Home Benchmark analysis of unintended simultaneous opening of three main steam relief valves at Ignalina nuclear power plant
Article
Licensed
Unlicensed Requires Authentication

Benchmark analysis of unintended simultaneous opening of three main steam relief valves at Ignalina nuclear power plant

  • B. Cesna , S. Rimkevicius and E. Urbonavicius
Published/Copyright: November 2, 2023
Become an author with De Gruyter Brill

Online erschienen: 2023-11-02
Erschienen im Druck: 2003-02-01

© 2023 by Walter de Gruyter Berlin/Boston

Downloaded on 29.9.2025 from https://www.degruyterbrill.com/document/doi/10.1515/kern-2003-681-211/html?lang=en
Scroll to top button