Home A Note on the Continuous Sampling Plan CSP-V
Article
Licensed
Unlicensed Requires Authentication

A Note on the Continuous Sampling Plan CSP-V

  • Chung-Ho Chen and Chao-Yu Chou
Published/Copyright: February 18, 2010
Become an author with De Gruyter Brill
Stochastics and Quality Control
From the journal Volume 17 Issue 2

Abstract

This note investigates the problem of minimizing the average fraction inspected (AFI) for a CSPV plan. A solution procedure is developed to find the sampling plan parameters that meet the average outgoing quality limit (AOQL) requirement, while minimizing the AFI when the process average (> AOQL) is known.

Published Online: 2010-02-18
Published in Print: 2002-October

© Heldermann Verlag

Downloaded on 10.9.2025 from https://www.degruyterbrill.com/document/doi/10.1515/EQC.2002.235/html
Scroll to top button