Home Energy Planning with Air Pollution Constraints
Article
Licensed
Unlicensed Requires Authentication

Energy Planning with Air Pollution Constraints

  • Davide Lauria , Fabio Mottola and Paola Verde
Published/Copyright: September 8, 2006

Electrical energy planning of modern electric power system requires great attention for the air pollution problem. This is in accordance to the increasing tendency to optimise the production processes in the respect of their sustainability. Moreover, the advent of the deregulation in the electric energy market has involved substantial modifications of philosophy in planning and managing the electrical power system. These aspects together offer new challenge in defining proper system study methodologies and suitable planning strategies. One of the most complex problems in the planning strategies is the data management uncertainty related to load forecasting and environmental modelling. In this paper a robust optimal planning procedure is formalized, taking adequately into account the problem of stochastic variables presence, allowing to satisfy the air quality and load demand forecast constraints in spite of uncertainties. The proposed approach addresses generation planning, where the various aspects have been integrated to solve the problem in a feasible and realistic way. A numerical application to an electrical power system with respect to a regional area is reported in the final part of the paper, showing the applicability of the proposed methodology.

Published Online: 2006-9-8

©2011 Walter de Gruyter GmbH & Co. KG, Berlin/Boston

Downloaded on 24.9.2025 from https://www.degruyterbrill.com/document/doi/10.2202/1553-779X.1275/html
Scroll to top button