under adjustment costs and asymmetric information. Journal of Economic Dynamics and Control, 1998, 23: 71–95.10.1016/S0165-1889(97)00107-3Search in Google Scholar
[8] Yuan H X, Tian Z X.Material options optimum investment problem research under asymmetric information. Management Science Journal, 2003, 6: 28–33.Search in Google Scholar
[9] Tsay A, Nahmias S. Modeling supply chain contracts: A review. Tayur S, Ganeshan R, Michael M. Quantitative Models for Supply Chain Management. Boston: Kluwer Academic Publishers, 2000.10.1007/978-1-4615-4949-9_10Search in Google Scholar
[10] Yeom S, Blachandran K, Ronen J. The role of transfer price for coordination and control within a firm. Review of Quantitative Finance and Accounting, 2000, 14: 161–192.10.1023/A:1008355713528Search in Google Scholar
[11] Wang L N, Poelmans S, Milis K. SCM implementation decisions under asymmetric information: An agency approach. Journal of Systems Science and Information, 2020, 8(5): 447–457.10.21078/JSSI-2020-447-11Search in Google Scholar
[12] Domeier P. Environmental management and governance: Intergovernmental approaches to hazards and sustainability. Psychology Press, 2008: 67–69.Search in Google Scholar
[13] Xing F F, Jiang Q, Zhang Y Z. The analysis of multi-pollutant collaborative control technologies of sinter flue gas in iron and steel industry. Environmental Engineering, 2014, 32(4): 75–78.Search in Google Scholar
[14] Zhu T Y, Liu Q, Li Y R. Emission characteristics of multiple pollutants from iron- steel sintering flue gas and review of control technologies. Science & Technology Review, 2014, 32(33): 51–56.Search in Google Scholar
[15] Feng Z Z, Shang B, Gao F, et al. Current ambient and elevated ozone effects on poplar: A global meta-analysis and response relationships. Science of the Total Environment, 2019, 654: 832–840.10.1016/j.scitotenv.2018.11.179Search in Google Scholar PubMed
[16] Pu P F. Study on technology of multi-pollutant optimization net-emission control for coal-fired power plant. Environmental Engineering, 2015, 33(7): 139–143.Search in Google Scholar
[17] Song J K, Liang L L, Kang Z Y. Visualized analysis of the collaborative research on energy consumption, atmospheric pollutant emissions and carbon emissions. Sino-Global Energy, 2018, 23(4): 11–18.Search in Google Scholar
[18] Hu Z Q, Miao J M, Miao C H. Agglomeration characteristics of industrial pollution and their influencing factors on the scale of cities in China. Geographical Research, 2016, 35(8): 1470–1482.Search in Google Scholar
[19] Innes J, Booher D. Planning with complexity: An introduction to collaborative rationality for public policy. New York: Routledge, 2010.10.4324/9780203864302Search in Google Scholar
[20] Kaufman S. Risk perception and communication in public and environmental decisions. Negociations, 2009, 11(1): 159–183.10.3917/neg.011.0159Search in Google Scholar
[21] Sam A G, Khanna M, Innes R. Voluntary pollution reduction programs, environmental management, and environmental performance: An empirical study. Land Economics, 2009, 85(4): 692–711.10.3368/le.85.4.692Search in Google Scholar
[22] Yudkowsky E. Cognitive biases potentially affecting judgments of global risks. Bostrom N, Cirkovic M. Global Catastrophic Risks, Oxford University Press, 2008: 91–119.10.1093/oso/9780198570509.003.0009Search in Google Scholar
© 2021 Walter de Gruyter GmbH, Berlin/Boston
This work is licensed under the Creative Commons Attribution 4.0 International License.
Articles in the same Issue
- The Dynamic Impact of Structural Oil Price Shocks on the Macroeconomy
- The Effect of Green Technology Adoption Strategy on Duopoly Competition
- Measuring the Imbalance of Regional Development from Outer Space in China
- Statistical Inference for a Simple Step Stress Model with Competing Risks Based on Generalized Type-I Hybrid Censoring
- Study on Pollution Cost Control Model under Asymmetric Information Based on Principal Agent
- Topic-Feature Lattices Construction and Visualization for Dynamic Topic Number
Articles in the same Issue
- The Dynamic Impact of Structural Oil Price Shocks on the Macroeconomy
- The Effect of Green Technology Adoption Strategy on Duopoly Competition
- Measuring the Imbalance of Regional Development from Outer Space in China
- Statistical Inference for a Simple Step Stress Model with Competing Risks Based on Generalized Type-I Hybrid Censoring
- Study on Pollution Cost Control Model under Asymmetric Information Based on Principal Agent
- Topic-Feature Lattices Construction and Visualization for Dynamic Topic Number