Home Multi-project Scheduling using a Heuristic and Memetic Alogrithm
Article
Licensed
Unlicensed Requires Authentication

Multi-project Scheduling using a Heuristic and Memetic Alogrithm

  • S. Kumanam, and K. Raja,
Published/Copyright: December 1, 2009
Become an author with De Gruyter Brill

Published Online: 2009-12

©2011 by Walter de Gruyter GmbH & Co.

Downloaded on 17.9.2025 from https://www.degruyterbrill.com/document/doi/10.1515/IJMSP.2009.10.3-4.249/html
Scroll to top button