Chapter
Licensed
Unlicensed
Requires Authentication
18 Superheater package
-
Mehran Mousapoor
You are currently not able to access this content.
You are currently not able to access this content.
Chapters in this book
- Frontmatter I
- Contents IX
- 1 Introduction 1
- 2 Input data 6
- 3 Boiler heat duty 8
- 4 Required fuel 9
- 5 Forced draft fan discharge mass flow 10
- 6 FD: Fan outlet duct design 17
- 7 FD.Fan outlet duct pressure loss 19
- 8 Furnace width and length 21
- 9 Furnace height 25
- 10 Furnace volume 31
- 11 Furnace exit temperature 32
- 12 Combustion nonluminous heat transfer coefficient 41
- 13 Combustion convection heat transfer coefficient 42
- 14 Combustion outside heat transfer coefficient 45
- 15 Average tube metal temperature 46
- 16 Furnace draft pressure drop 52
- 17 Boiler design pressure 56
- 18 Superheater package 58
- 19 Superheater tube rows and deep number 60
- 20 Superheater convective heat transfer coefficient prediction 62
- 21 Superheater uncontrolled outlet steam temperature prediction 66
- 22 Superheater flue gas draft pressure drop 73
- 23 Superheater package total steam pressure drop 75
- 24 Steam and mud drum sizing 81
- 25 Bank tube average length 89
- 26 Bank tube heat duty prediction 92
- 27 Bank tube heat surface prediction 94
- 28 Steam drum outlet steam temperature 99
- 29 Bank tube bundle flue gas draft pressure drop 106
- 30 Bank tube duct flue gas draft pressure drop 108
- 31 Bank tube total flue gas draft pressure drop 112
- 32 Bank tube area length 113
- 33 Furnace area length 114
- 34 Boiler exit duct flue gas draft pressure drop 115
- 35 Bank tube bundle water pressure drop 117
- 36 Front and rear wall headers sizing 119
- 37 Steam drum to superheater connection header sizing 122
- 38 Economizer heat duty prediction 125
- 39 Economizer tube rows deep no. 126
- 40 Economizer tube arrangement 129
- 41 Economizer tube solid or serrated fins 130
- 42 Economizer convection heat transfer coefficient 133
- 43 Economizer overall heat transfer coefficient 139
- 44 Economizer tubes row number 142
- 45 Economizer package performance 144
- 46 Economizer headers water pressure drop 147
- 47 Economizer tube bundle water pressure drops 150
- 48 Economizer package water pressure drop 152
- 49 Economizer package flue gas draft pressure drops 153
- 50 Economizer outlet duct flue gas draft pressure drops 156
- 51 Circulation ratio 158
- 52 Flue gas stack sizing 170
- 53 Flue gas stack net available draft 173
- 54 Stack outlet flue gas temperature 175
- 55 Stack outlet flue gas velocity 179
- 56 Stack insulation thickness 180
- 57 Force draft fan electric driver 181
- 58 Pressure safety valve sizing 185
- 59 Desuperheater water 191
- 60 Boiler efficiency 192
- 61 Boiler package water weight 196
- 62 Boiler package water weight 203
- 63 Boiler holdup time (retention time) 205
- 64 Steam and mud drum weight 212
- 65 Furnace total tube number 214
- 66 Boiler total tube number 215
- 67 Furnace total tubes weight 216
- 68 Front and rear wall header weight 218
- 69 Superheater package weight 219
- 70 Steam drum to superheater connection header weight 221
- 71 Bank tube package weight 222
- 72 Economizer package weight 223
- 73 Stack weight 226
- 74 Reports 227
- References 241
- Index 243
Chapters in this book
- Frontmatter I
- Contents IX
- 1 Introduction 1
- 2 Input data 6
- 3 Boiler heat duty 8
- 4 Required fuel 9
- 5 Forced draft fan discharge mass flow 10
- 6 FD: Fan outlet duct design 17
- 7 FD.Fan outlet duct pressure loss 19
- 8 Furnace width and length 21
- 9 Furnace height 25
- 10 Furnace volume 31
- 11 Furnace exit temperature 32
- 12 Combustion nonluminous heat transfer coefficient 41
- 13 Combustion convection heat transfer coefficient 42
- 14 Combustion outside heat transfer coefficient 45
- 15 Average tube metal temperature 46
- 16 Furnace draft pressure drop 52
- 17 Boiler design pressure 56
- 18 Superheater package 58
- 19 Superheater tube rows and deep number 60
- 20 Superheater convective heat transfer coefficient prediction 62
- 21 Superheater uncontrolled outlet steam temperature prediction 66
- 22 Superheater flue gas draft pressure drop 73
- 23 Superheater package total steam pressure drop 75
- 24 Steam and mud drum sizing 81
- 25 Bank tube average length 89
- 26 Bank tube heat duty prediction 92
- 27 Bank tube heat surface prediction 94
- 28 Steam drum outlet steam temperature 99
- 29 Bank tube bundle flue gas draft pressure drop 106
- 30 Bank tube duct flue gas draft pressure drop 108
- 31 Bank tube total flue gas draft pressure drop 112
- 32 Bank tube area length 113
- 33 Furnace area length 114
- 34 Boiler exit duct flue gas draft pressure drop 115
- 35 Bank tube bundle water pressure drop 117
- 36 Front and rear wall headers sizing 119
- 37 Steam drum to superheater connection header sizing 122
- 38 Economizer heat duty prediction 125
- 39 Economizer tube rows deep no. 126
- 40 Economizer tube arrangement 129
- 41 Economizer tube solid or serrated fins 130
- 42 Economizer convection heat transfer coefficient 133
- 43 Economizer overall heat transfer coefficient 139
- 44 Economizer tubes row number 142
- 45 Economizer package performance 144
- 46 Economizer headers water pressure drop 147
- 47 Economizer tube bundle water pressure drops 150
- 48 Economizer package water pressure drop 152
- 49 Economizer package flue gas draft pressure drops 153
- 50 Economizer outlet duct flue gas draft pressure drops 156
- 51 Circulation ratio 158
- 52 Flue gas stack sizing 170
- 53 Flue gas stack net available draft 173
- 54 Stack outlet flue gas temperature 175
- 55 Stack outlet flue gas velocity 179
- 56 Stack insulation thickness 180
- 57 Force draft fan electric driver 181
- 58 Pressure safety valve sizing 185
- 59 Desuperheater water 191
- 60 Boiler efficiency 192
- 61 Boiler package water weight 196
- 62 Boiler package water weight 203
- 63 Boiler holdup time (retention time) 205
- 64 Steam and mud drum weight 212
- 65 Furnace total tube number 214
- 66 Boiler total tube number 215
- 67 Furnace total tubes weight 216
- 68 Front and rear wall header weight 218
- 69 Superheater package weight 219
- 70 Steam drum to superheater connection header weight 221
- 71 Bank tube package weight 222
- 72 Economizer package weight 223
- 73 Stack weight 226
- 74 Reports 227
- References 241
- Index 243